| Location: | Florida |
|---|---|
| Posted: | Dec 3, 2025 |
| Due: | Dec 30, 2025 |
| Agency: | City of Hollywood |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Mechanical Integrity Test of Deep Injection Wells IW-1, IW-2, IW-3, and IW-4 at the South Regional Wastewater Treatment Plant
Addenda: 0
Release Date: 12/3/2025
Due Date: 12/30/2025
Work under this Contract consists of the Mechanical Integrity Testing for Deep Injection Wells No. 1, No. 2, No.3, and No. 4 at the South Regional Wastewater Treatment Plant.
The City of Hollywood (City) owns and operates the Southern Regional Wastewater Treatment Plant (SRWWTP). The SRWWTP is permitted to treat an average annual daily flow of 55.5 million gallons per day (mgd). The SRWWTP has four (4) deep injection wells (IW-1, IW-2, IW-3, and IW-4). As specified in Rule 62-528, Florida Administrative Code (FAC), deep injection wells must demonstrate both internal and external mechanical integrity every 5 years. Mechanical integrity testing (MIT) for all the deep injection wells at the SRWWTP and net MITS are shown in the table below:
|
Well Name |
Last MIT Date |
Next MIT Due Date |
|
IW-1 |
August 21, 2022 |
August 20, 2027 |
|
IW-2 |
August 31, 2022 |
August 30, 2027 |
|
IW-3 |
April 26, 2021 |
April 25, 2026 |
|
IW-4 |
September 7, 2021 |
September 6, 2026 |
MIT of each injection well will consist of performance of a video survey, pressure testing, temperature logging, and performance of a radioactive tracer survey (RTS). The Florida Department of Environmental Protection (FDEP) requires that a MIT Plan providing testing procedures be submitted to, and approved by, the Underground Injection Control (UIC) program of the FDEP. Additionally, it will be necessary for the City to hire a well testing Contractor to perform the actual MIT of the wells. A set of Technical Specifications detailing the testing procedures is required for the City to solicit competitive bids from potential testing Contractors.
Brown and Caldwell, along with its subconsultant, McNabb-Miller Hydrogeologic Consulting, Inc. (MMHC), has completed the MIT Plan and technical specifications. The same team will perform the professional services associated with the MIT testing.

With GovernmentContracts, you can:
...WRITING AND DOCUMENT REVIEW SERVICES 973-360-000-0000 ENVIRONMENTAL STUDIES SERVICES &; CONSULTING... Resources Assessment ...
State Government of Florida
Bid Due: 10/11/2040
...-0000 DREDGING SERVICES, 973-360-000-0000 ENVIRONMENTAL STUDIES SERVICES &; CONSULTING SERVICES 977... AND ENVIRONMENTAL ...
State Government of Florida
Bid Due: 9/10/2040
...SERVICES 973-360-000-0000 ENVIRONMENTAL STUDIES SERVICES &; CONSULTING SERVICES 991-025-000-0000... Assessment and National Environmental ...
State Government of Florida
Bid Due: 10/11/2040
...DOCUMENT REVIEW SERVICES 973-360-000-0000 ENVIRONMENTAL STUDIES SERVICES &; CONSULTING SERVICES 991-025... Resources Assessment ...
State Government of Florida
Bid Due: 10/11/2040