| Location: | Colorado |
|---|---|
| Posted: | Jul 10, 2026 |
| Due: | Aug 13, 2026 |
| Agency: | COMMERCE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1333ND26RNB190033 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The National Institute of Standards and Technology (NIST) Boulder Campus seeks a qualified contractor to replace aging solar-powered exterior pole luminaires with new hard-wired LED pole luminaires throughout selected areas of the campus. Work includes demolition and removal of existing solar lighting systems, design and installation of new pole bases and luminaires, photometric analysis, structural pole base design stamped by a licensed Colorado Professional Engineer, and installation of new electrical circuits originating from nearby building panelboards. Construction activities include trenching, backfilling, restoration of landscaped and hardscaped areas, equipment labeling, and coordination of electrical shutdowns. All work must comply with NEC, NIST site standards, and applicable safety and security requirements.
Important Dates:
List of Individuals Attending Site Visit Due: Friday, July 17, 2026 to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov
Site Visit: Tuesday, July 21, 2026 @ 1:00pm at Building 25
Questions Due: July 30, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov
Proposals Due: August 13, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov
| Jul 8, 2026 | [Combined Synopsis/Solicitation (Original)] NIST Boulder Solar Lighting Upper Site Replacement |
| Jul 9, 2026 | [Combined Synopsis/Solicitation (Updated)] NIST Boulder Solar Lighting Upper Site Replacement |
| Aug 4, 2026 | [Combined Synopsis/Solicitation (Updated)] NIST Boulder Solar Lighting Upper Site Replacement |
| Aug 6, 2026 | [Combined Synopsis/Solicitation (Updated)] NIST Boulder Solar Lighting Upper Site Replacement |
| Aug 11, 2026 | [Combined Synopsis/Solicitation (Updated)] NIST Boulder Solar Lighting Upper Site Replacement |

With GovernmentContracts, you can:
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/16/2026
Bid Number: RFP-SN-2026-29 Bid Title: Sunlight Booster Pumping Station -- Site Selection and
Steamboat Springs
Bid Due: 9/23/2026
PARKER ROAD AND HILLTOP ROAD INTERSECTION IMPROVEMENTS (CIP 23-027) Notice to Bidders
Town of Parker
Bid Due: 9/16/2026
Solicitation number Status Due Description Attachments 270-26 Active 9/23/2026 5:00 PM Park Village
City of Thornton
Bid Due: 9/23/2026