| Location: | Maryland |
|---|---|
| Posted: | Feb 26, 2025 |
| Due: | Feb 28, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z085Q250011354 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS WILL BE AWARDED UNDER LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.
STATEMENT OF WORK (SOW)
FOR
USCGC SLEDGE (WLIC-75) UNDERWATER HULL REPAIR
CGC SLEDGE has water intrusion through the hull below the forward potable water tank and requires repair for the tasks outlined in this SOW.
1.0 GENERAL
1.1 BACKGROUND
During routine rounds, approximately one inch of water was observed in the bilge beneath the forward potable water tank. After pumping out the accumulated water, it was noted that water was seeping back through the hull at an estimated rate of one quart per hour. The affected area exhibits significant corrosion and requires immediate repair or replacement.
The scope of this contract is defined by the efforts and tools required to support
CGC SLEDGE. The Contractor shall provide all labor, materials, and tools necessary to make repairs.
The objective is to inspect and effect repairs or to replace section/sections of the hull plating that has significant corrosion as to improve and return CGC SLEDGE to recommended working, safe condition.
1.4.2 Coast Guard Publications
(SFLC Std Spec 0000), 2022, General Requirements.
(SFLC Std Spec 0740), 2022, Welding and Allied Processes.
(SFLC Std Spec 6310), 2022, Preserve Ship Structures.
2.0 SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for CGC SLEDGE in Baltimore, MD.
2.1 UNDERWATER HULL PLATING
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
2.2 TEST THOROUGHLY AND DOCUMENT
The Contractor shall ensure the underwater hull plating is fully functional by performing a system operational test to be witnessed by CGC SLEDGE Engineering Petty Officer (EPO) or the EPO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.1 PERIOD of Performance
The period of performance for this contract shall not exceed 14 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at the location awarded, CGC SLEDGE,
2401 Hawkins Point Rd. Baltimore, MD 21226 unless an alternate location is approved by the U.S. Coast Guard. Access to this location/installation will be coordinated with the CGC SLEDGE EPO.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the CGC SLEDGE EPO with scheduling being subject to CGC SLEDGE operations.
4.4 DAILY PROGESS MEETING
The Contractor shall hold a daily progress meeting with the CGC SLEDGE EPO and/or Commanding Officer. This meeting shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions CGC SLEDGE personnel need to be made aware of prior to continuing work.
4.5 GENERAL REPORT REQUIREMENTS
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
Not Applicable
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for any Government Furnished Resources specified in Section 5.0.
The CGC SLEDGE EPO will inspect deliverables prior to acceptance and provide the Contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the CGC SLEDGE EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW Section 2.2.1 of this SOW.

With GovernmentContracts, you can: