UTAH COUNTY
PUBLIC WORKS DEPARTMENT
2855 South State Street
Provo, Utah 84606
(801) 851-8600
INVITATION TO BID
For
Utah County
Spanish Fork River Park
Pipe Fence
ITB # 2026-8
CLOSING DATE
FOR RECEIPT OF BIDS:
TIME:
PLACE:
Tuesday, May 19, 2026 at 3:00 pm
3:00 p.m. (Mountain Time)
Proposals are to be submitted through the State U3P
website, using the Bonfire (EUNA) eProcurement
platform.
NOTE: The Contractor is responsible for reading the contents of this bid, including but not limited to, the Scope of
Work, General Requirements, Specifications, the Drawings, and Agreement. The Contractor is also responsible to
visit the work sites before presenting a bid.
Privacy Notice: Pursuant to Section 63A-19-402 of Utah Code, personal data collected in
documents that would be classified as a public record may be made available to the public as
provided by Section 63G-2-201.
TABLE OF CONTENTS
INVITATION TO BID
Intent ............................................................................................................................4
Procedure .......................................................................................................................4
Rules of Procurement.....................................................................................................4
Bid Organization ............................................................................................................4
Proprietary Information .................................................................................................5
Questions and Clarifications ..........................................................................................5
Acceptance of Bid..........................................................................................................5
Disqualification of Bid...................................................................................................6
Disposition of Bids ........................................................................................................6
Interpretation of ITB ......................................................................................................6
Required Experience ......................................................................................................6
Evaluation Criteria .........................................................................................................7
General ..........................................................................................................................7
Bonds ............................................................................................................................7
GENERAL REQUIREMENTS
Alterations of Plans or Character of Work .....................................................................9
Brand Name ...................................................................................................................9
Change Order .................................................................................................................9
Completion Date ..........................................................................................................10
Liquidated Damages ....................................................................................................11
Cooperation .................................................................................................................. 11
Data Privacy.................................................................................................................11
Delivery/Shipping ........................................................................................................12
Inspection .....................................................................................................................12
Insurance ......................................................................................................................13
Keys .........................................................................................................................13
Legal .........................................................................................................................13
License .........................................................................................................................13
Payment........................................................................................................................13
Safety Requirements ....................................................................................................14
Sales Tax ......................................................................................................................14
Supervision of Work ....................................................................................................15
Surveying .....................................................................................................................15
Utilities .........................................................................................................................15
Statement of Applicable Standards and Specifications......................................................16
Invitation to Bid: Spanish Fork River Park Pipe Fence
Page |2
Specifications Measurement and Payment
General .........................................................................................................................17
General Conditions ......................................................................................................17
Mobilization and Demobilization ................................................................................18
Fence removal ..............................................................................................................18
2-3/8” Drill Pipe Fence……………….……………………………………………... 18
16’ Gate. .......................................................................................................................18
Park Entrance Gate. .....................................................................................................18
Park Entrance Bow.......................................................................................................18
PLANS “Spanish Fork River Park Pipe Fence” (the Drawings) ................... Attachment A
CONTRACTOR’S BID SCHEDULE ............................................................ Attachment B
CONTRACTOR INFORMATION FORM............................................................ Exhibit A
CERTIFICATE OF NON-COLLUSION ............................................................... Exhibit B
SAMPLE AGREEMENT WITH STANDARD TERMS & CONDITIONS......... Exhibit C
Invitation to Bid: Spanish Fork River Park Pipe Fence
Page |3
1. INVITATION TO BID
1.1 INTENT
Through this Invitation to Bid (ITB), Utah County intends to select a qualified contractor
to provide for the construction and completion of improvements to Spanish Fork River
Park located up Spanish Fork Canyon that meet in every detail, the specifications and
Spanish Fork River Park Pipe Fence plans, herein referred to as (the Drawings), included
in or referenced in this ITB.
The Contractor shall furnish all labor, materials, transportation, tools, equipment,
supplies, disposal fees, and other costs required to complete the work in accordance with
the terms hereof.
Pursuant to this ITB, an agreement will be executed, a sample copy of which is attached
as Exhibit C. The County will not entertain changes to its Standard Terms and
Conditions.
1.2 PROCEDURE
The procedure for response to this ITB, evaluation of bids, and selection of a Contractor
is as follows:
A. Interested entities will prepare and submit their bids prior to the specified Closing
Date for Receipt of Bids.
B. Utah County and/or its representatives will evaluate all submitted bids to
determine acceptance or rejection of the bids.
C. The selected bidder(s) will be required to sign an agreement, a sample of which is
included as Exhibit C.
1.3 RULES OF PROCUREMENT
A. This procurement shall conform to and is governed by The Utah County Division of
Purchasing, Procurement Rules and Regulations.
B. For this procurement, all bids must be submitted in the bid format outlined herein.
C. All prospective bidders must meet the required criteria as of the date of submission.
D. Respondents must provide all information requested in the Contractor Information
Form.
E. Utah County has established certain requirements with respect to bids to be submitted
by respondents. The use of "shall", "must", or "will", in this ITB indicates a
requirement or condition from which a material deviation will not be approved by
Utah County.
1.4 BID ORGANIZATION
A. Each respondent must submit its proposal digitally through the U3P website using the
State of Utah’s Bonfire (EUNA) account. The proposal must be submitted by
Tuesday, May 19, 2026, at 3:00pm.
Invitation to Bid: Spanish Fork River Park Pipe Fence
Page |4
B. Please submit with the bid the documents listed below. Before a contract can be
awarded, the selected contractor must provide all the documents listed below.
1. Completed Contractor’s Cost Proposal (Attachment B).
2. Completed Contractor Information Form (Exhibit A).
3. Completed Certificate of Non-Collusion (Exhibit B).
4. A copy of the bidder’s current local business license.
5. A copy of the bidder’s current Contractor License issued by the Utah Department
of Commerce, Division of Occupational and Professional Licensing.
6. Proof of required insurance.
7. Documentation from the County Treasurer of the bidder's county showing that
bidder is current on its personal property taxes.
8. Documentation of minimum of three years’ experience.
9. List of three similar projects, including contracting agency and contact
information.
1.5 PROPRIETARY INFORMATION
The Contractor shall mark proprietary information contained in the bid which is not to be
disclosed to the public or used for purposes other than the evaluation of the bids. Pricing
and service elements of the successful bid will not be considered proprietary.
1.6 QUESTIONS AND CLARIFICATIONS
A. All questions regarding this ITB must be submitted through the Utah Procurement
Place (U3P) Bonfire (EUNA) website or to the Utah County Purchasing Manager,
Robert Baxter, at RobertB@utahcounty.gov. The deadline for submission of
questions is end of business day Friday, May 15, 2026.
B. Bidders are urged and expected to inspect the site where services are to be performed
and to satisfy themselves as to all general and local conditions that may affect the cost
of performance of the Agreement, to the extend such information is reasonably
obtainable. In no event will a failure to inspect the site constitute grounds for
withdrawal of a bid after opening, or for a claim after award of the agreement.
1.7 ACCEPTANCE OF BID
A. Utah County reserves the right to reject any or all bids or waive minor irregularities
when to do so would be in the best interests of Utah County. Minor irregularities are
those which will not have a significant adverse effect on overall competition or
performance levels.
B. The responding party agrees that Utah County may terminate this procurement
procedure at any time, and Utah County shall have no liability or responsibility to the
responding party for any costs or expenses incurred in connection with this ITB, or
such party's response.
Invitation to Bid: Spanish Fork River Park Pipe Fence
Page |5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.