| Location: | California |
|---|---|
| Posted: | Jun 7, 2025 |
| Due: | Jul 7, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Marin County Stormwater Division is seeking engineering and design services of a qualified firm to develop designs and construction documents for green stormwater infrastructure. The project should take previously developed designs and bring them to 100% PS&E construction documents at each location. Additionally, the consultant shall conduct an opportunity analysis of future green stormwater infrastructure opportunities on County owned and maintained facilities that have not previously been considered.
The Marin County Stormwater Division's goals are to:
See RFP #62025 Marin County Green Stormwater Infrastructure Project 2025 for full details.

With GovernmentContracts, you can:
...Project: On-Call Airport Engineering, Design, and Architectural (A/E) Consulting Services (2026... inclusion on ...
Ventura County
Bid Due: 6/17/2026
..., and establishing the Badger Advance Meter Infrastructure Software (Beacon Saas). Copies of ...
City of Turlock
Bid Due: 6/22/2026
..., and establishing the Badger Advance Meter Infrastructure Software (Beacon Saas). Copies of ...
City of Turlock
Bid Due: 6/22/2026
...Partner No Contact Organization City of Los Angeles Department Engineering Bureau, Public Works ...
City of Los Angeles
Bid Due: 7/01/2026