| Location: | Federal |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jul 22, 2026 |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | SPRHA1-26-R-B2EAID |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Program: B-2 Main Engine Auxiliary Inlet Door (EAID) Performance Based Logistics (PBL) Strategy
Organization: 423rd Supply Chain Management Squadron (SCMS), and 429 SCMS/Enterprise Commodity Council (ECC)
Scope
The ECC has developed a Cross-Functional Team (CFT) comprised of members of the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG squadron. The B-2 EAID team is seeking information towards developing a PBL support strategy to improve supply chain efficiencies, material availability, and supplier base of the B-2 EAID and its subcomponents. The CFT plans to utilize Key Performance Indicators (KPI) to measure Contractor performance to meet critical goals in support of the warfighter mission.
Background
The EAIDs are vital components of the B-2 Spirit and are used to prevent air flow separation to reduce power loss at low aircraft speeds. Ahead of each air intake inlet is a serrated slit-like auxiliary inlet which removes the turbulent boundary layer air, preventing it from entering the engine. This boundary layer air is then mixed with the exhaust to cool its temperature and reduce the infrared signature of the aircraft, part of its low observable system. The B-2 is a multi-role, long-range, high-altitude bomber, capable of flying intercontinental missions without refueling, then penetrating present and predicted sophisticated enemy defenses.
Current EAID end-item depot activation and repair constraints are impacting 100% of scheduled aircraft Program Depot Maintenance (PDM). A 100% PDM task to replace EAIDs with serviceable assets was signed in 2017 but has been deferred since 2019. The B-2 Spirit is scheduled to be in service through 2058.
Developing Strategy
The objectives of this PBL contract are to: (1) improve and sustain readiness; (2) Improve piece part supportability; (3) Activate, increase throughput, and maximize capability within the OO-ALC depot; (4) Improve demand planning and forecast collaboration, and (5) Gain increased OEM end item and tooling engineering support.
Under a performance-based approach, end-item sustainment is managed through integrated packages driven by output performance metrics (availability and reliability) rather than input-based measures. To establish clear accountability, this strategy will be structured under a single product support integrator. Flexible sustainment that incorporates direct vendor delivery, technology insertion, reliability-centered maintenance, process improvement engineering, and public/private partnering will be needed to achieve mission support objectives outlined above.
It is anticipated the performance-based support and measurement will be tracked on an end-item level to include 100% of the material needed to successfully overhaul each B-2 EAID end-item.
The CFT seeks to develop a contract that will support the following strategic requirements:
As part of this requirement, it is expected the Contractor will accept the responsibility of identifying and developing new (AF engineering approved) sources of manufacture and working with the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG maintenance squadron to ensure all parts are available upon demand.
The CFT is asking for feedback from the OEM, Northrop Grumman Corporation (NGC), representatives regarding the performance-based support for the B-2 EAID and components through the construct of a US Air Force (USAF)/DLA contractual relationship. The CFT is looking to NGC to help shape the strategy of this effort through their open comments/feedback on the topics/questions below.
Questions:
The government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officer and Program Manager by 22 July 2026 at the following email addressed:
Justin Rogers
Contracting Officer
justin.rogers.28@us.af.mil
David Olson
Lead Program Manager
david.olson.25@us.af.mil
Attachments:

With GovernmentContracts, you can:
...Technology (IT) Manager to provide a wide range of IT management and administrative ...
TREASURY, DEPARTMENT OF THE
Bid Due: 8/31/2026
...Professional Environmental Consulting Services Flint Hills Regional Council, Inc. Ogden, KS... environmental consulting ...
American Planning Association
Bid Due: 8/06/2026
...surveillance systems; Facilities management, including custodial, maintenance, food service, laundry, and IT..., including ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/03/2026
...accountability in the management of public resources. Advisors are individuals hired under personal ...
TREASURY, DEPARTMENT OF THE
Bid Due: 12/31/2026