CITY OF UNION CITY
DEPARTMENT OF PUBLIC WORKS
CITY PROJECT NO. 26-20
NOTICE TO CONTRACTORS
Sealed proposals for the work shown on the plans entitled: Mark Green Sports
Center AHU Replacement, City Project No. 26-20, will be received at the office of the
City Clerk of the City of Union City, City Government Building, 34009 Alvarado-Niles
Road, Union City, California, until Tuesday, June 16th, 2026, 2:00PM PST, at which time
they will be publicly opened and read in the Council Chambers of said building. Please
be advised that the project is expected to be awarded at the City Council meeting on June
23, 2026.
The Contractor shall possess a Class C-20 and C-43 California contractor’s license
at the time this contract is awarded.
Bids are required for the entire work described herein. This contract is subject to
the State contract nondiscrimination and compliance requirements pursuant to
Government Code Section 12990.
Bid Package & Bid Package Location. All of the project work is to be done in
accordance with the bid package on file with the Public Works Department - City of Union
City, 34009 Alvarado-Niles Road, Union City, California 94587. Eligibility to bid on this
project requires bid package to be electronically obtained from the City. Bid package may
be obtained at no charge via email request to the City at publicworks@unioncity.org.
Non-biddable plans and specifications shall be available to view at various Builders’
Exchanges throughout the Bay Area and on the City of Union City website at
www.unioncity.org.
Pre-Bid Access to the Project Site. A mandatory pre-bid job walk is scheduled
on Tuesday, June 2nd, at 10AM. If you are interested in submitting a bid and would like
to participate in the walk, please e-mail joseph.harrington@cumming-group.com so we
can add you to the guest list. Joseph Harrington can be reached directly at (650) 241-
2390. The Public Works Department may be reached at publicworks@unioncity.org.
General Work Description: The project primarily consists of replacement of
existing air handler units AC 1 and AC 2 at Mark Green Sports Center located at 31224
Union City Blvd in Union City, California. The Engineer’s Estimate for the project base
is Two Hundred and Three Thousand Dollars ($203,000). The allotted time to
complete the project will be 65 working days (5-calendar day).
All questions should be emailed or telephoned to Joseph Harrington, email:
joseph.harrington@cumming-group.com. The successful bidder shall furnish a Payment
Bond, a Performance Bond, and a Maintenance Bond.
Minimum wage rates for this project as predetermined by the Secretary of Labor
are set forth in the special provisions. If there is a difference between the minimum wage
rates predetermined by the Secretary of Labor and prevailing wage rates determined by
the Department of Industrial Relations for similar classifications of labor, the contractor
and his subcontractors shall pay not less than the higher wage rates.