NOTICE is hereby given sealed bids will be received by the City of Woodstock for the project entitled “Gould Street Water Main Replacement” until
10:00 am on June 26, 2025,
at the City Hall, 121 W. Calhoun Street, Woodstock, IL 60098. The Bids will be publicly opened and read aloud immediately afterwards in the Council Chambers.
Bids shall be received in a sealed envelope addressed to:
City of Woodstock
121 W Calhoun St.
Woodstock, IL 60098
The sealed envelope shall be marked in the lower left-hand corner EXACTLY as follows:
BID: City Clerk
City of Woodstock
Gould Street Water Main Replacement
Provide all labor, services, and materials necessary for the construction of:
Approximately 1180 lineal feet of 8″ water main, 4 lineal ft of 12” water main, 83 lineal feet of 6″ water main, and 23 lineal feet of 4″ water main installed by open cut construction methods, including: trench excavation; water main pipe and fitting materials and installation; connection to existing water mains; water service connections; abandonment of existing water mains; pipe bedding; trench backfill; valves and valve vaults; fire hydrant assemblies including fire hydrant and auxiliary gate valve; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main replacement installation as shown, specified, or required.
Approximately 261 lineal feet of 8″ sanitary sewer, and 23 lineal feet of 10″ sanitary sewer installed by open cut construction methods, including: trench excavation; sanitary sewer pipe materials and installation; connection to existing sanitary sewers; pipe bedding; trench backfill; and all other work necessary for a complete and functional sanitary sewer installations as shown, specified, or required.
Approximately 15 lineal feet of 15″ storm sewer and 241 lineal feet of 12″ storm sewer installed by open cut construction methods, including: trench excavation; storm sewer pipe materials and installation; connection to existing storm sewers; storm sewer manholes, catch basins, and inlets; pipe bedding; trench backfill; and all other work necessary for a complete and functional storm sewer installations as shown, specified, or required.
Full depth pavement removal including HMA pavement removal and aggregate base course removal; installation of aggregate base course, HMA binder course, and HMA surface course; aggregate base repair; driveway removal and replacement; sidewalk removal and replacement; curb and gutter removal and replacement; erosion control; parkway restoration; traffic control; and all other work necessary for a complete and functional installation as shown, specified, or required.
https://www.trotter-inc.com/city-of-woodstock-gould-street-water-main-replacement