APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Update 4: Additional Questions and Answers provided.
Additional Questions and Answers:
1. Any pictures of the affected areas?
FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed.
2. Is there any affected insulation material above the grid? It is often overlooked and usually has to be replaced once the ceiling tiles are relaced, the SOW makes no mention of this. If we find it damaged and in need of replacement, will this be a bilateral agreement added later on?
Maintenance techs inspected and stated that the insluation does not rest on the ceiling tiles. The insulation is suspended above the tiles by wire mesh.
3. SOW mentioned damaged framework above grid needs to be repaired. Are there any pictures of the damaged areas?
FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed.
4. At which point will a decision be made of repair or total replacement of the grid if it needs to be replaced in its entirety?
The replacement of all ceiling tiles and all metal framing is stated on the SOW as a requirement.
5. There are stages at which the remediated area will need to be put back into service, once clearance is achieved. 1.1 Replacement of HVAC duct work if it is found uncleanable (this will be skipped if ductwork is cleaned) 1.2 Bent framework needs to be corrected 1.3 insulation needs to be replaced 1.4 Tiles will need to be replaced and any fitting of tiles will be done at this time. 1.5 Final cleaning and turnover to client. The question will be, is the awarded vendor responsible for the purchasing of ceiling tiles and insulation, and subcontracting the HVAC contractor if the ductwork is uncleanable?
Yes.
6. Is there a Mold Remediation Protocol as completed by a licensed TDLR MAC? Can that be provided?
Unfortunately, we do have the experience nor have an SME on site to answer those questions.
7. This is a TDLR notifiable project. That must be completed and filed will it be a routine or emergency project?
Unfortunately, we do have the experience nor have an SME on site to answer those questions.
8. Will the 3rd party clearance be the original MAC or will the remediation contractor be required to coordinate that effort?
It is our understanding that Contractor needs to acquire clearance thru and independent and certified vendor.
9. The SOW calls for the cleaning of IT equipment; are those units running and will they remain running during the remediation?
Yes, one IT rack will be running.
10. What was the Identified underlying cause of the fungal growth? Has this been addressed or will that be on the contractor?
HVAC leak and not cooling caused excessive moisture buildup. AC leak to be repaired by separate contractor.
11. The SOW 2.0A states “Service area(s) – VSAB 1 FRF Approximate Amount of Impacted Material - Shoes and leather chair, and less than 25 sf of contiguous visible mold growth” was this determined by a TDLR MAC?
Yes, Brighton Solutions.
12. Was there a previous project for this requirement or is this a new requirement? We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?
No Previos Project. New Contract.
13. Is there a wage determination?
Wage determination for the Denton area is attached to this solicitation.
14. Can you please provide the specifications of the ceiling tiles?
Fifth Avenue 280; 2 ft x 4 ft x 5/8 inch; Commercial Equivalent, Fissured 562.
15. Could you kindly confirm which section or specifications detail the protocol for this project? Your guidance will be greatly appreciated to ensure my understanding aligns with the requirements.
The SOW lists this.
Update 3: POC email for site visit has been updated as incorrect email was provided previously and two attachments have been added which are the two reports received from Brighton solutions regarding the Initial Mold Assessment Report of what they discovered in the FRF room.
Update 2: Submission deadline extended to January 14, 2025 by 5:00 PM ET.
Update 1: Questions and Answers and Wage Determination attached.
Questions and Answers:
The awardee will provide all necessary labor and materials to perform the work required to eradicate all mold in the FRF room.
1) Please see the attached Statement of Work for requirements.
2) The evaluation criteria is shown in the Request for Proposal attached to this solicitation. The offeror must address the specifics of the evaluation factors to be considered for award.
3) Please email the Contracting Officer listed in the Request for Proposal with any questions you may have.
Site Visits will be offered on January 8th, 2025 from 9:30am-2:00pm CST. Please contact David Perez at david.perez3@fema.dhs.gov to schedule. Proposals are due January 14th, 2025 by 5:00 PM/ET.
| Dec 30, 2024 | [Combined Synopsis/Solicitation (Original)] Mold Remediation in Denton, Texas |
| Jan 2, 2025 | [Combined Synopsis/Solicitation (Updated)] Update 1-Mold Remediation in Denton, Texas |
| Jan 3, 2025 | [Combined Synopsis/Solicitation (Updated)] Update 3-Mold Remediation in Denton, Texas |
| Jan 7, 2025 | [Combined Synopsis/Solicitation (Updated)] Update 6-Mold Remediation in Denton, Texas |
| Jan 13, 2025 | [Combined Synopsis/Solicitation (Updated)] Update 8-Mold Remediation in Denton, Texas |

With GovernmentContracts, you can:
Bid Number: 2026-057 Bid Title: On-Call General Engineering Services Category: Engineering Services, Professional
City of San Marcos
Bid Due: 6/04/2026
Header Information Bid Number: B2600001040 Description: 26018 RFI Advanced Traffic Management System Bid
North Texas Tollway Authority
Bid Due: 6/12/2026
Bid Information Type Request for Qualifications Status Issued Number 2026-0396-B (Construction Manager-at-Risk for
City of Plano
Bid Due: 6/08/2026
Follow Lease of Office Space within ABILENE, TX. Request for Lease Proposals (RLP)
GENERAL SERVICES ADMINISTRATION
Bid Due: 6/08/2026