| Location: | Massachusetts |
|---|---|
| Posted: | Apr 16, 2025 |
| Due: | May 14, 2025 |
| Agency: | Town of Barnstable |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-070 - Filed Sub Bid HVAC |
| Publication URL: | To access bid details, please log in. |
Project Description: The project includes the demolition and total replacement of the mechanical / HVAC systems and select services for the existing Airport Traffic Control Tower (ATCT). This stand-alone structure comprises approximately 4,800 square feet over six (6) stories. Building functional programs supported include common horizontal and vertical circulation, personnel break and office space, restrooms, data/communications, electrical and elevator control rooms to support the ATCT “Cab” at the top of the structure.

With GovernmentContracts, you can:
...and Engineering firms with appropriate sub-consultants for various disciplines AND specialized engineering firms ...
Town of Barnstable
Bid Due: 6/24/2026
...and Engineering firms with appropriate sub-consultants for various disciplines AND specialized engineering firms ...
Town of Barnstable Invitation
Bid Due: 6/24/2026
...and Engineering firms with appropriate sub-consultants for various disciplines AND specialized engineering firms ...
Town of Barnstable
Bid Due: 6/24/2026
...replacements, and installation of an accessible drinking fountain. Category of work: HVAC (Prime...) ...
Commonwealth of Massachusetts
Bid Due: 6/22/2026