| Location: | New Mexico |
|---|---|
| Posted: | Apr 9, 2026 |
| Due: | Apr 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA4801I0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Contractor shall provide equipment, personnel, and labor to semi-annually inspect, maintain, and repair identified discrepancies for five existing aircraft sunshades, to include but not limited to: structure, metal roofing, lights, electric, bird nesting mitigation, lightning protection, obstruction lighting, safety reflective devices, fall protection, and any other unique attached features as applicable. At a minimum, the Contractor shall inspect for, report, document, and repair identified discrepancies to include: inherent structural weakness; corrosion; improper installation; design defect; electrical defect; weather or turbulence related damage; improper use; destruction; signs or evidence of electrical, structural or mechanical failure; severed item; evidence of stress, buckling, fatigue, etc.; missing hardware; loose hardware; wildlife intrusion; and/or other discrepancies not listed above.
Please review Draft PWS for more information.

With GovernmentContracts, you can:
...-Temperature Performance Grade 91 steel is one of the most widely used structural ...
ENERGY, DEPARTMENT OF
Bid Due: 6/05/2026
...ELF (Extremely Light Foam) is a new way to make structural foam that ...
ENERGY, DEPARTMENT OF
Bid Due: 12/01/2026
...combines structural flexibility with strong binding performance, which creates a practical path... design ...
ENERGY, DEPARTMENT OF
Bid Due: 6/30/2026
...National Laboratory simplifies the production of advanced porous materials while opening design... that ...
ENERGY, DEPARTMENT OF
Bid Due: 6/04/2026