PASADENA ECONOMIC DEVELOPMENT CORPORATION
Pasadena, Texas
REQUEST FOR QUALIFICATIONS (RFQ) 26-022
Professional Electrical Engineering Services for
Pasadena Convention Center Parking Lot
Issue Date: July 8, 2026
Responses Due: July 27, 2026, 4:00 p.m. CST
1. Introduction and Intent
The Pasadena Economic Development Corporation (PEDC), a Texas Type B Economic
Development Corporation, is soliciting Statements of Qualifications (SOQs) from qualified
engineering firms to provide professional electrical engineering services associated with the
completion of electrical infrastructure and lighting improvements for the Convention Center parking
lot located at 7902 Fairmont Parkway in Pasadena, Texas.
The parking lot has been constructed; however, electrical service and parking lot lighting have not
yet been installed. The selected firm will assist PEDC in evaluating existing site conditions and
developing the engineering documents necessary to complete the project.
2. Project Background
PEDC recently completed construction of a parking lot at the Convention Center property. To
complete the project, electrical service must be established and parking lot lighting installed.
Preliminary discussions with the electric utility provider indicate that an electrical load analysis and
evaluation of existing conduit infrastructure may be required to determine service requirements
and verify the suitability of existing infrastructure for the proposed lighting system.
PEDC seeks qualifications from firms with demonstrated experience in electrical engineering, site
lighting design, utility coordination, and construction document preparation.
PEDC anticipates making the following information available to the selected consultant:
• Existing parking lot construction plans
• Civil/site plans
• Survey information (if available)
• As-built drawings (if available)
• Existing utility information in PEDC's possession
3. Project Objective
The objective of this project is to complete the remaining electrical infrastructure improvements for
the Convention Center parking lot through the installation of permanent electrical service, site
lighting, and associated electrical infrastructure necessary to improve safety and support the safe,
efficient, and reliable use of the parking facility.
4. Scope of Services
The selected firm shall provide professional engineering services that may include, but are not
limited to, the following:
Page | 1
• Review available plans, reports, and project documentation.
• Conduct a site visit and evaluate existing conditions.
• Assess existing conduit infrastructure and determine whether modifications or additional
infrastructure are necessary.
• Perform electrical load calculations and service analysis.
• Coordinate with CenterPoint Energy (or other applicable electric utility provider) to establish
service requirements, service location, meter requirements, transformer requirements (if
applicable), easements (if required), and construction sequencing.
• Prepare sealed engineering plans, specifications, and construction documents suitable for
permitting, bidding, and construction, including all plans, specifications, details, schedules,
and supporting calculations necessary for installation of the electrical service, parking lot
lighting, and associated electrical infrastructure.
• Develop an opinion of probable construction cost.
• Provide bidding and procurement support, if requested.
• Provide limited construction phase services and technical assistance, if requested.
Construction phase services, if requested, may include:
o Preconstruction meeting
o Shop drawing review
o Responses to RFIs
o Site observations
o Final punch list
o Substantial Completion inspection
If authorized by PEDC, these services are optional and will be negotiated as part of the final
Professional Services Agreement..
PEDC reserves the right to modify the scope of services during contract negotiations.
5. Deliverables
At a minimum, the firm selected shall provide the following deliverables, as applicable and
necessary to complete the project:
• Technical memorandum summarizing existing conditions, findings, and recommendations.
• Electrical load analysis and service requirements assessment.
• Evaluation of existing conduit and related infrastructure, including recommendations for
modifications or additional infrastructure if required.
• Coordination documentation and correspondence with the applicable electric utility provider.
• Sealed engineering plans, specifications, and construction documents suitable for bidding
and construction.
• Opinion of probable construction cost.
• Responses to requests for information (RFIs) and technical support during bidding, if
requested.
• Limited construction-phase engineering support, if requested.
PEDC reserves the right to modify or supplement deliverables during contract negotiations based
on project needs and available funding.
6. Anticipated Project Schedule
PEDC anticipates the following schedule (subject to change):
Page | 2
• RFQ issued: July 8, 2026
• Questions deadline: July 17, 2026
All questions that might require an addendum must be submitted in writing to the
Purchasing Department, Attn: Karen Wallace at 1149 Ellsworth Dr., Ste 400, Pasadena,
TX 77506, emailed to kwallace@pasadenatx.gov or faxed to (713) 920-7938. If required,
written addendum will be issued within four (4) business days to respondents that have
received this RFQ as well as posted on the City of Pasadena website, the Pasadena EDC
website, and DemandStar.com.
• SOQs due: By 4:00 p.m. CST on July 27, 2026
• Shortlist & Interviews (if necessary): August 3, 2026
• Consultant selection and notice of intent to award: August 7, 2026
• Contract Execution: Week of August 17, 2026
• Project kickoff: August 24, 2026
7. Minimum Qualifications
Responding firms shall:
• Be authorized to conduct business in the State of Texas.
• Employ or retain a Professional Engineer licensed in the State of Texas.
• Demonstrate experience with electrical distribution, site lighting, parking lot lighting, and utility
coordination projects.
• Demonstrate successful completion of similar projects within the past five years.
The selected consultant will be required to provide certificates of insurance evidencing coverage in
the types and amounts required under the Professional Services Agreement prior to contract
execution.
8. Submittal Requirements
Interested firms should submit a concise SOQ that includes the following components. The PEDC
encourages brevity and clarity. Submittals should not exceed 20 pages, excluding covers and
required documents.
i. Cover Letter
Brief statement of interest
ii. Firm Profile
Firm History
Office Location(s)
Areas of expertise
iii. Project Team
Key personnel
Relevant experience
Texas PE registration information
iv. Relevant Project Experience
Description of at least three (3) comparable projects
Client references
Page | 3
v. Project Approach and Understanding
Narrative describing the firm’s understanding of project objectives
Proposed approach to key scope elements, including existing conditions
vi. Schedule and Management
Description of project management approach, quality control, and communication with
staff
Preliminary project schedule identifying anticipated milestones from notice to proceed
through delivery of final construction documents
9. RFQ Submittal Envelope
Proposal must be placed in a sealed envelope that is completely and properly identified with the
name of the firm, RFQ number, due date and time. The sealed envelope must include the original
printed submission and a digital copy on a USB drive. It is the firm’s responsibility to have the RFQ
correctly marked, addressed, and delivered to: City Secretary Office; 1149 Ellsworth Drive,
Pasadena, TX 77506 by 4:00 p.m. CST on Monday, July 27, 2026.
10. Evaluation and Scoring Rubric
Selection Process:
The selection of professional engineering services will be conducted in accordance with the Texas
Professional Services Procurement Act, Texas Government Code Chapter 2254. Firms will be
evaluated based on demonstrated competence, qualifications, and experience relevant to the
services requested in this RFQ. Fees will not be considered as part of the evaluation process.
Following selection of the most qualified firm, PEDC will enter negotiations to establish a fair and
reasonable fee for the requested services.
The PEDC will conduct a comprehensive, fair, and impartial evaluation of all submittals received in
response to this RFQ based on the evaluation criteria set forth below. The PEDC will appoint a
selection committee to perform the evaluation. Each submittal will be analyzed to determine overall
responsiveness and qualifications under this RFQ. The selection committee may select all, some or
none, of the respondents for interviews. The PEDC may also request additional information from
respondents at any time prior to final selection.
• Firms shortlisted for interviews or the firm selected for this project will be notified directly by
the PEDC.
• At the conclusion of the selection process, the selection committee will rank the firms based
on qualifications and responsiveness to the requirements of this RFQ. The PEDC will enter
negotiations with the highest-ranked firm to establish a fair and reasonable fee and finalize
contract terms.
• If the PEDC is unsuccessful in negotiating a contract with the highest ranked firm, the PEDC
may terminate negotiations and proceed to negotiate with the next highest ranked firm until a
contract is successfully executed or the selection process is terminated.
• Final approval of the selected respondent is subject to the approval of the PEDC Board of
Directors at their Board Meeting.
Page | 4
Evaluation Criteria
The selection committee, in their deliberations, will consider the following criteria:
1. Qualifications of Project Team
2. Relevant Experience with Similar Projects
3. Understanding of Project & Technical Approach
4. Utility Coordination and Electrical Design
Experience
5. References/Past Performance
(25 points)
(30 points)
(20 points)
(15 points)
(10 points)
11. Reservation of Rights
PEDC reserves the right to reject any or all submissions, waive informalities, request additional
information, negotiate scope and fees, and select the firm deemed most qualified to perform the
services described herein.
Issuance of this RFQ does not obligate PEDC to award a contract or reimburse any respondent for
costs incurred in the preparation or submission of a Statement of Qualifications. All such costs shall
be borne solely by the respondent.