Facilities: JFK Colisseum Chiller Project

Location: New Hampshire
Posted: Sep 1, 2026
Due: Sep 18, 2026
Agency: City of Manchester
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 2600032
Publication URL: To access bid details, please log in.
Bid # Description Download PDF Bid Opening Addenda Results
2600032

Facilities: JFK Colisseum Chiller Project

Questions: jgagne@manchesternh.gov

RFQ

Qualifications Due: 9/18/2026 by 2:00pm

Attachment Preview

Request for Qualifications (Design-Build Contract)
City of Manchester, NH Department of Public Works
Administration of Project: DPW-Facilities
Project Name JFK Coliseum Chiller Project
Project Location 303 Beech Street
City / County Manchester, NH
Owner
City of Manchester Parks & Recreation
Delivery Method Design-Build
No. of paper copies requested (stapled, not bound)
0
Response Deadline
Project Number
Project Manager
9/18/2026
2600032
Josh Gagne
2:00 PM local time
Contracting Authority DPW-Facilities
Prevailing Wages Federal
No. of electronic copies requested (PDF) 1 emailed copy
Submit the requested number of Statements of Qualifications, attached, directly to Josh Gagne jgagne@manchesternh.gov.
See Section F of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Josh Gagne at jgagne@manchesternh.gov. with the project number
included in the subject line (no phone calls please). Questions will be answered until one week before the response deadline.
The name of the party submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The City of Manchester DPW-Facilities requests interested firms submit qualifications for Design-Build (DB) services for
replacing the ice rink refrigeration system, cooling tower and switch gear at the JFK Coliseum.
The project will include design and construction services necessary for replacing the chiller, along with required pumps,
cooling tower, piping, controls integration, switch gear and electrical modifications.
Additional scope and services may be added as required by DPW-Facilities.
The project scope will be developed as a part of this project from DPW Design Standards as provided by the Facilities
Department acting as the Criteria Architect/Engineer (“Criteria A/E”).
All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority
and/or Owner’s policies and procedures.
B. Scope of Services
The selected Design-Builder (“DB”), will provide the following categories of services: develop and maintain estimates of
probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the
Schematic Design, Design Development, Construction Documents, Construction and Closeout stages.
Additional Project Scope Information:
Chiller Selection: Conduct a thorough analysis to select the most suitable chiller unit based on capacity, refrigerant,
energy efficiency, and compatibility with existing equipment.
Equipment Pre-Purchase: DB to determine if there is a need to pre-purchase the new chiller, as well as switch gear, based
on an assessment of equipment availability/lead times, and schedule requirement to have the new chiller in service by
August 2027.
System Integration: Ensure proper integration of the new chiller with the existing chiller plant, including electrical,
mechanical, and control systems.
Environmental Compliance: Ensure that the project complies with all environmental regulations, including refrigerant
handling and disposal.
Documentation: Provide and maintain design drawings, construction drawings, bid drawings and as-builts per DPW-
Facilities requirements.
Publish Date: 09/03/2026
Page 1 of 5
Request for Qualifications (Design-Build Contract) continued
Preconstruction Services: The DB will work cooperatively with the Project Team, and will provide, among other services,
schedule development, estimate development, schematic design, design development, construction documents
preparation, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages.
Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with
the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods
of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule
agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring
compliance equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the
Contracting Authority. The Contracting Authority reserves the right to approve the DB’s selection of subcontractors.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications below
is a list of relevant scope of work requirements for this RFQ:
1. Experience with DB Project Delivery method
2. Previous demonstrated DB experience with similar type chilled water systems and chiller
replacement projects.
3. Previous demonstrated cost estimating and cost control for chiller replacement projects within DB
4. Previous demonstrated project schedule and development, maintenance, and reporting throughout the
entire project within DB delivery method.
5. Familiarity and successful past project management, construction, and design experience in Manchester, NH
C.
Funding / Estimated Budget
Total Project Cost $1,300,000
Construction Cost $1,100,000
Grant Funding
Other Funding
$ 850,000
TBD
Publish Date: 09/03/2026
Page 2 of 5
Request for Qualifications (Design-Build Contract) continued
D.
Anticipated Schedule
DB Preconstruction Start
Construction Start
Substantial Completion of all Work
DB Services Completed
11 / 5 / 26
4 / 15 / 27
08 / 15 / 27
09/ 27
E. Evaluation Criteria for Selection
Selection Criteria: The DB will be selected using (i) qualifications-based process during the Request for Qualifications
(“RFQ”) stage to develop a short list and (ii) best value process during the Request for Proposal stage. The qualifications-
based criteria for the RFQ is included in this announcement. The best value criteria used in evaluating proposals from
short listed firms will include such factors that are determined to derive or offer the greatest value and qualification to the
Owner.
Short List: Each firm responding to this RFQ will be evaluated and selected based on its qualifications and the
qualifications and experience of the particular individuals identified as the candidate's proposed team for the Project. After
evaluating the responses to this RFQ, the Contracting Authority will select a short list of no greater than five candidates
that it considers to be the most qualified, except if the Contracting Authority determines that fewer than three firms are
qualified, it will only select the qualified firms.
Request for Proposal: The short-listed firms shall be sent a Request for Proposal (“RFP”) that will invite the firms to submit
pricing proposals. The short-listed candidates will also receive (i) form of the Agreement with the Contracting Authority
containing the contract terms and conditions, (ii) set of the most recent criteria documents and (iii) proposed Project
schedule.
Interview: After submitting responses to the RFP, the short-listed firms may be interviewed by the Contracting Authority
and representatives of the Owner. The purpose of the interview will be to meet the proposed Project team, become
familiar with key personnel, and understand the project approach and ability to meet the stated objectives for the Project.
Please be prepared to discuss with specificity the firm’s capacity to conduct this work in compliance with the timetable,
budget expectations. The Contracting Authority will notify each short-listed firm to schedule individual times for the
interviews.
Selection Schedule: Tentative schedule is subject to change.
Qualifications Due
RFP issued to the Short-Listed Firms
RFP Proposals Due
Interviews
Selection of DB
9/18/2026
10/2/2026
10/23/2026
10/29/2026
11/4/2026
Cancellation and Rejection: The Contracting Authority reserves the right to reject all proposals and cancel at any time for
any reason this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall
have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right
to waive minor variations in the selection process.
Publish Date: 09/03/2026
Page 3 of 5
Request for Qualifications (Design-Build Contract) continued
F. Submittal Instructions
Firms are required to submit the attached Statement of Qualifications.
Statements of Qualifications must be submitted electronically by email to Josh Gagne at jgagne@manchesternh.gov.
Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your
firm’s name. Use the “print” feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If
possible, please reduce the file size of the PDF. Submittals are limited to one email with a maximum file size of 25 MB.
Also, please insert the project number and firm name followed by “SOQ” in the email subject line.
Paper copies of the Statement of Qualifications, will not be accepted.
Facsimile copies of the Statement of Qualifications will not be accepted.
Unless otherwise noted or exempt, all documents submitted to the Contracting Authority in response to this RFQ and
subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following
information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals
which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance.
Proposers are requested to submit the following information in response to this RFQ within Section H of the Statement of
Qualification form.
1. Summary: Provide a summary, on one page or less, describing why your firm/team is the most qualified for the
Project.
2. Bonding/Insurance: Provide evidence of capacity to provide bonding in the amount of the construction budget
(e.g. a letter from your Surety agent stating that one or more Sureties will issue Bonds in the amount of the
construction budget if your team is selected) and a copy of the firm's certificate of insurance showing the firm's
current limits of liability for commercial general liability, employer's liability, business automobile liability, and
professional liability insurance.
3. Management Systems: Describe the scheduling and cost control systems the firm would propose to use for the
Project.
4. Self-Performed Work: Indicate whether the firm intends to self-perform any work on the Project through a
competitive process and, if so, the nature of the work and capability to self-perform.
5. Estimating: Demonstrated track record of performance of in-house estimating on projects comparable to the
Project.
6. Scheduling: Demonstrated track record of performance managing projects to the original schedule.
Firms are requested to identify professional registrations, memberships and credentials including but not limited to: LEED
GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction
industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the Statement of
Qualification form.
Publish Date: 09/03/2026
Page 4 of 5
Design-Build Selection Rating Form
Project Name JFK Coliseum Chiller Project
Project Number 2600032
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location and Workload (Maximum 5 points)
a. Proximity of firm to project site
Less than 50 miles
50 miles to 100 miles
More than 100 miles
Value
5
2
1
Score
2. Primary Qualifications (Maximum 35 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to
coordinate construction documents and
develop accurate estimates and schedules
Experience / ability of field representatives to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 10 points)
a. Key consultants
Experience / ability of key consultants to
perform effectively and collaboratively
0 - 10
0 - 10
0-5
Max =
25
0 - 10
0 - 10
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED*** Registered / Certified project experience
c. BIM project experience
Less than 3 sample projects
3 to 6 sample projects
More than 6 sample projects
Registered LEED v4 or v4.1 projects
Certified LEED v4 or v4.1 projects
Training and knowledge
Direct project experience
d. Team organization
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 20 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
Past performance as indicated by
evaluations and letters of reference
Less than 3 projects
3 to 6 projects
More than 6 projects
c. Budget and schedule management
Performance in completing projects within
original construction budget and schedule
0
2 Max = 3
3
1
2 Max = 2
1
3 Max = 3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
Notes:
Committee Evaluation:
Name
Signature
Publish Date: 09/03/2026
Subtotal
Date
Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...in writing and accompanied by a self addressed, stamped business size envelope. SPECIFICATIONS. ...

City of Laconia

Bid Due: 9/30/2026

...in writing via email in accordance with the instructions in this provision. Each ...

LABOR, DEPARTMENT OF

Bid Due: 10/05/2026

...Systems Manager for the Town of Bedford Paul Connolly in writing. pconnolly@bedfordnh.gov Submit...

Town of Bedford

Bid Due: 10/02/2026

...be submitted in writing, and must be received by the Purchasing Manager no ...

City of Concord

Bid Due: 10/14/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.