| Location: | New York |
|---|---|
| Posted: | Mar 26, 2025 |
| Due: | Apr 17, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description:
Dishwasher Modifications at Student Union Building, Terrace Restaurant & Element 93 SUNY Project No. 25:01P
The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor, and incidentals necessary or convenient for the construction of Project Number 25:01P, titled Dishwasher Modifications at Student Union Building, Terrace Restaurant, and Element 93 and carry out all duties and obligations imposed upon the contractor by the Contract Documents to support the new kitchen renovations which involves some Hazmat, Architectural, Plumbing and Electrical systems modifications and see below for details.
The main features of the work shall include, but not be limited to the following:
Mechanical/Plumbing Scope: Student Union Removals: Disconnect existing dishwasher and sink indirect connection to existing floor drain including removal of existing floor drain along with removal of existing 3/4"HW and CW to dishwasher and sink. Work also includes removal of existing ductwork/hood over existing dishwasher. New Work: Provide new floor sink along with drain piping from dishwasher to floor sink and new HW and CW piping from existing riser taps to dishwasher. Works also includes new duct connection from dishwasher to existing ductwork directly above dishwasher.
Terrace: Removals: Disconnect existing dishwasher from existing domestic water piping and indirect Sanitary connection to existing floor sink. New Work: Provide new drain piping from dishwasher to existing floor sink and reconnect into existing HW and CW piping. Work also includes connection of adaptor exhaust hood into existing hood to allow extension of coverage over dishwasher.
Wooster Café: Removals: Disconnect existing dishwasher from existing domestic water piping and indirect Sanitary connection to existing floor sink. New Work: Provide new drain piping from dishwasher to existing floor sink and reconnect into existing HW and CW piping.
General Note: Coordinate all removals of existing dishwasher and other equipment noted on the drawings work with the college and campus auxiliary services before any work begins.
All work shall be completed in accordance with applicable manufacturer’s materials standards; applicable NYSDOT Standards, NY State Building Code requirements, and applicable Federal & State regulations (see Section C.34 – Code Requirements for additional requirements).
Work not included in the work of the Contract are those items marked "N.I.C"; movable furnishings, except those specifically specified or indicated on the Drawings; and items marked "by others".
Work not included in the work of the Contract shall be coordinated with the college, and shall include the work listed below, but not be limited to the following:
No Alternates. Due Date: 04/17/2025 2:00 PM Contract Term: Single Occurrence Location: SUNY New Paltz Ad Type: General
|

With GovernmentContracts, you can:
...23 Title: Dishwasher - Conveyor Type CR#: 2135126 Agency: State University of New ...
The New York State Contract Reporter
Bid Due: 6/05/2026