| Location: | North Carolina |
|---|---|
| Posted: | Mar 11, 2025 |
| Due: | May 2, 2025 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20250305_878-Walker-Deck-Water-Intrusion_DesignerAd.pdf | |||||
| Project Name | Parking Deck Repairs - Campus-wide -Walker Parking Deck Water Intrusion | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Wendi Stogner | |||||
| Phone Number | (336) 608-9418 | |||||
| Contact Email | wcstogner@uncg.edu | |||||
| Closing Date | 05/02/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
UNC Greensboro is seeking letters of interest from qualified professionals for the project titled Walker Parking Deck Water Intrusion Repairs. The purpose of this project is to investigate and address ongoing water intrusion issues at two stair towers of the parking deck and a roof replacement at the attached single story office wing. The scope of work includes full designer services. At the main deck stair, an HVAC system is to be designed and installed to address persistent humidity issues affecting the lobby and stairwell across all levels. Evaluation and updates to the building's envelope, targeting the replacement of approximately 500 square feet of curtainwall and glazing, is required. Additional improvements will include mitigation of ongoing issues, such as: fogged windows, repair or replacement of rusted materials, and elimination of any safety hazards. The focus at a second stair will be to identify and remedy leaks on the uppermost level. The project will include investigation and necessary repairs or replacements to the building's envelope and drainage systems to prevent water intrusion. In addition to the water intrusion issues in the parking deck, leaks have also been identified in the office area. As part of this project, the office roof will undergo a comprehensive inspection to determine the source of leaks, and the scope to correct will be identified based on the outcome of the field investigation and designer recommendations. These professional design services will ensure long-term structural integrity and improved facility conditions to the Walker Parking Deck. All letters of interest are due to fdc@uncg.edu by 12pm on May 2, 2025
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Submissions accepted via email to fdc@uncg.edu Wendi Stogner UNC Greensboro Facilities Design & Construction
|

With GovernmentContracts, you can:
...Description: NCDOT 01 Engineering Office Roof Replacement Opening Date: 6/12/2026 3:00 PM Posted ...
State Government of North Carolina
Bid Due: 6/12/2026
...-ADVERTISEMENT) Architecture/Engineering RE-ADVERTISEMENT The NC Department of Public Safety invites.... The scope of ...
State Government of North Carolina
Bid Due: 6/12/2026
...of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide Construction..., ...
City of Charlotte
Bid Due: 6/08/2026
...of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide Construction..., ...
City of Charlotte
Bid Due: 6/08/2026