| Location: | South Carolina |
|---|---|
| Posted: | Mar 21, 2025 |
| Due: | Apr 21, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The scope includes abandoning the existing wet well in place, installing a new influent manhole, an 8-foot diameter precast wet well, a new valve vault, and new pumps, piping, and appurtenances, all housed within these structures. The project will also involve the installation of a brand new electrical system with a generator. Additionally, the site will be enclosed with a new 6-foot security fence and covered with aggregate base course.

With GovernmentContracts, you can:
...Honea Path SC 29654 Project Delivery Method: Design-Bid-Build Construction Cost Range: $500K - ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...as specified herein. Installation will be done by others. 1. BASIS OF DESIGN ...
Clemson University
Bid Due: 9/29/2026
...24, 2026 - 2:00pm Project Location: Dunnemann Apts Project Delivery Method: Design-Bid-Build... Description: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/24/2026
...) Project Delivery Method: Design-Bid-Build Construction Cost Range: $800,000 to $900,000 Prime..., Installation ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/29/2026