RFB-138-25 Structural Repairs Natural Bridge State Park

Location: Kentucky
Posted: Nov 21, 2024
Due: Dec 4, 2024
Agency: State Government of Kentucky
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFB-785-2500000286-1
Publication URL: To access bid details, please log in.

Description: RFB-138-25 Structural Repairs Natural Bridge State Park

Department: Facilities & Support Services

Buyer: Kristi Sharp

Solicitation Number: RFB-785-2500000286-1

Type: Request for Bids (RFB)

Category: Construction

Closing Date and Time: 12/04/2024 01:30 PM EST


Buyer Information
Buyer Name
Susan Ward
Buyer Email
Susan.Ward@ky.gov
Buyer Phone
502-226-0335
Important Dates
Issue Date
11/14/2024
Closing Date
12/04/2024 01:30 PM EST
Bid Opening Date
12/04/2024 02:30 PM EST
Last Amended
-
Department Information
Category
Construction
Type
Request for Bids
Document Department
785
Status
Open
Description
RFB-131-25 EDU KSD Brady HVAC Project
Group 1
Default
Number of Lines: 1
Line Number Commodity Description Details Requested
1
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** The following Project Narrative describes Mechanical, Electrical, and Architectural work associated with the HVAC renovation of Brady Hall on Kentucky School for the Deaf Campus. Mechanical: All existing heat pumps and their associated piping runouts/valves will be replaced. Two new Dedicated Outdoor Air units will be installed on the roof to both ensure all spaces receive quality outdoor air and that a proper relative humidity and positive building pressure are maintained. The existing hydronics pumps as well as their associated air separator and expansion tank will be replaced. The existing domestic water heater will also be replaced. Existing ductwork and piping will be mostly reused. A new, web-based front-end control system will be provided. The existing kitchen exhaust system including hoods, make-up air unit, and exhaust fan will be replaced. Electrical: Existing second floor lighting to be replaced with new LED lighting. Lighting controls will be replaced throughout the building and be brought up to code. The existing fire alarm system to be replaced with a new mass notification fire alarm system. All devices and cabling to be replaced with new. Summer of 2025 - Replace all of the existing panelboards with new. Existing switchboard to remain. Summer of 2026 - The existing switchboard, secondary service lateral and panelboard feeders to be replaced with new. Electrical shutdown to be coordinated between the school and the utility company. Contractor to minimize downtime. Architectural: The Architect will be providing support as required to all for the installation of the mechanical system. Acoustical tile and grid ceilings will be replaced in all areas of major above-ceiling work, including all major corridors. Areas where less intrusive above-ceiling work is required will be indicated to have only partial replacement. Restrooms with drywall ceilings will have their ceilings removed so that mechanical work can be performed above and then the ceilings will be replaced. Louvers at the soffits over perimeter windows will be removed and the soffit plaster repaired. New chases for mechanical routing will be constructed in a few discrete places on the upper floor. Roof penetrations required for the mechanical renovation will be reused, patched, capped, or otherwise repaired. Roof-installed ductwork will be appropriately supported with attachment to building structure.
Specifications
Commodity Code
912
Service From
12/15/2024
Service To
11/01/2026
View Purchase History
Additional Information
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Buyer: Kristi Sharp Solicitation Number: RFB-785-2600000608-1 Type: Request for Bids (RFB) Category...: Construction ...

State Government of Kentucky

Bid Due: 6/23/2026

...; Support Services Buyer: Kristi Sharp Solicitation Number: RFP-785-2600000442-2 Type: Request...

State Government of Kentucky

Bid Due: 6/30/2026

...; Support Services Buyer: Kristi Sharp Solicitation Number: RFB-785-2600000629-1 Type: Request for Bids...

State Government of Kentucky

Bid Due: 6/24/2026

...& Support Services Buyer: Kristi Sharp Solicitation Number: RFB-785-2600000646-2 Type: Request...

State Government of Kentucky

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.