| Location: | Ohio |
|---|---|
| Posted: | Oct 23, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | Ohio Facility Construction Commission |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 20261016 |
| Publication URL: | To access bid details, please log in. |
| Bid Date | Project Number | Owner | Project Name | City County | Pba | SOL | Docs | Bid Tab | Award | Notes | |||||
| 2026/11/12 | 20261016 | Northeast Ohio Medical University | LIBRARY RENOVATION | Rootstown/Portage | SOL | DOCs | TBD | TBD |
Project Manual for
NORTHEAST OHIO
MEDICAL UNIVERSITY
Rootstown, Ohio
LIBRARY RENOVATION
PREPARED BY:
HASENSTAB ARCHITECTS, INC.
190 NORTH UNION STREET, SUITE 400
AKRON, OHIO 44304
TEL. 330.434.4464
FAX. 330.434.8546
Project No. 26028.000
Issue Date: October 16, 2026
Construction Documents
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
TABLE OF CONTENTS
Division &
Section No. Title
BIDDING DOCUMENTS
001000 Solicitation
002113 Instructions to Bidders
004113 Bid Form
004313 Bid Security Form
004513 Bidders Qualifications
CONDITIONS OF THE CONTRACT
007213 General Conditions
DIVISION 1 - GENERAL REQUIREMENTS
012500 Substitution Procedures
012600 Contract Modification Procedures
012900 Payment Procedures
Attachment - Schedule of Values Form
013300 Submittal Procedures
Attachment - Electronic File Transfer to Contractor
Attachment - Electronic File Transfer to Outside Agency
Attachment - Electronic File Transfer to Owner or Owner's Consultant
Attachment - Submittal Transmittal Form
014000 Quality Requirements
014200 References
016000 Product Requirements
017329 Cutting and Patching
DIVISION 2 - EXISTING CONDITIONS
024119 Selective Structure Demolition
DIVISION 3 - CONCRETE
Not Used
DIVISION 4 - MASONRY
Not Used
DIVISION 5 - METALS
Not Used
DIVISION 6 - WOOD AND PLASTICS
061053 Miscellaneous Rough Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
079200 Joint Sealants
DIVISION 8 - DOORS AND WINDOWS
Not Used
DIVISION 9 - FINISHES
091001 Floor Preparation
092216 Non-Structural Metal Framing
092900 Gypsum Board
095113 Acoustical Panel Ceilings
00-00/06-23
TABLE OF CONTENTS - 1
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
DIVISION 9 - FINISHES (Continued)
095434 Acoustical Baffle and Panels
096813 Tile Carpeting
099123 Interior Painting
DIVISION 10 - SPECIALTIES
102600 Wall Protection
DIVISION 11 - EQUIPMENT
Not Used
DIVISION 12 - FURNISHINGS
Not Used
DIVISION 13 - SPECIAL CONSTRUCTION
Not Used
DIVISION 14 - CONVEYING SYSTEMS
Not Used
DIVISION 21 - FIRE SUPPRESSION
Not Used
DIVISION 22 - PLUMBING
Not Used
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING
230100 General HVAC Requirements
230400 Firestopping
230513 Common Motor Requirements for HVAC Equipment
230516 Expansion Fittings and Loops for HVAC Piping
230517 Sleeves and Sleeve Seals for HVAC Piping
230519 Meters and Gauges for HVAC Piping
230523 General-Duty Valves for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment
230553 Identification for HVAC Piping and Equipment
230593 Testing, Adjusting, and Balancing for HVAC
230713 Duct Insulation
230719 HVAC Piping Insulation
230913 Instrumentation and Control Devices for HVAC
230914 Variable Frequency Drives
230923 Direct-Digital Control System for HVAC
230993 Sequence of Operation for HVAC Controls
232113 Hydronic Piping
232114 Hydronic Specialties
232123 Hydronic Pumps
232500 HVAC Water Treatment
233100 HVAC Ducts and Casings
233600 Air Terminal Units
233700 Air Outlets and Inlets
238200 Convection and Radiant Heating Units
DIVISION 26 - ELECTRICAL
Not Used
00-00/06-23
TABLE OF CONTENTS - 2
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
DIVISION 27- COMMUNICATIONS
Not Used
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Not Used
DIVISION 31 - EARTHWORK
Not Used
DIVISION 32 - EXTERIOR IMPROVEMENTS
Not Used
DIVISION 33 - UTILITIES
Not Used
END OF TABLE OF CONTENTS
00-00/06-23
TABLE OF CONTENTS - 3
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
Document 00 10 00 - Solicitation (General Contracting Project)
State of Ohio Standard Requirements for Public Facility Construction
Sealed bids will be received by:
Dale Hluch, Director
Department of Campus Operations, Door #21, Room P4
Northeast Ohio Medical University
4209 State Route 44
Rootstown, OH 44272
(southeast corner of campus - park in lot D or E)
for the following Project:
NEOMED
Library Renovation
4209 State Route 44
Rootstown, OH 44272
in accordance with the Contract Documents prepared by:
Hasenstab Architects, Inc.
190 N. Union Street, Suite 400
Akron, OH 44304
Bidders may submit requests for consideration of a proposed Substitution for a specified product, equipment, or service to the
Architect/Engineer ("A/E") no later than 10 days prior to the bid opening. Additional products, equipment, and services may
be accepted as approved Substitutions only by written Addendum.
From time to time, the Commission issues new editions of the "State of Ohio Standard Requirements for Public Facility
Construction" and may issue interim changes. Bidders must submit Bids that comply with the version of the Standard
Requirements included in the Contract Documents.
Equal Employment Opportunity requirements are applicable to this Project.
This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development
Program. A Bidder is required to submit with its Bid and with its Bidder's Qualifications form, certain information about the
certified EDGE Business Enterprise(s) participating on the Project with the Bidder. Refer to Section 6.1.11 of the Instructions
to Bidders.
The EDGE Participation Goal for the Project is 5.0 percent.
The percentage is determined by the contracted value of goods, services, materials, and labor that are provided by EDGE-
certified business(es). The participation is calculated on the total amount of each awarded contract. For more information
about EDGE, contact the Business Certification Compliance Manager at Stacy.Cornett@development.ohio.gov, or at its
physical location: 77 South High Street, 28th Floor, Columbus, Ohio 43215; or by telephone at (614) 728-0088.
The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of
the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review.
The Bidder must indicate on the Bid Form, the locations where its services will be performed in the spaces provided or by
attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the
United States and the requirements of Executive Order 2022-02D prohibiting purchases from or investment in any Russian
institution or company. Failure to do so may cause the Bid to be rejected as non-responsive.
DOMESTIC STEEL USE REQUIREMENTS AS SPECIFIED IN OHIO REVISED CODE SECTION 153.011
APPLY TO THIS PROJECT. COPIES OF OHIO REVISED CODE SECTION 153.011 CAN BE OBTAINED FROM
ANY OF THE OFFICES OF THE OHIO FACILITIES CONSTRUCTION COMMISSION.
Bidders are encouraged to be enrolled in and to be in good standing in a Drug-Free Safety Program ("DFSP") approved by
the Ohio Bureau of Workers' Compensation ("OBWC") prior to submitting a Bid and provide, on the Bid Form with its Bid,
certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP
criteria described in Section 1.6 of the General Conditions.
SOLICITATION - 001000 - 1
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
Bids will be received for:
Trade Estimate
General Contract .......................................................... $925,000
Until November 12th, 2026, at 10:00 a.m., when all Bids will be opened and read aloud.
All Bidders are strongly encouraged to attend the Pre-Bid Meeting on October 29, 2026, at 10:00 a.m. until
approximately 11:00 a.m., at the following location: Project Site.
The Contractor is responsible for scheduling the Project, coordinating the Subcontractors, and providing other services
identified in the Contract Documents.
The Contract Documents are available for purchase from SE Blueprint, Inc., 520 S. Main Street #2411, Akron, OH 44311,
tel. 330.376.1689 between the hours of 8:00 a.m. and 4:30 p.m., Monday through Friday until deadline for submitting bids at
the non-refundable cost of $50 per set, plus shipping, if requested.
The Contract Documents may be reviewed for bidding purposes without charge during business hours at the following
locations:
The Builder's Exchange, Inc. (Cleveland) Pittsburgh Builders Exchange
9555 Rockside Rd., Suite 300 1813 North Franklin Street
Valley View, Ohio 44125 Pittsburgh, Pennsylvania 15233
Phone: (216) 393-6300 Ext 39 / (866) 907-6300 Phone: (412) 922-4200
Contact: Laurel Screptock Contact: Karen Kleber
E-mail: info@bxohio.com E-mail: Karen@pghbx.org
Website: www.bxcleve.com Website: www.pghbx.org
Builder's Exchange of East Central Ohio Subcontractors Association of Northeast Ohio
5080 Aultman Road 637 Vernon Odom Blvd
North Canton, Ohio 44720 Akron, Ohio 44307
Phone: (330) 452-8039 Ext 104 Phone: (330) 762-9951 Ext 11
Contact: Heather Chapman Contact: Angela Hawk
E-mail : hchapman@mybx.org E-mail: a.hawk@saneo.com
Website: www.mybx.org Website: www.saneo.com
END OF DOCUMENT
SOLICITATION - 001000 - 2
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
Document 00 21 13 - Instructions to Bidders (General Contracting Project)
State of Ohio Standard Requirements for Public Facility Construction
TABLE OF CONTENTS
ARTICLE 1 - GENERAL INSTRUCTIONS ............................................................. 1
ARTICLE 2 - BIDDING PROCEDURES ................................................................. 1
ARTICLE 3 - BID OPENING AND EVALUATION ................................................. 5
ARTICLE 4 - WITHDRAWAL OF BID .................................................................... 8
ARTICLE 5 - BID GUARANTY AND BOND .......................................................... 9
ARTICLE 6 - CONTRACT AWARD AND EXECUTION ...................................... 10
KEYWORD INDEX ............................................................................................... 12
ARTICLE 1 - GENERAL INSTRUCTIONS
1.1 Applicable Law and Forum
1.1.1 The rights of any Bidder or any party to a subsequent Contract shall be governed by the laws of the state of Ohio
and only Ohio courts shall have jurisdiction over any action or proceeding related to the Bid or any subsequent Contract.
The Bidder irrevocably consents to such jurisdiction.
1.2 Project Scheduling and Coordination
1.2.1 When the Contract Documents refer to a period of time by a number of days, it excludes the first day and includes
the last day of the period. If the last day of the period falls on a Saturday, Sunday, or a legal holiday, that day shall be
omitted and the period shall end on the next day which is not a Saturday, Sunday, or legal holiday.
1.2.2 The time for completion of the Project indicated on the Bid Form is the time for Substantial Completion applicable
to the Bidder.
1.2.3 The State may assign all or any portion of its interest in a Contract with one or more of the successful Bidders to
another successful Bidder as an agreed condition for an award of the Contract for the respective Bid. The assignment
may include, without limitation, the duty to schedule, coordinate, and administer the Contract.
1.2.4 The Contractor is responsible for scheduling the Project, coordinating the Subcontractors, and providing other
services identified in the Contract Documents.
1.2.5 By submitting its Bid, the Bidder indicates its understanding that the Contract Sum, based on its Bid and as
amended by Change Orders, includes all costs that the Contracting Authority owes the Bidder.
1.3 Written Notice
1.3.1 Notice under the Contract Documents shall be validly given if:
1.3.1.1 delivered personally to a member of the organization for whom the notice is intended;
1.3.1.2 delivered, or sent by registered or certified mail, to the last known business address of the organization; or
1.3.1.3 sent by facsimile, email, or web-based project management software, provided the original signed document
is delivered within 3 business days after the date of the electronic transmission.
1.3.2 Notices provided to one Project Participant from another shall be simultaneously copied to the prospective Bidders,
the Owner, the Contracting Authority, and the A/E.
ARTICLE 2 - BIDDING PROCEDURES
2.1 Examination of Contract Documents and the Site
2.1.1 Before submitting a Bid, the Bidder shall examine all Contract Documents, including, but not limited to, the
Drawings, Specifications, and Addenda for all divisions of Work for the Project, noting in particular all requirements that
may affect its Work in any way.
INSTRUCTIONS TO BIDDERS - 002113 - 1
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
2.1.2 The Bidder's failure to become acquainted with the extent and nature of Work required to complete any portion of
the Work in conformity with the requirements of the Contract Documents, shall not be a basis for additional
compensation.
2.1.3 Before submitting a Bid, the Bidder should not only examine and evaluate the Site and related Project conditions
where the Work will be performed, but shall also consider when the Work will be performed including, but not limited
to, the following:
2.1.3.1 the condition, layout, and nature of the Site and surrounding area;
2.1.3.2 the availability and cost of labor;
2.1.3.3 the availability and cost of materials, supplies, and equipment;
2.1.3.4 the cost of temporary utilities required in the Bid;
2.1.3.5 the cost of any permit or license required by a local or regional authority having jurisdiction over the Project;
2.1.3.6 the usual weather conditions of the Project location;
2.1.3.7 conditions bearing upon transportation, disposal, handling, and storage of equipment, materials, and waste;
and
2.1.3.8 subsurface and concealed physical conditions and related information provided in the Contract Documents.
2.2 Pre-Bid Meeting
2.2.1 The Bidder is encouraged to attend the pre-bid meeting, where the A/E, the Contracting Authority, and the Owner
will receive questions regarding the Contract Documents. If not given in Document 00 10 00 - Solicitation, the A/E
shall issue notice of the time and place of any pre-bid meeting to each registered Plan Holder.
2.2.2 The A/E shall prepare minutes of the pre-bid meeting for the Project record. If questions raised by the prospective
Bidders require changes to, or clarifications of, the Contract Documents, the A/E shall issue the changes by written
Addendum, along with a list of pre-bid meeting attendees.
2.2.3 Additional compensation shall not be based upon the Bidder's failure to attend the pre-bid meeting, which results
in the Bidder's incomplete knowledge and familiarity of the Project requirements.
2.3 Request for Interpretation
2.3.1 If the Bidder finds any perceived ambiguity, conflict, error, omission, or discrepancy within the Contract
Documents, including the Drawings, Specifications, and Addenda, or between any of the Contract Documents and
Applicable Law, the Bidder shall submit a written Request for Interpretation ("RFI") to the A/E for an interpretation or
clarification.
2.3.1.1 The Bidder is responsible for prompt delivery of the RFI.
2.3.1.2 The A/E shall respond to RFIs received more than 7 days before the bid opening.
2.3.2 The A/E shall issue Addenda in response to RFIs that modify or clarify the Contract Documents. Any Addenda
issued within 72 hours before any bid opening (excluding Saturdays, Sundays, and legal holidays) shall extend the bid
opening date by 7 days pursuant to Section 3.3.1.
2.3.2.1 The Addenda may be delivered via facsimile or e-mail, posted to a web or FTP site, or otherwise furnished to
each registered Plan Holder.
2.3.3 Any interpretation or clarification of the Contract Documents made by any Person other than the A/E, in any
manner other than a written Addendum, shall not be binding, and the Bidder shall not rely upon the interpretation or
clarification.
2.3.4 The successful Bidder shall not be compensated for a claim alleging insufficient data, incomplete, ambiguous,
conflicting, or erroneous Contract Documents or proposed Contract Documents, or assumed conditions regarding the
nature, extent, or character of the Work, if the Bidder did not submit a related RFI prior to the bid opening.
2.4 Basis of Design and Acceptable Components
2.4.1 The Contract Documents may list components produced by specific manufacturers to denote kind, quality, or
performance requirements.
INSTRUCTIONS TO BIDDERS - 002113 - 2
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
2.4.2 The component listed first is the Basis of Design Component.
2.4.3 Other listed components are Acceptable Components.
2.4.3.1 If the Bidder includes an Acceptable Component in its Bid, the Bidder is responsible for the costs of
coordination and modification required.
2.5 Substitutions Prior to Bid Opening
2.5.1 If the Bidder proposes to use an article, device, material, equipment, form of construction, fixture, or item other
than the Basis of Design or Acceptable Components named in the Specifications, the Bidder shall certify that the
proposed item is equal in quality and all aspects of performance and appearance, to the item specified.
2.5.1.1 If approval of a Substitution requires changes to the Contract Documents or affects the work of other trades,
the Bidder is responsible for the additional costs, including, but not limited to, changes to the design by the A/E.
2.5.2 The Bidder shall submit its request for Substitution to the A/E no later than 10 days prior to the bid opening, which
must include:
2.5.2.1 the name and complete description of the proposed Substitution, including Drawings, performance and test
data, and other information necessary for a complete evaluation; and
2.5.2.2 a statement setting forth any changes that the Proposed Substitution will require in the Contract Documents
or the Project.
2.5.3 If the A/E approves the Proposed Substitution, the A/E shall issue an Addendum.
2.5.4 If the A/E does not approve the Proposed Substitution, the A/E shall inform the Bidder of its decision, which is
final. The A/E may reject a proposed Substitution because the Bidder failed to provide sufficient information to enable
the A/E to completely evaluate the Proposed Substitution without causing a delay in the scheduled bid opening.
2.5.5 Proposed Substitutions received by the A/E less than 10 days prior to the bid opening shall not be considered.
2.6 Bid Form
2.6.1 Each Bid shall be submitted on the Bid Form and sealed in an envelope clearly marked as containing a Bid,
indicating the Contracting Authority's Project number and name, and the date and time of the bid opening on the
envelope. Refer to Section 3.1.2 for requirements related to envelope markings.
2.6.1.1 Any change, alteration, omission, or addition in the wording of the Bid Form shall cause the Bid to be
rejected as non-responsive.
2.6.1.2 All pages of the Bid Form, including a completed "Bidder Affirmation and Disclosure" page acknowledging
that the Bidder affirms, understands, and will abide by the requirements of Executive Order 2019-12D related to
providing services only within the United States and Executive Order 2022-02D prohibiting purchases from or
investment in any Russian institution or company, and a completed "Commitment to Participate in the EDGE
Business Assistance Program" page, shall be submitted with the Bid. Failure to do so may cause the Bid to be
rejected as non-responsive.
.1 If the names, locations, and service locations of Subcontractors are not known at the time of the Bid
Opening, the Bidder must provide the information requested with its Subcontractor and Material Supplier
Declaration form.
2.6.1.3 Unless the Bidder withdraws the Bid as provided in Article 4, the Bidder is required to comply with all
requirements of the Contract Documents, regardless of whether the Bidder had actual knowledge of the
requirements and regardless of any statement or omission made by the Bidder that might indicate a contrary
intention.
2.6.2 The Bidder shall fill in all relevant blank spaces on the Bid Form by printing in ink or by typewriting, and not in
pencil.
2.6.2.1 The Bidder shall show all bid amounts in both words and figures. In the case of a conflict between the words
and figures, the amount shown in words shall govern, where the words are not ambiguous. When the Bidder's
intention and the meaning of the words are clear, omissions, or misspellings of words shall not render the words
ambiguous.
2.6.2.2 The Bidder shall initial alteration or erasure of items filled in on the Bid Form.
INSTRUCTIONS TO BIDDERS - 002113 - 3
Northeast Ohio Medical University 26028.000
Library Renovation Construction Documents
2.6.3 If the Bidder is a corporation, partnership, or sole proprietorship, an officer, partner or principal of the Bidder
shall print or type the legal name of the Bidder on the line provided, and sign the Bid Form. If the Bidder is a joint
venture, an officer, partner or principal, as applicable, of each member of the joint venture shall print or type the
legal name of the applicable member on the line provided, and sign the Bid Form on behalf of that
member. All signatures must be original.
2.7 Allowances
2.7.1 If Allowances are provided on the Bid Form, the amount of each Allowance shall be included in the Base Bid
amount. Allowances shall be used solely for the purpose of determining the adjustment to the Contract Sum for the
difference between the amount of the Allowance and the actual cost of the related Work provided. Allowances shall not
include the Contractor's Fee.
2.8 Unit Prices
2.8.1 If Unit Prices are requested on the Bid Form, the amount of the scheduled quantities shall be included in the Base
Bid amount. Unit prices shall be used solely for the purpose of determining the adjustment to the Contract Sum for the
difference between the estimated quantities on the Bid Form and the actual quantities provided.
2.8.2 Unit Prices shall include all materials, equipment, labor, delivery, installation, and any other cost or expense, in
connection with, or incidental to, the performance of that portion of the Work. Unit Prices shall not include the
Contractor's Fee on account of the associated Unit Price Work. The Bidder shall submit Unit Prices for all items listed.
2.9 Alternates
2.9.1 If an Alternate is listed on the Bid Form, the Bidder shall fill in the applicable blank with an increased or decreased
bid amount and indicate which by circling the word "ADD" or the word "DEDUCT" as applicable. The Contracting
Authority reserves the right to accept or reject any or all bid amounts for Alternates, in whole or in part, and in any order.
2.9.1.1 If no change in the bid amount is required, indicate "No Change" or "$0."
2.9.1.2 Failure to make an entry or an entry of "No Bid," "N/A," or similar entry on any Alternate shall cause the
Bid to be rejected as non-responsive if that Alternate is selected.
2.9.1.3 Failure to indicate a negative number by circling "DEDUCT," preceding the number by a minus sign, or
enclosing the number in parentheses will indicate the Bidder's intent to increase the Base Bid by the amount entered
in the applicable blank.
2.9.1.4 If an Alternate is not selected, an entry as listed in Section 2.9.1.2 on that Alternate shall not, by itself,
render a Bid non-responsive.
2.10 Submittals with Bid Form
2.10.1 The Contracting Authority shall reject a Bid as non-responsive if the Bidder fails to submit the following with the
Bid Form in a sealed envelope:
2.10.1.1 A Bid Guaranty as provided in Article 5, meeting the requirements of Ohio Revised Code ("ORC")
Sections 153.54 and 153.571.
2.10.2 If the apparent low Bidder does not submit a valid Power of Attorney of the agent signing for the Surety with its
Bid, the Contracting Authority shall direct the apparent low Bidder to deliver a valid and appropriate Power of Attorney
to the Contracting Authority within a period determined by the Contracting Authority. The Contracting Authority shall
not enter into a Contract without a valid Power of Attorney.
2.10.3 The Bidder is encouraged to submit background information with its Bid using the Bidder's Qualifications form
and including, but not limited to, the information listed in this Section 2.10. If the apparent low Bidder does not submit
the Bidder's Qualifications form and related information with its Bid, the Bidder shall provide it upon request in
accordance with Section 3.5.4, including, but not limited to:
2.10.3.1 the overall experience of the Bidder, including number of years in business under present and former
business names;
2.10.3.2 a complete listing of all the Bidder's ongoing construction projects and a listing of construction projects
which are similar in cost and type to the Project completed by the Bidder in the last 5 years. Include information of
the scope of work and value of each contract, a description of Encouraging Diversity Growth and Equity ("EDGE")
INSTRUCTIONS TO BIDDERS - 002113 - 4

With GovernmentContracts, you can:
Project ID: GD 26-53 Title: Maintenance Facility Painting Project Addenda: 0 Release Date:
Greater Dayton Regional Transit Authority
Bid Due: 12/01/2026
OWP - Knox 10 October 16, 2026 | ODNR Project Name Knox 10
State of Ohio - Department of Natural Resources
Bid Due: 11/19/2026
DCS 2027 Roof Replacement at Wright Elementary Schools Bids are due at or
Dublin City Schools
Bid Due: 11/17/2026
Bid Title: City of Gahanna's Urban Forestry Master Plan Category: Request for Proposals
City of Gahanna
Bid Due: 11/20/2026