| Location: | Washington |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EW-C6620 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the removal of existing railroad ties, and the construction and installation of new precast concrete deck panels and steel railing on top of the existing steel trestles near Rock Lake along the Palouse to Cascades State Park Trail. This includes but is not limited to the following:
1) TEMPORARY EROSION & SEDIMENT CONTROLS
2) GRADING AND SURFACING
3) TRESTLE EE-128 REPAIRS
4) TRESTLE EE-130 REPAIRS
5) TRESTLE EE-130 ROCK WALL REPAIRS
6) CONTAINMENT AND FALSEWORK

With GovernmentContracts, you can:
...Portwide 2026 Status Open Category Major Construction Bid Due Date 09/29/2026 02:00 PM ...
Port of Seattle
Bid Due: 9/29/2026
...South Concourse Evolution (SCE), Bid Package 2.1.01 - Building Concrete - New Status ...
Port of Seattle
Bid Due: 10/15/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Construction 909-11-Airport Facility ...
State Government of Washington
Bid Due: 11/20/2026
...Solicitation Information Title Portable Construction Equipment and Accessories Attachments- SW... Portable Construction Equipment ...
State Government of Washington
Bid Due: 10/08/2026