Mechanical Integrity Test of Deep Injection Wells IW-1, IW-2, IW-3, and IW-4 at the South Regional Wastewater Treatment Plant

Location: Florida
Posted: Dec 3, 2025
Due: Dec 30, 2025
Agency: City of Hollywood
Type of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Mechanical Integrity Test of Deep Injection Wells IW-1, IW-2, IW-3, and IW-4 at the South Regional Wastewater Treatment Plant

Addenda: 0

Release Date: 12/3/2025

Due Date: 12/30/2025

Post Information
Posted At:Wed, Dec 3, 2025 3:53 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

Work under this Contract consists of the Mechanical Integrity Testing for Deep Injection Wells No. 1, No. 2, No.3, and No. 4 at the South Regional Wastewater Treatment Plant.

Background

The City of Hollywood (City) owns and operates the Southern Regional Wastewater Treatment Plant (SRWWTP). The SRWWTP is permitted to treat an average annual daily flow of 55.5 million gallons per day (mgd). The SRWWTP has four (4) deep injection wells (IW-1, IW-2, IW-3, and IW-4). As specified in Rule 62-528, Florida Administrative Code (FAC), deep injection wells must demonstrate both internal and external mechanical integrity every 5 years. Mechanical integrity testing (MIT) for all the deep injection wells at the SRWWTP and net MITS are shown in the table below:

Well Name

Last MIT Date

Next MIT Due Date

IW-1

August 21, 2022

August 20, 2027

IW-2

August 31, 2022

August 30, 2027

IW-3

April 26, 2021

April 25, 2026

IW-4

September 7, 2021

September 6, 2026

MIT of each injection well will consist of performance of a video survey, pressure testing, temperature logging, and performance of a radioactive tracer survey (RTS). The Florida Department of Environmental Protection (FDEP) requires that a MIT Plan providing testing procedures be submitted to, and approved by, the Underground Injection Control (UIC) program of the FDEP. Additionally, it will be necessary for the City to hire a well testing Contractor to perform the actual MIT of the wells. A set of Technical Specifications detailing the testing procedures is required for the City to solicit competitive bids from potential testing Contractors.

Brown and Caldwell, along with its subconsultant, McNabb-Miller Hydrogeologic Consulting, Inc. (MMHC), has completed the MIT Plan and technical specifications. The same team will perform the professional services associated with the MIT testing.

Timeline
Release Project Date:
December 3, 2025
Question Submission Deadline:
December 23, 2025, 5:00pm
Proposal Submission Deadline:
December 30, 2025, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Title Specifications for Underground Trenching and Conduit Services Secondary Contact Number 13-26... Scope ...

Brevard County School Board

Bid Due: 7/10/2026

...Title Specifications for Underground Trenching and Conduit Services Secondary Contact Number 13-26... Scope ...

Keys Energy Services

Bid Due: 7/10/2026

...Title Specifications for Underground Trenching and Conduit Services Secondary Contact Number 13-26... Scope ...

Polk County Public Schools Facilities and Operations

Bid Due: 7/10/2026

...Project: AS NEEDED UNDERGROUND UTILITY LOCATING AND BULK ASSET INVENTORY COLLECTION SERVICES Ref...

Pasco County

Bid Due: 6/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.