| Location: | California |
|---|---|
| Posted: | Jun 7, 2025 |
| Due: | Jul 7, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Marin County Stormwater Division is seeking engineering and design services of a qualified firm to develop designs and construction documents for green stormwater infrastructure. The project should take previously developed designs and bring them to 100% PS&E construction documents at each location. Additionally, the consultant shall conduct an opportunity analysis of future green stormwater infrastructure opportunities on County owned and maintained facilities that have not previously been considered.
The Marin County Stormwater Division's goals are to:
See RFP #62025 Marin County Green Stormwater Infrastructure Project 2025 for full details.

With GovernmentContracts, you can:
...engineering consultants to conduct and prepare the Urban Water Management Plan 2025 Update. ...
City of Compton
Bid Due: 6/18/2026
...of Water Resources (DWR) Regulations. CONSULTANT will carry out studies and map local ...
County of San Joaquin
Bid Due: 6/15/2026
...Bid Title: Ray Stoyer Water Reclamation Facility Demolition Category: Engineering - RFPs Status...: ...
Padre Dam Municipal Water District
Bid Due: 7/02/2026
...For Proposal Water Supply Engineering 20868 , 20969 , 91151 , 95877 Project ...
Zone 7 Water Agency
Bid Due: 6/18/2026