SCOTTS VALLEY WATER DISTRICT
REDEVELOPMENT AND TESTING OF ORCHARD RUN WELL
|
Date Issued: |
October 19 th , 2026 |
|
Date Published |
October 19 th , 2026 |
Notice is hereby given that sealed bids will be received by the Scotts Valley Water District (“District”) in the District Office at the time, date and place below for furnishing all labor, materials, equipment, and services for the construction of improvements designated as the Scotts Valley Water District ORCHARD RUN WELL REHABILITATION at which time and place bids will be publicly opened and read.
Location: Scotts Valley Water District
2 Civic Center Drive, Scotts Valley CA 95066
Time: Before 2:00 PM, Tuesday, November 16 th , 2026
After bids are opened, they will be referred to staff for subsequent action. The District reserves the right to reject any or all bids and to waive any errors or discrepancies. Any bids received after the scheduled closing time for receipt of bids will be returned unopened.
PROJECT DESCRIPTION
The Project involves redevelopment testing of Orchard Run Well including jetting, cleaning out of debris, installation of a test pump and finishing with installation of new District furnished HSLA column piping, along with a new pump and motor.
REQUIREMENTS
Contractor's License
To submit a bid the Contractor must possess licenses valid in the State of California for Class C-57 license. In accordance with the provisions of California Business and Professions Code Section 7028.15, a bid submitted to the District by a Contractor who is not licensed in accordance with applicable laws shall be considered non-responsive.
Time Limit for Completion
The successful bidder will have 40 calendar days to substantially complete the Project from the Notice to Proceed. Liquidated Damages in the amount of $1,000 per day will be assessed for each calendar day the work remains incomplete beyond the time fixed above for completion pursuant to Section 2-F, Special Conditions, and Liquidated Damages.
Mandatory Pre-Bid Conference
A mandatory pre-bid conference will be held at 10 am on Thursday, November 5
th
, 2026 at 2 Civic Center Dr, Scotts Valley, CA 95066. Attendance at the pre-bid conference is mandatory for all prospective bidders.
Prevailing Wage and Labor Code Compliance
The District hereby advises all bidders that the successful bidder shall: (a) Employ the appropriate number of apprentices on the job site as set forth in California Labor Code 1777.5; (b) Provide Workers’ Compensation coverage, as set forth in California Labor Code Sections 1860 and 1861; (c) Keep and maintain the records of work performed on the public works Project, as set forth in California Labor Code Section 1812; (d) Keep and maintain the records required under California Labor Code Section 1776 which shall be subject to inspection pursuant to California Labor Code Section 1776 and California Code of Regulations, Division 1, Chapter 8, Subchapter 3, Article 6, Section 16400(e); (e) Be subject to other requirements imposed by law; and (f) pay prevailing wages as required by Labor Code Sections 1770, 1773, 1773.1, 1773.6 and 1773.7 as amended.
Notice of Public Works Registration
Notice is hereby given that no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5, with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) if required by law.
OBTAINING DOCUMENTS
Electronic copies of all Contract Documents are available per request. All prospective bidders shall register with the District by calling 831-438-2363 or emailing engineering@svwd.org. The Contract Documents are also available on District website www.svwd.org .
CONTACT INFORMATION
Pre-Bid Inquiries. Bidders may submit pre-bid inquiries or clarification requests. Bidders are solely and exclusively responsible for submitting such inquiries or clarification requests not less than Fourteen (14) days prior to the scheduled closing date for the receipt of Bid Proposals. The District will not respond to any bidder inquiries or clarification requests unless such inquiries or clarification requests are timely submitted.
Questions concerning this Project should be submitted to the Owner’s Representative:
|
Scotts Valley Water District |
||
|
2 Civic Center Drive |
||
|
Scotts Valley, CA 95066 |
||
|
Attn: |
Nate Gillespie, Operations Manager |
|
|
(831) 600-1903 |
ngillespie@svwd.org |
|
END OF DOCUMENT
Contract Documents and Construction Specifications
ORCHARD RUN WELL REHABILITATION
Scotts Valley Water District
Santa Cruz County, California
November 2026
Project Engineer: MONTGOMERY AND ASSOCIATES
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
SECTION 1 BID DOCUMENTS
TABLE OF CONTENTS
1-A NOTICE INVITING BIDS .............................................................................................................. 1
1-B INSTRUCTION TO BIDDERS ....................................................................................................... 4
1-C BID FORM .................................................................................................................................. 9
1-D BID BOND ............................................................................................................................... 13
1-E SUBCONTRACTORS LIST .......................................................................................................... 15
1-F NON-COLLUSION AFFIDAVIT ................................................................................................... 16
1-G STATEMENT OF QUALIFICATIONS .......................................................................................... 17
1-H BIDDER CERTIFICATIONS ........................................................................................................ 20
1-I IRAN CONTRACTING ACT CERTIFICATION ............................................................................... 23
0
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
1-A NOTICE INVITING BIDS
SCOTTS VALLEY WATER DISTRICT
REDEVELOPMENT AND TESTING OF ORCHARD RUN WELL
Date Issued: October 19th, 2026
Date Published October 19th, 2026
Notice is hereby given that sealed bids will be received by the Scotts Valley Water District
("District") in the District Office at the time, date and place below for furnishing all labor,
materials, equipment, and services for the construction of improvements designated as the
Scotts Valley Water District ORCHARD RUN WELL REHABILITATION at which time and place bids
will be publicly opened and read.
Location: Scotts Valley Water District
2 Civic Center Drive, Scotts Valley CA 95066
Time: Before 2:00 PM, Tuesday, November 16th, 2026
After bids are opened, they will be referred to staff for subsequent action. The District reserves
the right to reject any or all bids and to waive any errors or discrepancies. Any bids received
after the scheduled closing time for receipt of bids will be returned unopened.
PROJECT DESCRIPTION
The Project involves redevelopment testing of Orchard Run Well including jetting, cleaning out
of debris, installation of a test pump and finishing with installation of new District furnished
HSLA column piping, along with a new pump and motor.
REQUIREMENTS
Contractor's License
To submit a bid the Contractor must possess licenses valid in the State of California for Class C-
57 license. In accordance with the provisions of California Business and Professions Code
Section 7028.15, a bid submitted to the District by a Contractor who is not licensed in
accordance with applicable laws shall be considered non-responsive.
Time Limit for Completion
The successful bidder will have 40 calendar days to substantially complete the Project from the
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 1
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
Notice to Proceed. Liquidated Damages in the amount of $1,000 per day will be assessed for
each calendar day the work remains incomplete beyond the time fixed above for completion
pursuant to Section 2-F, Special Conditions, and Liquidated Damages.
Mandatory Pre-Bid Conference
A mandatory pre-bid conference will be held at 10 am on Thursday, November 5th, 2026 at 2
Civic Center Dr, Scotts Valley, CA 95066. Attendance at the pre-bid conference is mandatory for
all prospective bidders.
Prevailing Wage and Labor Code Compliance
The District hereby advises all bidders that the successful bidder shall: (a) Employ the
appropriate number of apprentices on the job site as set forth in California Labor Code 1777.5;
(b) Provide Workers' Compensation coverage, as set forth in California Labor Code Sections
1860 and 1861; (c) Keep and maintain the records of work performed on the public works
Project, as set forth in California Labor Code Section 1812; (d) Keep and maintain the records
required under California Labor Code Section 1776 which shall be subject to inspection
pursuant to California Labor Code Section 1776 and California Code of Regulations, Division 1,
Chapter 8, Subchapter 3, Article 6, Section 16400(e); (e) Be subject to other requirements
imposed by law; and (f) pay prevailing wages as required by Labor Code Sections 1770, 1773,
1773.1, 1773.6 and 1773.7 as amended.
Notice of Public Works Registration
Notice is hereby given that no contractor or subcontractor may be listed on a bid proposal for a
public works project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5, with limited exceptions from this requirement for bid purposes only
under Labor Code section 1771.1(a). No contractor or subcontractor may be awarded a
contract for public work on a public works project unless registered with the Department of
Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations. All contractors and subcontractors must furnish electronic certified payroll
records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement) if
required by law.
OBTAINING DOCUMENTS
Electronic copies of all Contract Documents are available per request. All prospective bidders
shall register with the District by calling 831-438-2363 or emailing engineering@svwd.org. The
Contract Documents are also available on District website www.svwd.org.
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 2
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
CONTACT INFORMATION
Pre-Bid Inquiries. Bidders may submit pre-bid inquiries or clarification requests. Bidders are
solely and exclusively responsible for submitting such inquiries or clarification requests not less
than Fourteen (14) days prior to the scheduled closing date for the receipt of Bid Proposals.
The District will not respond to any bidder inquiries or clarification requests unless such
inquiries or clarification requests are timely submitted.
QUESTIONS CONCERNING THIS PROJECT SHOULD BE SUBMITTED TO THE OWNER'S
REPRESENTATIVE:
Scotts Valley Water District
2 Civic Center Drive
Scotts Valley, CA 95066
Attn: Nate Gillespie, Operations Manager
(831)600-1903 ngillespie@svwd.org
www.svwd.org
END OF DOCUMENT
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 3
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
1-B INSTRUCTION TO BIDDERS
SCOTTS VALLEY WATER DISTRICT
REDEVELOPMENT AND TESTING OF ORCHARD RUN WELL
GENERAL
The work to be performed is described in the Bid Documents and Plans, Drawings and
Specifications titled REDEVELOPMENT AND TESTING OF ORCHARD RUN WELL. All bidders shall
carefully examine the Contract Documents and satisfy themselves as to their sufficiency. Prior
to submission of a bid, the bidder shall notify the District of any conflicts, errors of
discrepancies in the Contract Documents prior to the submission of its bid. Intended bidders
shall have visited the site of the work and familiarized themselves with the conditions there
existing as well as all other conditions relating the construction and labor under which the work
will be performed and affecting cost, progress or performance of the work. The submission of a
bid shall be considered an acknowledgment on the part of the Bidder of its familiarity with
conditions at the site of work.
PRE-BID CONFERENCE
A mandatory pre-bid conference will be held at the time and place stipulated in the Notice
Inviting Bids. The conference will be conducted by the District. Subcontractors and other
interested parties are invited and encouraged to attend.
POSTPONEMENT OF BID OPENING
The District reserves the right to postpone the date and time for receiving and/or opening of
bids at any time prior to the date and time established in the Notice Inviting Bids.
Postponement notices may be faxed or emailed and will subsequently be mailed to registered
plan holders of record in the form of addenda.
INTERPRETATIONS
No oral representations or interpretations will be made to any bidder as to the meaning of the
Contract Documents. Requests for an interpretation shall be made in writing and delivered to
the District's Representative at least fourteen (14) days before the bids are opened.
ADDENDA
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 4
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
Addenda may be issued to all known plan holders during the Bid period. Any and all addenda
issued shall become a part of the Contract Documents shall be acknowledged on the Bid Form,
and shall be fully considered by all bidders during their preparation of bids.
SUBSTITUTIONS
All substitution requests shall be submitted prior to the bid by November 9th, 2026
("Substitution Request Deadline"). Substitution Requests will be approved or rejected by the
District before award, except in the following circumstances: The specified product is no longer
available or the proposed substitute product provides a substantial cost or time savings. Timely
submitted Substitution Requests will be reviewed by the District and Architect to determine the
equivalency of the proposed substitution with the specified materials/equipment. The District's
decision to grant, deny or condition consent to substitute specified materials/equipment is final
and not subject to further review or appeal. If the District consents to or conditionally consents
to the substitution of specified materials/equipment, the District will issue an Addendum
identifying the specified materials/equipment and the alternative materials/equipment consent
to or conditionally consented to by the District. A Pre-bid Request for Substitution Request
Form is contained in the forms included in Section 7 of the Contract Documents.
REQUIRED BID FORMS
Bids for the work shall be made on the forms contained in the section and shall include the
following completed documents:
1-C Bid Form
1-D Bid Bond (or use form supplied by bonding company)
1-E Subcontractors List
1-F Statement of Qualifications
1-G Non-Collusion Affidavit
1-H Bidder Certifications
1-I Iran Contracting Act Certification
BID SUBMISSION
Before the deadline for the submission of bids, a complete set of bid forms listed above, shall
be placed in an envelope, sealed, and addressed to the Owner's Representative:
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 5
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
Nate Gillespie, Operations Manager
Scotts Valley Water District
2 Civic Center Drive, Scotts Valley CA 95066
The envelope shall reflect the name of the Project. Bids shall give the prices proposed in figures
and words, shall give all other information requested herein, and shall be signed by the bidder
or an authorized representative. By submission of a bid, the bidder certifies that the bidder has
obtained a complete set of the Contract Documents and is aware of the entire contents
thereof, including all addenda.
BID OPENING
After the expiration of the time for submission of bids, all bids will be publicly opened, read,
declared, and referred to staff for action.
MODIFICATION OF BIDS
Modification of a bid already received will be considered only if the modification is received
prior to the time established for receiving bids.
WITHDRAWAL OF BID
Any bid may be withdrawn prior to the time established for receiving bids, provided that a
written request for withdrawal of bids, executed by the bidder or his duly authorized
representative, is filed with the District. The bid will be considered null and void and will be
returned to the Contractor unopened. The withdrawal of a bid in such a manner will not
prejudice the right of a bidder to file a new bid prior to the time established for receiving bids.
BID FORM
The Bid shall be submitted on Form 1-C-Bid Form.
BID PRICES
Bid prices shall include everything necessary for the completion of construction and fulfillment
of the work described in the Contract Documents. Bid prices shall include all federal, state and
local taxes including sales and use taxes. Costs for developing, submitting, and presenting bids
are the sole responsibility of the bidder.
BID BOND
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 6
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
Bids shall be accompanied by a cashier's check, a certified check or a bidder's bond executed by
an admitted surety in an amount not less than ten (10) percent of the aggregate of the bid
amount, payable to the order of the District. The check or bond shall be a guarantee that the
successful bidder, if awarded the work, will within ten (10) days after notice of its award to the
successful bidder: (1) enter into a contract, (2) furnish a bond of faithful performance and a
bond, (3) furnish insurance policies and endorsements and (4) prior to issuance of the final
project payment the successful bidder must submit a warranty or maintenance bond. In case of
refusal or failure to enter into the Contract, the bid guaranty check or bond, as the case may be,
shall be forfeited to the District, the proceeds therefrom being hereby agreed upon as
liquidated damages to the District on account of the delay in the execution of the Contract and
required bonds and the performance of the work thereunder, and the necessity of accepting a
higher or less desirable bid resulting from such failure or refusal to execute the Contract and
the bonds as required. Upon the execution of the Contract and the approval on behalf of the
District of the accompanying bonds and insurance policies and endorsements, all certified
checks that accompany bids and that have not heretofore been returned will be returned, each
to its maker. Form 1-D Bid Bond Form
SUBCONTRACTORS
In accordance with California Public Contracting Code Section 4100, et. seq., each bid shall have
listed the name, type or trade, portion of work to be performed, and location of the place of
business of each subcontractor who will perform work or labor or render service to the bidder
in or about the construction of the work or improvement, or of any subcontractor licensed by
the State of California who, under subcontract to the bidder, will specifically fabricate and
install a portion of the work or improvement according to detailed drawings contained in the
Bid Documents, in an amount in excess of one-half of one percent of the bidder's total bid or
$10,000, whichever is greater. If the Contractor fails to designate in its proposal a subcontractor
for any portion of the work as required above, the bidder shall be deemed to have agreed to
perform such portion of the work itself and shall not be permitted to subcontract that portion
of the work without the written permission of the District in accordance with applicable law.
Form 1-E-Subcontractors List
BIDDER CERTIFICATIONS
The Contractor shall complete and submit with its bid the Statement of Qualifications Form 1-F
- Statement of Qualifications
NON-COLLUSION AFFIDAVIT
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 7
SCOTTS VALLEY WATER DISTRICT SECTION 1 BID DOCUMENTS
In accordance with Public Contract Code Section 7106, the Contractor shall complete and file
with its bid the Non-Collusion Affidavit. Form 1-G Non-Collusion Affidavit
BIDDER CERTIFICATIONS
The Contractor shall complete and submit with its bid the Bidder Certifications Form 1-H --
Bidder Certifications
Iran Contracting Certification
The Contractor shall complete and submit with its bid the Iran Contracting Certification Form 1-
I - Iran Contracting Act Certification
BID IRREGULARITIES
Bids which contain omissions or material irregularities of any kind may be rejected. No oral,
telegraphic, facsimile or telephonic bids or modifications will be considered. The District may,
however, waive any irregularities in the bid process.
AWARD
If an award is made, it will be based on the lowest responsive, responsible bid.
INSURANCE, PAYMENT BOND, AND PERFORMANCE BOND
The successful bidder shall, within ten (10) days of the notice of award, provide the insurance,
and the payment and performance bonds as required in Section 4-of the Contract Award
Documents.
LOCAL BUSINESS LICENSE
All Contractors shall have a local business license before performing work on the Project if
required by the City of Scotts Valley.
END OF DOCUMENT
REDEVELOPMENT OF ORCHARD RUN WELL, NOVEMBER 2026 SECTION 1 PAGE 8

With GovernmentContracts, you can:
Follow UPDATE Request for Bids for Food Trucks at Rodeo Beach within Golden
INTERIOR, DEPARTMENT OF THE
Bid Due: 12/31/2026
GFO-26-302 - Food Production Investment Program 2026 Solicitation Type Grant Funding Opportunity Solicitation
California Energy Commission
Bid Due: 12/17/2026
Opportunity ID 224081 Organization City of Los Angeles Department Transportation Stage Open Contact
City of Los Angeles
Bid Due: 12/10/2026
Project ID: Title: 2026 Sewer Rehabilitation Project Addenda: 0 Release Date: 9/17/2026 Due
City of American Canyon
Bid Due: 1/12/2027