Update 4-Mold Remediation in Denton, Texas

Location: Texas
Posted: Jan 6, 2025
Due: Jan 14, 2025
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • F - Natural Resources and Conservation Services
Solicitation No: 0863
Publication URL: To access bid details, please log in.
Follow
Update 4-Mold Remediation in Denton, Texas
Active
Contract Opportunity
Notice ID
0863
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
FEDERAL EMERGENCY MANAGEMENT AGENCY
Office
NATIONAL CONTINUITY SECTION(CON50)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Jan 06, 2025 01:56 pm EST
  • Original Published Date: Dec 30, 2024 03:37 pm EST
  • Updated Date Offers Due: Jan 14, 2025 05:00 pm EST
  • Original Date Offers Due: Jan 10, 2025 05:00 pm EST
  • Inactive Policy: Manual
  • Updated Inactive Date: Jan 14, 2025
  • Original Inactive Date: Jan 10, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: F108 - ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
  • NAICS Code:
    • 562910 - Remediation Services
  • Place of Performance:
    Denton , TX
    USA
Description

Update 4: Additional Questions and Answers provided.



Additional Questions and Answers:



1. Any pictures of the affected areas?



FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed.



2. Is there any affected insulation material above the grid? It is often overlooked and usually has to be replaced once the ceiling tiles are relaced, the SOW makes no mention of this. If we find it damaged and in need of replacement, will this be a bilateral agreement added later on?



Maintenance techs inspected and stated that the insluation does not rest on the ceiling tiles. The insulation is suspended above the tiles by wire mesh.



3. SOW mentioned damaged framework above grid needs to be repaired. Are there any pictures of the damaged areas?



FRF is designated as a TEMPORARY SECURE WORK AREA (TSWA) & no pics are allowed.



4. At which point will a decision be made of repair or total replacement of the grid if it needs to be replaced in its entirety?



The replacement of all ceiling tiles and all metal framing is stated on the SOW as a requirement.



5. There are stages at which the remediated area will need to be put back into service, once clearance is achieved. 1.1 Replacement of HVAC duct work if it is found uncleanable (this will be skipped if ductwork is cleaned) 1.2 Bent framework needs to be corrected 1.3 insulation needs to be replaced 1.4 Tiles will need to be replaced and any fitting of tiles will be done at this time. 1.5 Final cleaning and turnover to client. The question will be, is the awarded vendor responsible for the purchasing of ceiling tiles and insulation, and subcontracting the HVAC contractor if the ductwork is uncleanable?



Yes.



6. Is there a Mold Remediation Protocol as completed by a licensed TDLR MAC? Can that be provided?



Unfortunately, we do have the experience nor have an SME on site to answer those questions.



7. This is a TDLR notifiable project. That must be completed and filed will it be a routine or emergency project?



Unfortunately, we do have the experience nor have an SME on site to answer those questions.



8. Will the 3rd party clearance be the original MAC or will the remediation contractor be required to coordinate that effort?



It is our understanding that Contractor needs to acquire clearance thru and independent and certified vendor.



9. The SOW calls for the cleaning of IT equipment; are those units running and will they remain running during the remediation?



Yes, one IT rack will be running.



10. What was the Identified underlying cause of the fungal growth? Has this been addressed or will that be on the contractor?



HVAC leak and not cooling caused excessive moisture buildup. AC leak to be repaired by separate contractor.



11. The SOW 2.0A states “Service area(s) – VSAB 1 FRF Approximate Amount of Impacted Material - Shoes and leather chair, and less than 25 sf of contiguous visible mold growth” was this determined by a TDLR MAC?



Yes, Brighton Solutions.



12. Was there a previous project for this requirement or is this a new requirement? We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?



No Previos Project. New Contract.



13. Is there a wage determination?



Wage determination for the Denton area is attached to this solicitation.



14. Can you please provide the specifications of the ceiling tiles?



Fifth Avenue 280; 2 ft x 4 ft x 5/8 inch; Commercial Equivalent, Fissured 562.



15. Could you kindly confirm which section or specifications detail the protocol for this project? Your guidance will be greatly appreciated to ensure my understanding aligns with the requirements.



The SOW lists this.



Update 3: POC email for site visit has been updated as incorrect email was provided previously and two attachments have been added which are the two reports received from Brighton solutions regarding the Initial Mold Assessment Report of what they discovered in the FRF room.



Update 2: Submission deadline extended to January 14, 2025 by 5:00 PM ET.



Update 1: Questions and Answers and Wage Determination attached.



Questions and Answers:




  1. What is the square footage of the FRF room requiring remediation? FRF room measures approx 50’ X 50’, so 2,500 sq ft.

  2. Are there any known water sources/leaks that need to be addressed as part of the remediation? No known sources

  3. What type of mold has been identified through testing, if any? I believe it was black mold, (this should be in the SOW)

  4. Are there any special security clearance requirements for personnel? Yes, every employee will have to have pass an NCIC (National Crime Information Center) check

  5. What are the working hours allowed for remediation work? 7AM to 4PM (M-F)

  6. Is there a required timeline for completion after award? The SOW provides the period of performance

  7. Are there any containment requirements for adjacent spaces? No, however from the Contracting Officer's Representative who is a non-SME, in reading the requirements from the testing company, two other adjacent areas at least need to be air-scrubbed. This is listed in the SOW.

  8. What is the current HVAC system configuration in the affected area? The FRF has its own 15 ton conventional AC unit. It is dedicated solely to the FRF room.

  9. Are there any sensitive equipment or materials that need special protection during remediation? Yes, there is some RF radio equipment racks and one IT equipment rack.

  10. Is there a designated staging area for equipment and materials? Yes.





The awardee will provide all necessary labor and materials to perform the work required to eradicate all mold in the FRF room.



1) Please see the attached Statement of Work for requirements.

2) The evaluation criteria is shown in the Request for Proposal attached to this solicitation. The offeror must address the specifics of the evaluation factors to be considered for award.

3) Please email the Contracting Officer listed in the Request for Proposal with any questions you may have.



Site Visits will be offered on January 8th, 2025 from 9:30am-2:00pm CST. Please contact David Perez at david.perez3@fema.dhs.gov to schedule. Proposals are due January 14th, 2025 by 5:00 PM/ET.


Attachments/Links
Contact Information
Contracting Office Address
  • P.O. BOX 129
  • BERRYVILLE , VA 22611
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Dec 30, 2024[Combined Synopsis/Solicitation (Original)] Mold Remediation in Denton, Texas
Jan 2, 2025[Combined Synopsis/Solicitation (Updated)] Update 1-Mold Remediation in Denton, Texas
Jan 3, 2025[Combined Synopsis/Solicitation (Updated)] Update 3-Mold Remediation in Denton, Texas
Jan 7, 2025[Combined Synopsis/Solicitation (Updated)] Update 6-Mold Remediation in Denton, Texas
Jan 13, 2025[Combined Synopsis/Solicitation (Updated)] Update 8-Mold Remediation in Denton, Texas
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Number: 2026-057 Bid Title: On-Call General Engineering Services Category: Engineering Services, Professional

City of San Marcos

Bid Due: 6/04/2026

Header Information Bid Number: B2600001040 Description: 26018 RFI Advanced Traffic Management System Bid

North Texas Tollway Authority

Bid Due: 6/12/2026

Bid Information Type Request for Qualifications Status Issued Number 2026-0396-B (Construction Manager-at-Risk for

City of Plano

Bid Due: 6/08/2026

Follow Lease of Office Space within ABILENE, TX. Request for Lease Proposals (RLP)

GENERAL SERVICES ADMINISTRATION

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.