Project Type: Â Request for Qualifications Construction Manager at Risk
Project Number: H59-6379-AT
Project Name: MTC - New Welding Building - Airport
Description of Project/Professional Services: The New Welding Building on the Airport Campus will be a 24,000 square foot facility constructed adjacent to the current Welding Building. 4,000 square feet of the building will be used as a flex space, space that other programs could use, or additional instructional space for the Welding Program. The new facility will house 70 student welding booths, four classrooms, four offices, a shop area, and a tool storage area.
Agency Contract Coordinator: Tommy Wise | Telephone: 803.707.0479 | email: franklintwise@midlandstech.edu
Submittal Due Date: 07/16/2026 at 2:00 pm
Attachments:
SE-410:
H59-6379-AT--SE-410.pdf
Request for Qualifications:
H59-6379-AT--RFQ.pdf
Midlands Technical College
Request for Qualifications
Construction Management-at-Risk
MTC - New Welding Building
State Project # H59-6379-AT
April 29,2026
It is the intention of the Midlands Technical College to select a Construction Manager at Risk (CM-R) to provide
comprehensive pre-construction and construction services for the new Welding Building.
1. PROJECT OVERVIEW
A. The proposed building will be on the MTC Airport Campus. The 24,000 square foot building will be constructed
adjacent to the current Welding Building. 4,000 square feet of the new building will be used as flex space, space
that other programs could use or additional instruction space for the Welding Program. The new facility will house
70 student welding booths, four classroom, four offices, a shop area and tool storage
B. The selection of the CM-R will comply with the guidelines of the South Carolina Procurement Code and
Regulations, including the Office of State Engineer (OSE) RFP Handbook and the Manual for Planning and
Execution of State Permanent Improvements - Part II (OSE Manual). The overall procurement will be a two-step
process consisting of a Request for Qualifications (RFQ) followed by a Request for Proposals (RFP). In the first
step (RFQ), qualifications alone will narrow the field to a short-list of firms who will be invited to respond to the
RFP.
C. In selecting a firm, the College will place great emphasis on the experience of the firm and assigned personnel in
providing similar services on projects of similar magnitude and scope as the New Classroom and Office building
construction. Selection preference will be toward firms that have a demonstrated depth of knowledge and
resources in the successful application of principles of CM-R and general contracting, scheduling, contract
coordination and compliance, budget control, familiarity with Federal, State, County, and City laws, ordinances,
and codes. Small and minority business enterprises as certified by the South Carolina Division of Small and
Minority Contracting and Certification (formerly OSMBA) are encouraged to respond to this request.
Contact: South Carolina Division of Small and Minority Contracting and Certification
1205 Pendleton Street
Suite 453-C
Columbia, SC 29201
Phone 803-734-5010
D. Submittal and Project Schedule
1) Request for Qualifications Due ........................................................................................................ July 16,2026
2) Short-list of firms announced ........................................................................................................... July 31,2026
3) Pre-proposal conference and site tour (mandatory) ................................................................... August 12, 2026
4) Technical Proposals (RFP) from short-listed firms due .......................................................... September 9, 2026
5) Interviews, Cost Proposals and final ranking of short-listed firms ....................................... September 17, 2026
6) Negotiations conclude ....................................................................................... No later than November 1, 2026
2. PROJECT CONSTRAINTS
A. It is desired to start design of the building in the fall of 2026 with construction starting in the spring of 2027 and
completion of the building in the spring of 2028. Due to the desired construction schedule, the College intends to
assess liquidated damages for failure to meet the contract substantial completion date. This project carries the
challenges of working on an active campus, new construction in a tight and wooded site, and unknown site
conditions, which will require detailed coordination and a demanding and intense timeline.
1
B. Additionally, it is desired to include small, minority and women owned business enterprises on the construction
team. This will likely require segments of the construction scope to be organized into smaller pieces and a highly
experienced CM-R firm familiar with the availability and capacity of these entities is best positioned to
accomplish this goal. The CM-R will be expected to work closely with the College and/or its assigned agents, to
develop final documents and separate bid packages as required by the approved project master schedule.
3. DESCRIPTION OF SERVICES TO BE ACQUIRED
A. The CM-R will provide a broad range of design support and construction services including, but not limited to:
schedule and constructability reviews; value engineering (VE); identification of alternatives in project delivery
phasing and early bid packages; prequalification of trade subcontractors; preliminary pricing of general conditions
and site services, and the administration of general and trade contracts. These activities will first support the
development of an overall Total Project Cost and Baseline Schedule. The CM-R will then assist the College and
Designer in the development of a final Maximum Allowable Construction Cost (MACC) and Project Construction
Schedule as the construction documents prepared by the design team reach a point for final pricing near the end of
the design phase.
B. The CM-R will be contracted to proceed with execution of the project by bidding and managing the general and
trade contracts and to assume responsibility for project coordination and construction at a Guaranteed Maximum
Price (GMP), which will become a contractual obligation. The CM-R will also develop a Construction Master
Schedule, which will also become a contractual obligation. The CM-R will be responsible for the coordination
and construction of the entire project, including management and coordination of all trade contracts, subcontracts,
shop drawings, change orders, punch lists, and Owner Furnished Equipment. The CM-R will also be responsible
for delivery of record drawings, O & M manuals and warranties. The project will be subject to all third party
inspections required by the State Engineer.
C. The CM-R shall generally provide the complete scope of services outlined in the AIA A133-2009 and SCOSE
A201-2007. Should the project execution plan require the project to proceed utilizing a multi-staged guaranteed
maximum price (GMP), it is expected that the CM-R's services will be executed seamlessly based on
appropriately executed amendments to the contract.
D. Preconstruction Services: Preconstruction Services include, but are not limited to:
1) Project Management
a) Establish a Construction Management Plan
b) Project Conference
c) Design Phase Information
d) Progress Meetings
e) Review of Design Documents
f) Provide Constructability and Efficiency Recommendations to the Design Team
g) Participate in College Design Reviews
h) Public Relations
i) Project Funding/Budgeting
2) Time Management
a) Revisions to Baseline Schedule
b) Preconstruction (Design Phase) Milestone Schedule
c) Monitoring Design Phase Milestone Schedule
d) Pre-Bid Construction Schedules
3) Cost Management
a) Cost Control & Estimating Services
b) Revisions to Project and Construction Budget
c) Value Engineering Studies
4) Management Information System (MIS)
a) Schedule Reports
b) Project Cost Reports
c) Cash Flow Reports
d) Design Phase Change Order Reports
E. Construction Buy Out Services: These services are all services related to the actual procurement of construction
related activities. As outlined in AIA A133-2009 and SCOSE A201-2007, the CM-R will be responsible for all
services related to this phase including but not limited to:
1) Project Management
a) Vendor Outreach Campaign
b) Prequalifying Bidders
2
c) Delivery of Bid Documents
d) Pre-Bid Conferences
e) Information to Bidders
f) Addenda
g) Bid Opening
h) Construction Contracts
i) Permits, Insurance and Labor Affidavits
j) Development of the Maximum Allowable Construction Cost (MACC) and the Guaranteed Maximum
Price (GMP)
2) Time Management
a) Pre-Bid Construction Schedule
b) Contractor's Construction Schedule
3) Cost Management
a) Estimates for Addenda
b) Analyzing Bids
c) Trade Contract Award
4) Management Information System (MIS)
a) Schedule Maintenance Reports
b) Project Cost Reports
c) Cash Flow Reports
F. Construction Services: The CM-R will be responsible for the coordination and construction of the entire project.
The College and the Design Team will routinely review construction progress to protect the College's interests and
to validate pay applications. The CM-R will provide the following construction phase services, including but not
limited to:
1) Project Management
a) Pre-Construction Conference
b) Onsite Management / Construction Phase Communication Procedures
c) Contract Administration Procedures
d) Project Site Meetings
e) Coordination of Other Independent Consultants
f) Review of Requests for Changes to Contract Time / Price
g) Quality Review
h) Operation & Maintenance Materials
i) Substantial Completion
j) Final Completion
2) Time Management
a) Master Baseline Schedule
b) Contractor's Construction Schedule
c) Construction Schedule Report
d) Review of Time Extension Requests
e) Recovery Schedules
f) Project Closeout Schedule
3) Cost Management
a) Contractor Schedule of Values
b) Allocation of Costs to Contractor's Construction Schedule
c) Change Order Control
d) Cost Records
e) Trade-Off Studies
f) Progress Payments
4) Management Information System (MIS)
a) Schedule Maintenance Reports
b) Project Cost Reports
c) Revisions to Project & Construction Budget
d) Cash Flow Reports
e) Contractor Progress Payment Reports
f) Change Order Reports
G. Post-Construction Services: Following construction, the CM-R shall be responsible for project closeout and
documentation, including but not limited to:
1) Project Management
a) Record Documents
3
b) Organize / Index Operations & Maintenance Materials
c) Occupancy Permit
d) Warranty Services
2) Time Management
a) Occupancy Plan
3) Cost Management
a) Change Orders
4) Management Information System (MIS)
a) Close-Out Reports
b) MIS Reports for Move-In & Occupancy including move management
4. DEFINITIONS
For the purposes of this solicitation the following definitions apply:
A. Total Project Cost: The sum of all charges to the project funding account, including the following major cost
elements:
* Owner's Furnishings, Fixtures and Equipment
* Other Owner Costs (design fees, field investigations, inspections, etc.)
* Owner's Overall Project Contingency
* Design Phase Contingency (Owner-controlled) and Owner's Contingency
* Total Construction Cost
B. Total Construction Cost (TCC): The negotiated sum of all direct and indirect charges for project construction,
including the following major cost elements. This amount must be fully bonded as a contractual obligation.
* General Conditions Cost
* CM-R Costs and Fees (both preconstruction and construction)
* Maximum Allowable Construction Cost including Contractor's Construction Contingency
C. Maximum Allowable Construction Cost (MACC): A negotiated amount that includes the following elements. This
amount will be a contractual obligation.
* Cost of the Construction (the Construction Buy-Out)
* Buy-Out Contingency (unspent Buy-Out Contingency reverts to the Owner at the conclusion of the Buy-Out
phase)
* Construction Contingency (unspent Construction Contingency reverts to the Owner at Substantial
Completion)
D. Guaranteed Maximum Price (GMP): The MACC less the unspent Buy-Out Contingency.
5. SUBMITTAL CONDITIONS AND GENERAL INSTRUCTIONS
A. Conditions
1) The College makes no guarantee that an award will be made as a result of the RFQ, and reserves the right to
accept or reject any or all submittals; waive any informalities, irregularities or minor technical inconsistencies;
or delete any item or requirement from this RFQ or any resultant contract when deemed to be in the College's
best interest. Any and all representations made within a Statement of Qualification shall be binding on the
Respondent.
2) The College is not obligated to request clarifications or additional information but may do so at its discretion.
The College reserves the right to extend the deadline for submittals.
3) Upon receipt of a Statement of Qualifications by the College, the submission shall become the property of the
College without compensation to Respondent for disposition or usage by the College at its discretion. Subject
to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until
final award.
4) The College assumes no responsibility or obligation to the Respondents and will make no payment for any
costs associated with the preparation or submission of responses to this solicitation.
5) During the performance of any contract resulting from this solicitation, the CM-R agrees as follows: The
CM-R will not discriminate against any employee or applicant for employment because of race, creed, color,
sex, age, national origin, place of birth, or physical handicap. CM-R must have a history of being non-
discriminating and will not discriminate on the basis of race, creed, color, sex, or national origin in any of its
employment practices, or procurement practices with respect to the work force of the firm, or procurement
services in connection with this project. An affirmative action plan must be maintained for both work force
and procurement practices.
6) Failure to comply with all requirements contained in this RFQ may result in rejection of the submission and
disqualification from further consideration.
4
B. General Instructions
1) Respondents shall carefully read the information contained in this RFQ and submit a complete response to all
requirements and questions as directed. Incomplete Statements of Qualifications will be considered non-
responsive and subject to rejection. Please indicate, by firm name, those certified by the Governor's Office of
Small and Minority Business Assistance.
2) Only individual firms or formal joint ventures may apply. Two or more firms may not apply as a team unless
they have formed a formal joint venture. Any associations will be disqualified. This does not preclude a
Respondent from having sub-consultants.
a) "Prime-Sub" teams are bound by the requirements and limitations of this solicitation. Each firm must
describe its experience and qualifications within the overall page limit.
b) For joint venture entities that have not completed at least two relevant projects as a joint venture, each
firm should submit its qualifications separately within the overall page limit.
3) Submission of a Statement of Qualifications indicates the Respondent's acceptance of the evaluation
techniques and a recognition that subjective judgments must be made by the College during the evaluation
process.
4) Except for the submission of clarification questions as discussed herein Respondents shall not contact any
members or employees of the College, the Office of State Engineer, or the Design Team regarding any aspect
of this procurement until after the award of the contract. Contact with the organizations mentioned above
could be grounds for elimination.
5) Questions relating to the RFQ may be asked at any time up to the deadline set forth in the published
advertisement.
6) It is the responsibility of each Respondent to examine the entire RFQ; to seek clarification in writing; and to
review its submittal for accuracy before submitting the document. Once the submission deadline has passed,
all submissions will be final. The College may, in its sole discretion, request clarification from any individual
Respondent relative to their submission, and reserves the right to ask for additional information from all
parties that have submitted qualification statements.
7) Any clarifications or interpretations of this RFQ that materially affect or change its requirements will be
addressed by formal addendum. It is the responsibility of all respondents to obtain this information in a
timely manner. All such addenda issued by the College before the proposals are due are part of the RFQ, and
respondents shall acknowledge receipt of and incorporate each addendum in its Statement of Qualifications.
a) Questions must be submitted no less than seven (7) days prior to the date of submission of the Statements
of Qualifications. All questions must be submitted in writing (by email is acceptable) to the Procurement
Officer listed below.
b) Respondents shall consider as binding only those clarifications and interpretations that the College issues
by addenda five (5) days prior to the submittal deadline. Interpretations or clarifications in any other
form, including oral statements, will not be binding on the College and should not be relied on in
preparing Statements of Qualifications.
8) Statements of Qualifications shall not include any information regarding Respondent's fees, pricing, or other
compensation. Inclusion of such information shall result in disqualification from further consideration. Such
information will be solicited from firms qualified by the College to participate in step two of the selection
process.
6. SPECIFIC SUBMITTAL INSTRUCTIONS
A. The College will receive Statements of Qualification at the time and location given below:
1) Date and Time as specified in the advertisement in South Carolina Business Opportunities.
2) Midlands Technical College
Operations Building
1260 Lexington Dr.
West Columbia, SC 29170
B. The College designates the following person, as its representative and Point-of-Contact for this RFQ. Respondents
shall restrict all contact with the Owner and direct all questions regarding this RFQ, including questions regarding
terms and conditions, to the Point-of-Contact person.
Tommy Wise, Associate Director of Construction and Planning
Midlands Technical College
Operations Building
1260 Lexington Dr.
West Columbia, SC 29170
Phone: 803-822-6757
Email: franklintwise@midlandstech.edu
5
C. Submittal Format
1) Submittals shall be printed on letter-size (8-1/2" x 11") paper and assembled with spiral-type bindings. DO
NOT USE METAL-RING HARD COVER BINDERS.
2) Submittals shall be a MAXIMUM OF FIFTY (50) PRINTED PAGES. Sheets may be single or double-sided.
Fold-outs up to 11" x 17" are acceptable, but will count as two (2) pages. Fonts shall be a minimum of 10
point.
3) Number each side of a printed page consecutively, including the Letter of Interest, brochures, licenses,
resumes, supplemental information, etc. The covers, table of contents and divider sheets do not count as
printed pages, provided no additional information is included on those pages. Provide the number of copies
specified in the advertisement. Any submittals exceeding the 50-page limit will be disqualified.
4) The front cover must clearly identify the Project Name, Project Number, the Date of Submission and the
Name of Respondent.
5) Separate and identify each criteria response by use of a divider sheet with an integral tab identified as follows:
Letter of Interest
Response to Prerequisite Criteria
Financial Information
Location of Project Office
Personnel Resources
General CM-R Experience
Specific Project Experience.
Statement of Why Firm Should Be Selected
6) When a criterion defines a specific number of items (e.g., number of projects) to be listed or described, then
only that number of items shall be provided.
7. RESPONSES TO CRITERIA
A. Letter of Interest
1) Basic company information
Company name
Address & Zip code
Name of primary contact
Telephone number
Fax number
Email address
South Carolina Construction-Manager License Number
South Carolina General Contractor License Number
2) Form of ownership, including state of residency or incorporation-Is the offeror a sole proprietorship,
partnership, corporation, Limited Liability Corporation (LLC), joint venture, or other structure?
3) Succinctly describe the history and growth of your firm.
4) State the number of years your firm has been providing CM-R services and General Contracting services.
5) If other than the home office, identify the branch office responsible for the performance of the services
requested and its proximity to the project site.
6) Provide a statement of disclosure, which will allow the College to evaluate possible conflicts of interest. This
disclosure requirement is not about giving the College permission regarding us contacting your references. It
is about revealing relationships that your company may have with persons not of your company who are
directly involved in the decision-making regarding this project. If your company has no conflicts of interest,
your statement should affirm that as fact, and you may do so succinctly. The signer of this statement of
disclosure should anticipate the following pledge that will be required by the CM Contract:
"The CM-R covenants that it currently has no interest and shall not acquire any interest, direct or indirect,
that would conflict in any manner or degree with the performance required under this Contract. The CM-
R further covenants that, in the performance of this Contract, it shall not employ or contract with any
person whose employment or contracting would create a conflict of interest."
7) Provide the following certification and acknowledgement statement.
"The undersigned hereby affirms that regarding information furnished by the applicant herewith, and as
may be provided subsequently (including information presented at interview, if a finalist):
All information of a factual nature is certified to be true and accurate.
All statements of intent or proposed future action (including the assignment of personnel and the
provision of services) are commitments that will be honored by the applicant if awarded the contract.
6
It is acknowledged that:
If any information provided by the applicant is found to be, in the opinion of the Selection
Committee or the State of South Carolina, substantially unreliable, this application may be rejected.
The Selection Committee may reject all applicants and may stop the selection process at any time.
The selection of finalists for proposal and interview will be made on the basis of information
provided herein, including the results of the reference checks."
8) Provide notarized signature of Corporate Executive or equivalent with authority to bind the firm to its
submission.
B. Response to Prerequisite Criteria
Provide documents, including affidavits from insurance and surety agents attesting to your firm's compliance with
the prerequisite criteria listed below.
C. Financial Information
If the firm has multiple offices, the qualification statement should include financial information about the parent
company and branch office separately. Parent company (or general office) financial information as totals will be
acceptable if "parent" (or general office) means that it is financially responsible for the liabilities of the branch
office.
1) List your total annual billings for each of the past five (5) calendar years.
2) Has the firm ever failed to complete any work awarded to it or been removed from any project awarded to the
firm? If yes, provide an explanation and contact information for the Owner's Project Manager.
3) List the contact persons, addresses, and phone numbers for your insurance carrier and agent.
4) List the contact persons, addresses, and phone numbers for the firm's bonding company and agent.
5) List the percentage of your firm's work during the past five (5) years has been negotiated.
6) Supply firm's Current Ratio (Current Assets/Current Liabilities) experience for the last five (5) years, with a
signed affidavit.
D. Personnel Resources
1) Provide general information about the firm's personnel resources, including skill groups and numbers of
employees for the proposed office location and the firm.
2) Name all key personnel which will be part of the construction management team for this project and provide
their cities of residence. Describe in detail the experience and expertise of each team member. The key
personnel, at a minimum, are the project superintendent, project manager, estimator or preconstruction
manager, and the executive in charge. (Note: Key personnel must be committed to this project for its duration
unless excused by the College.)
3) For each project listed as part of the relevant project experience sections, list the members of the proposed
team for this project (including consultant staff) who worked on each listed project and describe their roles in
those projects. If the team as a whole provided construction management services for any of the relevant
projects listed, so indicate.
4) Name any consultants which are included as part of the proposed team. Describe each consultant's proposed
role in the project and its related experience. Identify on which of the relevant projects your firm has worked
with the consultant.
E. General CM-R Project Experience
1) List the five (5) projects with photos and floor plans for which your firm has provided or is providing
construction management services which are most related to this project. List the projects in priority order,
with the most related project listed first. In determining which projects are most related, consider the
following:
similar use, size and complexity;
facilities achieving LEED or Green Globe certification or projects where sustainable building strategies
were implemented;
renovation or expansion of existing structures;
2) For each of the listed projects, provide the following information:
construction cost (original GMP and final construction cost);
current phase of development;
estimated (or past) completion date;
type of construction services provided (CM at risk with GMP, CM-agency, design/build, general
contractor-low bid, negotiated general contract, subcontractor to prime);
owner's contact person and telephone number and the name and telephone number of the project
architect;
any active or pending legal claims and explain.
7
F. Specific Project Experience
1) Using the most relevant of your firm's past projects (CM-R or other delivery method), provide a discussion of
how this project demonstrates your firm's singular capability to successfully complete this Project.
a) Describe how your firm's approach to project management establishes clear lines of authority,
responsibility and communication to achieve success.
b) Describe conflicts or potential conflicts with the owner or with trade contractors and describe the methods
used to prevent and/or resolve those conflicts.
c) Describe the types of records, reports, monitoring systems and information management systems which
your firm used in the management of those projects.
d) Describe your cost control methods for the preconstruction and construction phases. How do you
develop cost estimates and how often are they updated? Provide examples of how these techniques were
used and what degree of accuracy was achieved. Include examples of successful value engineering to
maintain project budgets without sacrificing quality.
e) Describe the way your firm maintains quality control during the preconstruction and construction phases.
Provide specific examples of how these techniques were used.
f) Describe the way in which your firm develops and maintains project schedules. How often do you update
schedules? Provide examples of how these techniques were used. Include specific examples of
scheduling challenges, and how your firm helped solve them.
2) Beyond the work examples submitted, describe your firm's experience with LEED or Green Globe
certification, or with projects where sustainable building strategies were implemented. Describe how your
firm can bring alternative construction methods proven to be cost-effective and appropriate for this project.
3) The College, the Design Team and the selected CM-R are expected to use Building Information Modeling
(BIM) systems in connection with the design, engineering, coordination and construction of the Project, with
all design and engineering of the Project being provided in one or more integrated BIM models. Describe
your firm's experience in the use of BIM systems during both preconstruction (e.g., systems analysis, cost
estimating and scheduling) and construction (e.g., trade coordination and configuration control).
G. Statement of Why Firm Should Be Selected
Provide a summary statement, no longer than one (1) page, which differentiates your firm from others offering
similar services and which uniquely establishes the firm's capacity and capability to perform this project.
5. EVALUATION CRITERIA
A. Prerequisite Criteria. Firms must meet the criteria listed immediately below. Firms that do not meet these
criteria are automatically disqualified from further evaluation.
1) Firm MUST have proper, current licenses at the time of submission to perform construction management
services and to act as a prime contractor in the state of South Carolina. Copies of licenses must be provided.
2) Firm MUST provide a certificate of insurance showing the firm's current limits of liability for commercial
general liability, employer's liability, business automobile liability and professional liability.
3) Firm MUST provide a letter of commitment from a firm or firms licensed in the state of South Carolina to
provide a Builder's Risk Insurance Policy and other insurance as required for this project can be obtained.
4) Firm MUST provide a letter of commitment from a firm or firms licensed in the state of South Carolina to
provide bonding in the amount of the Total Construction Cost (scope as defined above). For the purposes of
this submittal the Total Construction Cost shall be assumed to be $30 million ($30,000,000). The letter shall
include the firm's bonding capacity (aggregate and single project) and the available bonding capacity.
5) Firm MUST demonstrate a sustained and superior commitment to workplace safety in all activities. Firm shall
provide its OSHA incidence rates for recordable injuries and illnesses for the previous three years and shall
relate those rates to current industry averages. Firm shall also provide its Experience Modification Rates for
the previous five years. Rates which exceed industry averages by more than 10% may be grounds for
disqualification from further consideration.
6) Firm or any component firm of a joint venture or "prime-sub" team MUST NOT appear on the Federal
Government's Excluded Parties List System or in any debarment list maintained by any State or any entity of
South Carolina. A notarized affidavit to this effect shall be provided.
8
| RFQ CRITERIA | |
| MAJOR CATEGORY | CRITERIA ELEMENTS |
| Letter of Interest and Company Information | Company background and information Company statements and acknowledgements |
| Clarity of Submittal & Response to Prerequisite Criteria | Extent to which the instructions in the RFQ were followed and information is clearly presented. |
| Financial Information | Financial stability based on its ratio of current assets to current liabilities ("Current Ratio") and other evidences given. |
| Location of Firm's proposed office in relation to Project Site | Ability of project team to respond to project needs during pre- construction and construction. |
| Personnel Resources - Personnel Capability with Relevant Experience | Depth of resources with experience and ability, qualified and available for the key personnel roles. |
| Firm's General CM-R Project Experience | Experience with pre-construction and construction services. Experience on public agency projects. Claims and litigation record and any pending legal actions. |
| Firm's Specific Project Experience and Statement of Why the Firm Should be Selected for this Project | Experience with projects similar to this Project. Unique ability to provide services for this project. |
| Statement of Why Firm Should Be Selected | Summary Statement (1 Page) |
B. For those RFQ responses that have met the Prerequisite Criteria, the Selection Committee will evaluate the
submittals based upon the criteria listed in the table below. The criteria listed are in no particular order.
RFQ CRITERIA
MAJOR CATEGORY CRITERIA ELEMENTS
Letter of Interest and Company Company background and information
Information Company statements and acknowledgements
Clarity of Submittal & Response to Extent to which the instructions in the RFQ were followed and
Prerequisite Criteria information is clearly presented.
Financial stability based on its ratio of current assets to current
Financial Information
liabilities ("Current Ratio") and other evidences given.
Location of Firm's proposed office in Ability of project team to respond to project needs during pre-
relation to Project Site construction and construction.
Personnel Resources - Personnel Depth of resources with experience and ability, qualified and
Capability with Relevant Experience available for the key personnel roles.
Experience with pre-construction and construction services.
Firm's General CM-R Project Experience Experience on public agency projects.
Claims and litigation record and any pending legal actions.
Firm's Specific Project Experience and Experience with projects similar to this Project.
Statement of Why the Firm Should be
Unique ability to provide services for this project.
Selected for this Project
Summary Statement (1 Page)
Statement of Why Firm Should Be
Selected
9

With GovernmentContracts, you can:
Project Name: Heyward Street Waterline Replacement (CIP-2257) Agency/Owner: Beaufort - Jasper Water &
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/04/2026
Project Name: McCormick One Stop Renovations Agency/Owner: Town of McCormick Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
Ad Title: Barnwell County Emergency Debris Removal Purchasing Agent/Entity: Barnwell County Ad Publish
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
Project: CIP-2257 Heyward Street Waterline Replacement Ref. #: 2027-IFB-001 Type: IFB Status: Open
Beaufort - Jasper Water & Sewer Authority
Bid Due: 8/04/2026