| Location: | Georgia |
|---|---|
| Posted: | May 1, 2026 |
| Due: | May 28, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
New Bid Date: Thursday, May 28, 2026
New Bid Time: 2:00 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum No. One has been issued
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...linear feet of corroded corrugated metal pipe (CMP), replacement of 8 linear feet ...
City of Sandy Springs
Bid Due: 7/07/2026
...: Link Description Construction of New Freestanding 11,000 sf Pre-Engineered Metal Building in ...
State Government of Georgia
Bid Due: 6/30/2026
...upgrades; and the addition of a pre-engineered metal building to enclose the UV ...
Cobb County
Bid Due: 6/11/2026
...for the following proposal packages: 7A. PRE-ENGINEERED METAL BUILDING ROOFING / TRIM 7B. ...
State Government of Georgia
Bid Due: 6/18/2026