SET#
Maize U.S.D. #266
Bus Storage Building
Bid Package
Bid Documents & Specifications
MARCH 2026
Schaefer Project: 5537.50
Maize USD 266 - Bus Storage Building
Schaefer #5537.50
SECTION 00 01 10 - TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
Division 00 -- Procurement and Contracting Requirements
00 01 10 - Table of Contents
00 21 13 - Instructions to Bidders
Maize U.S.D. Project Requirements and Standard Conditions
Maize U.S.D. Standard Form (Bid Form)
1.01 AIA DOCUMENTS
AIA A101 Standard Form of Agreement Between Owner & Contractor where the Basis of
Payment is a Stipulated Sum - 2017
1. AIA A101 - 2017 Exhibit A, Insurance and Bonds
AIA A201 General Conditions of the Contract For Construction - 2017, with amendments
1.02 AIA DOCUMENTS BY REFERENCE ONLY
AIA A310 Bid Bond - 2010
AIA A312 Performance Bond and Payment Bond - 2010
OTHER DOCUMENTS
Bond To The State Of Kansas - Statutory Payment Bond - P ublic Work
SPECIFICATIONS
Division 01 -- General Requirements
01 10 00 - Summary
01 23 00 - Alternates
01 30 00 - Administrative Requirements
01 40 00 - Quality Requirements
01 41 00 - Regulatory Requirements
01 42 16 - Definitions
01 45 33 - Code-Required Special Inspections
01 50 00 - Temporary Facilities and Controls
01 51 00 - Temporary Utilities
01 57 13 - Temporary Erosion and Sediment Control
01 60 00 - Product Requirements
01 70 00 - Execution and Closeout Requirements
01 78 00 - Closeout Submittals
Division 03 -- Concrete
03 01 00 - Maintenance of Concrete
03 10 00 - Concrete Forming and Accessories
03 20 00 - Concrete Reinforcing
03 30 00 - Cast-in-Place Concrete
Division 05 -- Metals
05 50 00 - Metal Fabrications
Division 07 -- Thermal and Moisture Protection
07 21 00 - Thermal Insulation
Table of Contents
00 01 10 - 1
MARCH 2026
Maize USD 266 - Bus Storage Building
07 62 00 - Sheet Metal Flashing and Trim
07 92 00 - Joint Sealants
Division 08 -- Openings
08 11 13 - Hollow Metal Doors and Frames
08 36 13 - Sectional Doors
08 71 00 - Door Hardware
Hardware Schedule
Division 09 -- Finishes
09 91 13 - Exterior Painting
Division 10 -- Specialties
10 44 00 - Fire Protection Specialties
Division 13 -- Special Construction
13 34 19 - Metal Building Systems
Division 31 -- Earthwork
3 1 20 00 - Earth Moving
Geotechnical Engineering Report
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly Ash Soil Stabilization
Division 32 -- Exterior Improvements
32 13 13 - Concrete Paving
32 31 13 - Chain Link Fences and Gates
END OF SECTION
Schaefer #5537.50
Table of Contents
00 01 10 - 2
MARCH 2026
Maize USD 266 - Bus Storage Building
Schaefer #5537.50
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
INVITATION
1.01 BID SUBMISSION
A. BID DATE, TIME AND LOCATION: Lump Sum Bids signed and under seal, executed,
and dated will be received in accordance with the following:
DATE:
THURSDAY, 9 APRIL 2 026
LOCATION: Schaefer Architecture, Inc.
257 North Broadway
Wichita, KS 67202
TIME:
2:00 p.m. local time
1. Bids (proposals) shall include furnishing all labor, materials, equipment and
performing the Work for the above described project in strict accordance with the
Bidding Documents.
B. Offers submitted after the above time will be returned to the bidder unopened.
C. Offers will be opened publicly immediately after the time for receipt of bids.
1.02 INTENT
A. The intent of this Bid request is to obtain an offer to perform work to complete the
construction of (1) metal storage building for buses located behind (west) the Maize USD
266 Maintenance Building at 4750 N. 119th St. W., Maize, KS 67101 for a Stipulated
Sum contract, in accordance with Contract Documents.
B. Work shall be included under a Single Contract.
C. Each General Contractor shall select the various sub-contractors and suppliers with
whom they wish to work.
1. The Owner urges General Contractors to consider local vendors and sub contractors
in the bidding process.
1.03 WORK IDENTIFIED IN THE CONTRACT DOCUMENTS
A. Work of this proposed Contract comprises b uilding construction and site development,
including general construction and structural Work.
1.04 CONTRACT TIME
A. Identify Contract Time to be Substantially Complete in the Bid Form. The completion
date in the Agreement shall be the Contract Time added to the commencement date.
B. The Work shall be completed within thirty calendar days following the date of Substantial
Completion, unless specifically agreed otherwise, in writing, on the Certificate of
Substantial Completion.
BID DOCUMENTS AND CONTRACT DOCUMENTS
2.01 DEFINITIONS
A. All definitions set forth in the General Conditions of the Contract for Construction (AIA
Document A201 - 2017 Edition) or in other Contract Documents are applicable to the
Bidding Documents.
B. Addenda - Written or graphic instruments issued by the Architect before the acceptance
of Bids that modify or interpret the Bidding Documents, including drawings and Project
Manual by additions, deletions, clarifications, or corrections. Addenda become part of
Instructions to Bidders
00 21 13 - 1
MARCH 2026
Maize USD 266 - Bus Storage Building
Schaefer #5537.50
the Contract Documents when the Owner accepts the Bid, as well as part of the Bidding
Documents.
C. Alternate Bid (or Alternate) - an amount stated in the Bid to be added to or deducted
from the amount of the Base Bid if the corresponding change in project scope or
materials or methods of construction described in the Bidding Documents is accepted.
D. Base Bid - the sum stated in the Bid for which the Bidder offers to perform the Work
described as the Base, to which Work may be added or deducted for sums stated in
Alternate Bids.
E. Bid - a Bidder's complete and properly signed proposal to do the Work or designated
portion thereof for the sums stipulated therein supported by data called for by the
Bidding Documents.
F. Bidder - One who submits a Bid for the Work to the Owner.
G. Bid Documents: Contract Documents supplemented with Invitation To Bid, Instructions
to Bidders, Bid Form, Supplements To Bid Forms and Appendices identified including any
addenda issued prior to receipt of bids.
H. Bid Security - A Bid Bond with a Surety licensed in the State of Kansas.
I. Contract - S tandard Form of Agreement Between Owner and Contractor (AIA Document
A101 - 2017 Edition), as supplemented, together with all documents incorporated therein
by reference or amendment.
J. Contract Documents: Defined in AIA A201 Article 1 including issued Addenda.
K. Project Manual - The volume(s) which binds together the Bidding Documents, General
and Supplementary Conditions, and Specifications identified for this Contract. The
several parts of the volume(s) are listed in the Table of Contents of the volume(s).
L. Sub-bidder (or Sub-contractor) - One who submits a bid to a Bidder for materials and/or
labor for a portion of the Work.
M. Unit Price - an amount stated in the Bid as a price per unit of measurement for materials
or services as described in the Contract Documents
2.02 CONTRACT DOCUMENTS IDENTIFICATION
A. The Contract Documents are identified as P roject Number Schaefer #5 537.50, as
prepared by Schaefer Architecture < >who is located at 257 N. Broadway, Wichita, KS,
67202 and with contents as identified in the T able of Contents.
2.03 EXAMINATION
A. Bid Documents may be viewed by coordinating with one of the select list of General
Contractors.
B. Upon receipt of Bid Documents verify that documents are complete. Notify Schaefer
Architecture should the documents be incomplete.
C. Immediately notify Schaefer Architecture upon finding discrepancies or omissions in the
Bid Documents.
2.04 INQUIRIES
A. Direct inquiries regarding Bidding Documents to:
1. Architectural - Gary Holler, Schaefer Architecture, 257 N. Broadway, Wichita, KS
67202, phone (316) 684-0171, gholler@schaefer-arch.com.
2. Structural - D esiree Morrell, Dudley Williams & Associates, P.A., 230 Laura, Wichita,
KS, 67211, phone (316) 263-7591, dmorrell@ dwase.com.
Instructions to Bidders
00 21 13 - 2
MARCH 2026