REHABILITATION OF MARSHALL FLOOD CONTROL WORK
| Location: |
Federal |
| Posted: |
Apr 6, 2026 |
| Due: |
Apr 10, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
W912ES26BA006 |
| Publication URL: |
To access bid details, please log in. |
REHABILITATION OF MARSHALL FLOOD CONTROL WORK
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION MISSISSIPPI VALLEY
Sub Command 2
ENDIST ST PAUL
Office
W07V ENDIST ST PAUL
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Apr 06, 2026 11:28 am CDT
-
Original Published Date: Mar 11, 2026 11:56 am CDT
-
Updated Date Offers Due: Apr 10, 2026 02:00 pm CDT
-
Original Date Offers Due: Apr 10, 2026 02:00 pm CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: May 29, 2026
-
Original Inactive Date:
May 29, 2026
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
-
Product Service Code: Z1QA - MAINTENANCE OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
-
NAICS Code:
-
237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Description
Marshall Flood Control Rehabilitation project to repair the existing levee at 2 locations within the city limits of Marshall, Minnesota (LyonCounty).Work includes but is not limited to minor clearing and tree removal, excavation, riprap and bedding placement, and turf restoration.The North American Industry Classification System (NAICS) code for this action is 237990; Other Heavy and Civil Engineering Construction with a small business size standard of $45,000,000.THIS SOLICITATION IS ISSUED AS AN INVITATION FOR BID (IFB) IN ACCORDANCE WITH FAR PART 14 SEALED BIDDING PROCEDURES. This procurement is set-aside 100% for small business concerns.The estimated magnitude of construction is between $500,000 and $1,000,000.PAYMENT AND PERFORMANCE PROTECTION ARE REQUIRED IN ACCORDANCE WITH FAR PART 28
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING DIVISION 332 MINNESOTA STREET SUITE 1500
-
SAINT PAUL , MN 55101-1323
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...excavation, backfill and site restoration for existing underground piping replacement) Seismic... include but ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/15/2026
...Mead National Recreation Area. The work to construct this facility includes excavation, grading...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/24/2026
.... Filling in of the property shall be done by filling in the ...
MPN
Bid Due: 12/19/2078
...in the excavation with clean sand only free of debris, foreign materials, etc., ...
MPN
Bid Due: 10/17/2070
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.