PROJECT DESCRIPTION: The Project generally consists of, but is not limited to, the following: Influent Structure with a mechanical screening system; a new Master Lift Station; EQ basins and associated mixers; EQ basin pump station; BNR Treatment System consisting of primary anoxic, aerobic, deoxygenation, and secondary anoxic basins; a common reaeration basin; BNR equipment; blowers, air piping and diffusers; submersible mixers; flow metering systems; secondary clarifier flow splitter box; two new secondary clarifiers and associated equipment; RAS/WAS pumping station; chemical storage, feed and pumping systems; a tertiary filtration (disc filters) system; a multi-compartment chlorine contact chamber (CCC); modifications to the existing aerobic digestion system; dechlorination structure; Electrical Building No. 1; electrical, controls, instrumentation and SCADA system improvements; site work; yard piping; stormwater management system improvements; plant internal roadway improvements; miscellaneous appurtenances and ancillaries; and various other site improvements.
Publication Date/Time:
3/6/2025 6:00 am
Publication Information:
Daytona Beach News Journal
Closing Date/Time:
5/29/2025 2:00 pm
Submittal Information:
Penny Overstreet, City Clerk 105 S. 2nd Street Flagler Beach, Florida 32136
Bid Opening Information:
2:00 PM, May 29, 2025
Addendum Date/Time:
05/15/2025
Pre-bid Meeting:
10:00 A.M. March 20, 2025
Contact Person:
Penny Overstreet, City Clerk
poverstreet@cityofflaglerbeach.com
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.