SUBASE Kings Bay Car Wash Equipment Replacement

Location: Georgia
Posted: Jan 6, 2025
Due: Jan 23, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: NAVMWR-25-Q-0018
Publication URL: To access bid details, please log in.
Follow
SUBASE Kings Bay Car Wash Equipment Replacement
Active
Contract Opportunity
Notice ID
NAVMWR-25-Q-0018
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSUP
Sub Command
NAVSUP OTHER HCA
Sub Command 2
CNIC
Office
COMMANDER NAVY INSTALLATIONS CMD
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jan 06, 2025 12:08 pm CST
  • Original Published Date: Dec 26, 2024 03:48 pm CST
  • Updated Date Offers Due: Jan 23, 2025 03:00 pm CST
  • Original Date Offers Due: Jan 23, 2025 03:00 pm CST
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Feb 07, 2025
  • Original Inactive Date: Feb 07, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: J025 - MAINT/REPAIR/REBUILD OF EQUIPMENT- VEHICULAR EQUIPMENT COMPONENTS
  • NAICS Code:
    • 811192 - Car Washes
  • Place of Performance:
    Kings Bay , GA 31547
    USA
Description

The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay.



Work shall include but is not limited to the following:



1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC).



2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.



3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC.



4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays.



5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions:




  • Tire Cleaner

  • Presoak

  • High Pressure Soap

  • Wax

  • Rinse

  • Spot-Free Rinse

  • Bug Off

  • Foam Brush

  • Foam Conditioner



6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational.



7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required.





8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories:




  • Foam Brush Buckets

  • High Pressure Wand Holders

  • Bay Hooks

  • Matt Clamps

  • Menu Board and Operational Signage



9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash

POS Control Meters. The new Bay Control Meters shall have a coin and credit card option.

The individual credit card reader must be compatible with NAYAX payment and

management system. The Contractor shall insure that the Point of Sale (POS) system is

compatible with the Installation Morale Welfare and Recreation (MWR) department’s

existing NAYAX system. The Government will provide 3rd party encryption and process

separately from this contract.





10. Renovation: The Contractor shall install a new weatherproof electrical vending machine

that will be compatible with the same payment option as line item ten (10) above. The

vending machine options shall include items such as:




  • Towels

  • Wipes

  • Protectants

  • Shines

  • Cleaners

  • Deodorizers

  • Air Fresheners



11. The Contractor shall furnish and install a new bill changer matching existing unit

configurations at the same location as existing.





12. Renovation: The Contractor shall install all new equipment and related accessories, as

per manufacturer’s installation guidelines.

If the Contractor is quoting an “equal” to the listed product herein, the Contractor shall

submit complete specifications on the “equal” product with the response to this RFQ. The

specifications will be reviewed by the POC and Contracting Officer (KO) for possible use

on this project.





13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for

approval fifteen (15) days prior to fabrication. All new merchandising and operational

signage must comply with the MWR Brand Standards.





14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and

floor surfaces, from any and all damage during the work, by utilizing walk pads,

construction screens and other industry best practices protection methods.





15. Restoration: The Contractor shall repair and/or replace all facility elements impacted

and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint

and/or otherwise restore all building materials, including but not limited to, wall and floor

surfaces damaged by work; to the satisfaction of the POC.





16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and

detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties.





17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis.



Site Inspection



The Contractor shall examine the site and determine for themselves the existing conditions and

general character of the site. Claims for additional costs due to conditions that could have been

verified by site investigation will not be authorized. Contractor shall contact the POC to schedule

the Site Inspection.


Attachments/Links
Contact Information
Contracting Office Address
  • DET MILLINGTON 5720 INTEGRITY DRIVE
  • MILLINGTON , TN 38055-6500
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Dec 26, 2024[Solicitation (Original)] SUBASE Kings Bay Car Wash Equipment Replacement
Jan 13, 2025[Solicitation (Updated)] SUBASE Kings Bay Car Wash Equipment Replacement
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow STACK WASHER AND DRYER COMBO Active Contract Opportunity Notice ID W911S226U3356 Related

DEPT OF DEFENSE

Bid Due: 6/09/2026

Follow Enterprise Contracted Logistics Sustainment Support (ECLSS) Active Contract Opportunity Notice ID FA8527-26-R-ECLSS

DEPT OF DEFENSE

Bid Due: 6/22/2026

Follow Building Ranger Resiliency-Chaplain Program Active Contract Opportunity Notice ID PANMCC-26-P-0000043460 Related Notice

DEPT OF DEFENSE

Bid Due: 6/16/2026

Follow Flood Mitigation and Site Improvements Kingston Commons Active Contract Opportunity Notice ID

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 7/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.