| Location: | Georgia |
|---|---|
| Posted: | Feb 5, 2025 |
| Due: | Mar 5, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-67500-NONST-2025-000000086 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-67500-NONST-2025-000000086 | BID #25-51, Drainage Improvements at Stokes Drive | Henry County Board Of Commissioners |
Feb 05, 2025 @ 04:08 PM
|
Mar 05, 2025 @ 03:00 PM
|
Start Date: Feb 05, 2025 @ 04:08 PM ET
End Date:
Mar 05, 2025 @ 03:00 PM ET
The intent of this invitation is to obtain competitive sealed bids from qualified vendors for installation of stormwater improvements located at 170 Stokes Drive. The Contractor shall furnish all labor, materials, equipment, and services required to fulfill the terms and conditions of this bid. Bids will only be considered by those bidders and subcontractors currently pre-qualified with the Georgia Department of Transportation.
Sealed bids will be accepted until 3:00 PM local time on March 5, 2025. Late bids will not be considered nor returned. Bids submitted by mail, common carrier or delivered in person will be received by Henry County, Purchasing Department, located at 140 Henry Parkway, McDonough, GA 30253. Electronic bids are to be submitted through the County¿s eProcurement Portal at (https://procurement.opengov.com/portal/henryga). Emailed or faxed bids will not be considered.
Bids may not be withdrawn for sixty (60) days after the time and date set for closing, except as allowed by OCGA. Henry County reserves the right to reject any and all proposals and to waive any technicalities.
| Code | Description |
| 98852 | Landscaping, Including Design, Fertilizing, Planting, etc., Not Grounds Maintenance or Tree Trimming |
| 98814 | Erosion Control Services |
| 96884 | Traffic Control Services, Including Placement and Removal of Control Devices |
| 91381 | Maintenance and Repair, Sewer and Storm Drain, Including Removal |
| 91223 | Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. |
Dana Holder
purchasing@co.henry.ga.us
7702886027

With GovernmentContracts, you can:
...91187 Storm Drainage 91345 Construction, Sewer and Storm Drain 91381 Maintenance and Repair, ...
State Government of Georgia
Bid Due: 6/26/2026
...Maintenance and Repair Services 91345 Construction, Sewer and Storm Drain 91381 Maintenance and ...
State Government of Georgia
Bid Due: 6/23/2026
...Projects 91345 Construction, Sewer and Storm Drain 91356 Construction, Utility and Underground... and ...
State Government of Georgia
Bid Due: 6/25/2026
...Engineering 91356 Construction, Utility and Underground Projects 91345 Construction, Sewer and Storm... Drain ...
State Government of Georgia
Bid Due: 7/07/2026