Spanish Fork River Park Pipe Fence

Location: Utah
Posted: Apr 29, 2026
Due: May 19, 2026
Agency: Utah County
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
Solicitation No: Bid No: 2026-8
Publication URL: To access bid details, please log in.
  • Spanish Fork River Park Pipe Fence
    Apr 29, 2026 - May 19, 2026
    Bid No: 2026-8

    Utah County intends to select a qualified contractor to provide for the construction and completion of improvements to Spanish Fork River Park located up Spanish Fork Canyon that meet in every detail, the specifications and Spanish Fork River Park Pipe Fence plans, herein referred to as (the Drawings), included in or referenced in this ITB. Submissions are to be made through the State U3P Bonfire (EUNA) website.

    Read More
    View RFP Document
  • Attachment Preview

    UTAH COUNTY
    PUBLIC WORKS DEPARTMENT
    2855 South State Street
    Provo, Utah 84606
    (801) 851-8600
    INVITATION TO BID
    For
    Utah County
    Spanish Fork River Park
    Pipe Fence
    ITB # 2026-8
    CLOSING DATE
    FOR RECEIPT OF BIDS:
    TIME:
    PLACE:
    Tuesday, May 19, 2026 at 3:00 pm
    3:00 p.m. (Mountain Time)
    Proposals are to be submitted through the State U3P
    website, using the Bonfire (EUNA) eProcurement
    platform.
    NOTE: The Contractor is responsible for reading the contents of this bid, including but not limited to, the Scope of
    Work, General Requirements, Specifications, the Drawings, and Agreement. The Contractor is also responsible to
    visit the work sites before presenting a bid.
    Privacy Notice: Pursuant to Section 63A-19-402 of Utah Code, personal data collected in
    documents that would be classified as a public record may be made available to the public as
    provided by Section 63G-2-201.
    TABLE OF CONTENTS
    INVITATION TO BID
    Intent ............................................................................................................................4
    Procedure .......................................................................................................................4
    Rules of Procurement.....................................................................................................4
    Bid Organization ............................................................................................................4
    Proprietary Information .................................................................................................5
    Questions and Clarifications ..........................................................................................5
    Acceptance of Bid..........................................................................................................5
    Disqualification of Bid...................................................................................................6
    Disposition of Bids ........................................................................................................6
    Interpretation of ITB ......................................................................................................6
    Required Experience ......................................................................................................6
    Evaluation Criteria .........................................................................................................7
    General ..........................................................................................................................7
    Bonds ............................................................................................................................7
    GENERAL REQUIREMENTS
    Alterations of Plans or Character of Work .....................................................................9
    Brand Name ...................................................................................................................9
    Change Order .................................................................................................................9
    Completion Date ..........................................................................................................10
    Liquidated Damages ....................................................................................................11
    Cooperation .................................................................................................................. 11
    Data Privacy.................................................................................................................11
    Delivery/Shipping ........................................................................................................12
    Inspection .....................................................................................................................12
    Insurance ......................................................................................................................13
    Keys .........................................................................................................................13
    Legal .........................................................................................................................13
    License .........................................................................................................................13
    Payment........................................................................................................................13
    Safety Requirements ....................................................................................................14
    Sales Tax ......................................................................................................................14
    Supervision of Work ....................................................................................................15
    Surveying .....................................................................................................................15
    Utilities .........................................................................................................................15
    Statement of Applicable Standards and Specifications......................................................16
    Invitation to Bid: Spanish Fork River Park Pipe Fence
    Page |2
    Specifications Measurement and Payment
    General .........................................................................................................................17
    General Conditions ......................................................................................................17
    Mobilization and Demobilization ................................................................................18
    Fence removal ..............................................................................................................18
    2-3/8” Drill Pipe Fence……………….……………………………………………... 18
    16’ Gate. .......................................................................................................................18
    Park Entrance Gate. .....................................................................................................18
    Park Entrance Bow.......................................................................................................18
    PLANS “Spanish Fork River Park Pipe Fence” (the Drawings) ................... Attachment A
    CONTRACTOR’S BID SCHEDULE ............................................................ Attachment B
    CONTRACTOR INFORMATION FORM............................................................ Exhibit A
    CERTIFICATE OF NON-COLLUSION ............................................................... Exhibit B
    SAMPLE AGREEMENT WITH STANDARD TERMS & CONDITIONS......... Exhibit C
    Invitation to Bid: Spanish Fork River Park Pipe Fence
    Page |3
    1. INVITATION TO BID
    1.1 INTENT
    Through this Invitation to Bid (ITB), Utah County intends to select a qualified contractor
    to provide for the construction and completion of improvements to Spanish Fork River
    Park located up Spanish Fork Canyon that meet in every detail, the specifications and
    Spanish Fork River Park Pipe Fence plans, herein referred to as (the Drawings), included
    in or referenced in this ITB.
    The Contractor shall furnish all labor, materials, transportation, tools, equipment,
    supplies, disposal fees, and other costs required to complete the work in accordance with
    the terms hereof.
    Pursuant to this ITB, an agreement will be executed, a sample copy of which is attached
    as Exhibit C. The County will not entertain changes to its Standard Terms and
    Conditions.
    1.2 PROCEDURE
    The procedure for response to this ITB, evaluation of bids, and selection of a Contractor
    is as follows:
    A. Interested entities will prepare and submit their bids prior to the specified Closing
    Date for Receipt of Bids.
    B. Utah County and/or its representatives will evaluate all submitted bids to
    determine acceptance or rejection of the bids.
    C. The selected bidder(s) will be required to sign an agreement, a sample of which is
    included as Exhibit C.
    1.3 RULES OF PROCUREMENT
    A. This procurement shall conform to and is governed by The Utah County Division of
    Purchasing, Procurement Rules and Regulations.
    B. For this procurement, all bids must be submitted in the bid format outlined herein.
    C. All prospective bidders must meet the required criteria as of the date of submission.
    D. Respondents must provide all information requested in the Contractor Information
    Form.
    E. Utah County has established certain requirements with respect to bids to be submitted
    by respondents. The use of "shall", "must", or "will", in this ITB indicates a
    requirement or condition from which a material deviation will not be approved by
    Utah County.
    1.4 BID ORGANIZATION
    A. Each respondent must submit its proposal digitally through the U3P website using the
    State of Utah’s Bonfire (EUNA) account. The proposal must be submitted by
    Tuesday, May 19, 2026, at 3:00pm.
    Invitation to Bid: Spanish Fork River Park Pipe Fence
    Page |4
    B. Please submit with the bid the documents listed below. Before a contract can be
    awarded, the selected contractor must provide all the documents listed below.
    1. Completed Contractor’s Cost Proposal (Attachment B).
    2. Completed Contractor Information Form (Exhibit A).
    3. Completed Certificate of Non-Collusion (Exhibit B).
    4. A copy of the bidder’s current local business license.
    5. A copy of the bidder’s current Contractor License issued by the Utah Department
    of Commerce, Division of Occupational and Professional Licensing.
    6. Proof of required insurance.
    7. Documentation from the County Treasurer of the bidder's county showing that
    bidder is current on its personal property taxes.
    8. Documentation of minimum of three years’ experience.
    9. List of three similar projects, including contracting agency and contact
    information.
    1.5 PROPRIETARY INFORMATION
    The Contractor shall mark proprietary information contained in the bid which is not to be
    disclosed to the public or used for purposes other than the evaluation of the bids. Pricing
    and service elements of the successful bid will not be considered proprietary.
    1.6 QUESTIONS AND CLARIFICATIONS
    A. All questions regarding this ITB must be submitted through the Utah Procurement
    Place (U3P) Bonfire (EUNA) website or to the Utah County Purchasing Manager,
    Robert Baxter, at RobertB@utahcounty.gov. The deadline for submission of
    questions is end of business day Friday, May 15, 2026.
    B. Bidders are urged and expected to inspect the site where services are to be performed
    and to satisfy themselves as to all general and local conditions that may affect the cost
    of performance of the Agreement, to the extend such information is reasonably
    obtainable. In no event will a failure to inspect the site constitute grounds for
    withdrawal of a bid after opening, or for a claim after award of the agreement.
    1.7 ACCEPTANCE OF BID
    A. Utah County reserves the right to reject any or all bids or waive minor irregularities
    when to do so would be in the best interests of Utah County. Minor irregularities are
    those which will not have a significant adverse effect on overall competition or
    performance levels.
    B. The responding party agrees that Utah County may terminate this procurement
    procedure at any time, and Utah County shall have no liability or responsibility to the
    responding party for any costs or expenses incurred in connection with this ITB, or
    such party's response.
    Invitation to Bid: Spanish Fork River Park Pipe Fence
    Page |5
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...existing chain link fabric no-climb fence with new paneled no-climb fence. Construction Cost ...

    State Government of Utah

    Bid Due: 6/23/2026

    ...) The construction of a 6' tall chain link fence around perimeter of ...

    State Government of Utah

    Bid Due: 6/16/2026

    ...hydrant, vinyl privacy fence, asphalt tie in to existing road, stone dust/crusher fines ...

    State Government of Utah

    Bid Due: 6/09/2026

    ...fence will encompass the perimeter. A 12' x 20' pre-cast ballistic rated security ...

    State Government of Utah

    Bid Due: 6/17/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.