Sealed bids for Lake Saint Louis Boulevard Widening and Resuracing Phase 1 Improvements Project, STP-5418(625) , will be received at: 200 Civic Center Drive, Lake Saint Louis MO 63367
until 12:00 Noon (Prevailing Local Time) on the _23rd__day of September, 2026 at the office of the Lake Saint Louis City Clerk__ , and will be publicly opened and read at 2:00 P.M or soon thereafter on the same day. All bids shall be submitted in triplicate with “Bid No 04-26 Technology Drive Improvement Project” clearly labeled on envelope.
The Scope of Work shall includes widening and resurfacing, sidewalk and shared use path
reconstruction along Lake Saint Louis Boulevard from just north of Freymuth Road to just south of
Hawk Ridge Circle South, a distance of approximately 2,065 feet. The scope of the project includes
the milling and resurfacing, pavement widening, storm sewer and inlets, medians, removal and
replacement of concrete sidewalk and shared use path, new curb ramps, truncated domes, and
striping.
Plans and specifications are now on file and can be viewed at
https://planroom.drexeltech.com/View/Default.aspx
. Plans and specifications can be downloaded or ordered from this site for the fee listed online. Drexel Technologies, 135A Weldon Parkway, Maryland Heights, MO 63043, phone 314.872.0900.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.
The City of Lake Saint Louis hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.”
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The City of Lake Saint Louis reserves the right to reject any or all bids.
The DBE Goal for this project is 0%.
No 2
nd
tier subcontracting will be allowed on this project.