J062--Amendment to Provide Q&A Replace street light pole concrete bases.

Location: Minnesota
Posted: May 28, 2026
Due: Jun 2, 2026
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 36C26326Q0712
Publication URL: To access bid details, please log in.
Follow
J062--Amendment to Provide Q&A Replace street light pole concrete bases.
Active
Contract Opportunity
Notice ID
36C26326Q0712
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT OFFICE 23 (36C263)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: May 28, 2026 03:32 pm CDT
  • Original Published Date: May 18, 2026 02:48 pm CDT
  • Updated Date Offers Due: Jun 02, 2026 05:00 pm CDT
  • Original Date Offers Due: Jun 01, 2026 05:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 02, 2026
  • Original Inactive Date: Jul 01, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J062 - MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    St. Cloud VA Health Care System 4801 Veterans Drive St. Cloud , MN 56303
    USA
Description View Changes





















5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the
offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter
or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print)
(Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign)
(Signature of Contracting Officer)

1
4
0002
05-28-2026

None
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23

316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23

316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
To all Offerors/Bidders



36C26326Q0712

X

X

X






X
1
The purpose of the amendment is to provide answers to interested vendor questions.
See continuation pages




Curt LaRose
Contracting Officer


CONTINUATION PAGE
Q1. There is a discrepancy in the SOW. On page 5 of the Solicitation, under New Light Pole concrete base, paragraph 1, it states that a 3/4 thick grounding rod is to be used. On page 6 of the Solicitation, under Material Components, paragraph 5, it states that a 5/8 thick grounding rod to be used. What is the size that you are asking to be used?
A1. Answer: 5/8 thick grounding rod, as stated in the Material Components section, is the correct size.
Q2. On light pole 1-10 there is an additional box attached to it. What s in the box and does it require special treatment?
A2. Answer: The box contains chains to barricade the adjacent road if needed. No electricity in the box. Paint as needed.
Q3. The Overview, paragraph 2, of the SOW states that there are approximately 31 light poles that require paint repair, not entire repaint. There are 26 poles that have the bases being replaced that are identified. Please confirm that those same 26 are the ones that require paint repair and identify the five (5) additional poles require this paint.
A3. Answer: For the 26 poles receiving new concrete bases; re-paint/rust repair treatment shall be required for the entire pole (including its breakaway base), and re-stencil with its corresponding pole ID number.
For the other 17 poles, affected by this project, but not receiving a new concrete base, they will be required to receive re-paint/rust repair treatment (touched up), where needed. Re-stencil with its corresponding pole ID number if necessary.
Q4. To what extent must the poles be painted? Is the expectation to remove rust and flaking old paint and re-paint the entire pole?
A4. Answer: Refer to the answer A3.
Q5. It was stated at the site visit that there might be conduit in the poles that is metal and not PVC. The Solicitation states on page five (5) under the New Light Pole concrete base section in paragraph 2, Conduit installed and the conductors shall be the same size and type as the ones removed. Please confirm that you want these to be replaced with PVC conduit and that PVC is to be used on all. That wiring being replaced is to be the same size and type but will likely need to be longer than existing to accommodate the taller light pole bases.
A5. Answer: Yes. PVC is to be the material to be used for the new concrete base conduits.
Q6. Do you know how deep the current bases extend into the ground?
A6. Answer: The current depth of the existing concrete bases is unknown.
Q7. Can you identify what type of surface is around light poles that need to be replaced and how many of each type (Grass/lawn, Asphalt, Concrete, Gravel)?
A7. Answer: The surface around the light poles is grass/lawn, except pole 113-8 which is asphalt pavement.
Q8. Please confirm that work and updates to wiring within the light pole will be completed by the VA in the time that the pole is downed, while the old base is removed and the new base is being created & cured.
A8. Answer: Yes. The VA will perform this work.
Q9. Please confirm that all light poles and break-away bases are intended to be re-used.
A9. Answer: Yes. All the light poles and break-away bases are intended to be re-used.
Q10. To what extent is the contractor expected to restore the grass/lawn in the affected area?
A10. Answer: The contractor is expected restore the surface around the pole with in kind materials.
Q11. There is indicated 26 bases needing replacement and 31 poles to touch-up. Are the 31 poles in addition to the 26 base replacement count for a total of 57 poles?
A11. Answer: Refer to the answer A3.
Q12. The poles can be placed proximal to the removed bases. Can they be painted or touched up at that same location or moved to an on-site lay down area?
A12. Answer: Yes.
Q13. Will fencing be required at each base when performing work? Steel or orange fence?
A13. Answer: Yes. An orange snow fence can be used.
Q14. Will concrete testing be required?
A14. Answer: Yes. The Contractor is required to do the concrete testing, as per your structural engineer of record recommendations.
Q15. Will a structural engineer be required for the base construction?
A 15. Answer: Yes.
Q16. Bullet point a page 5 of the 41 page RFP indicates to re-pull conductors if in good condition . Does this mean some existing conductors be used at other locations? Or all conductors must be new?
A16. Answer: All underground conductors should be replaced with new. Above ground conductors inside pole can be reused, if in good condition.
Q17. If precast bases are employed are there any special tamping requirements?
A17. Answer: This will be as per your structural engineer of record recommendations.
Q18. There is no reference to a bid bond/bonds. Will these be required and if so, is there is magnitude for the overall project?
A18. Answer: No bid bond/bonds.
Q19. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?
A19. Answer: This project is a new contract.
Q20. We are looking to verify whether or not this RFQ is only to be bid on by SBE/DBE companies or if all responses will be considered. I am referring to small or disadvantaged businesses as the below statement is outlined on page 40 of the RFQ provided for this project.
A20. Answer: This requirement is a Small Business Set-Aside.
Q21. Could you kindly email me the list of GC bidders or plan holders for this project? Alternatively, if you could direct me to someone who would have this information, please let me know.
A21. Answer: We do not have a list of G.C. bidders or plan holders for this project.
Q22. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.
If not brand new, could you please provide the current / previous contract number?

A22. Answer: This is a new contract
Provide answers to interested vendors questions
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 316 Robert Street N Suite 506
  • Saint Paul , MN 55101
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

May 18, 2026[Combined Synopsis/Solicitation (Updated)] J062--Replace street light pole concrete bases.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Maintenance & Support - Management Services for Education Data Response to this solicitation ...

State Government of Minnesota

Bid Due: 6/04/2026

...with the selected vendor, all data in RFP responses are public except for ...

Minneapolis Public Schools

Bid Due: 7/01/2026

...with Economic Modeling, LLC. This annual renewal provides a tool to provide data ...

State Government of Minnesota

Bid Due: 6/08/2026

...and shall include sufficient data to describe the substitution and any impact it ...

City of Apple Valley

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.