Z1DA--NRM CONST 528-25-115 EXTERIOR IMPROVEMENTS

Location: New York
Posted: Jul 30, 2025
Due: Sep 4, 2025
Agency: VETERANS AFFAIRS, DEPARTMENT OF
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 36C24225B0040
Publication URL: To access bid details, please log in.
Follow
Z1DA--NRM CONST 528-25-115 EXTERIOR IMPROVEMENTS
Active
Contract Opportunity
Notice ID
36C24225B0040
Related Notice
36C24225B0040
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
242-NETWORK CONTRACT OFFICE 02 (36C242)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 30, 2025 11:44 am EDT
  • Original Published Date: Jul 29, 2025 04:07 pm EDT
  • Updated Date Offers Due: Sep 04, 2025 12:30 pm EDT
  • Original Date Offers Due: Aug 28, 2025 12:30 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Oct 27, 2025
  • Original Inactive Date: Oct 27, 2025
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside:
  • Updated Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
  • Product Service Code: Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES
  • NAICS Code:
    • 238990 - All Other Specialty Trade Contractors
  • Place of Performance:
    Buffalo , NY 14215
    USA
Description
Buffalo VA Exterior Improvements Project# 528-25-115

Construction Statement of Work (SOW)
Project: Buffalo VA Exterior Improvements
Project Number: 528-25-115
06/16/2025
Location
Work performed under this scope will be for and conducted within VA Western New York Healthcare System (VAWNYHS) at the Buffalo VA Medical Center (VAMC) located at 3495 Bailey Avenue Buffalo, NY 14215.

Background
The Buffalo VAMC campus is in need of exterior campus improvements. This project aims to address items that are in need of repair or replacement. Refer to the scope section below for additional information.
GENERAL REQUIREMENTS
All electrical work shall be performed in accordance with the latest editions of the National Electrical Code (NEC), National Fire Protection Association (NFPA) standards, VA Design Guides, and applicable local and federal regulations. The Contractor shall follow any/all applicable standards and codes, including, but not limited to applicable NFPA standards, NEC, JCAHO, OSHA, ANSI, ASHRAE, and any other codes.
The Contractor shall provide all labor, materials, equipment, tools, supervision, and incidentals required to complete the work in a safe, code-compliant, and professional manner.
Work shall be coordinated with the VA to ensure minimal disruption to ongoing medical operations. Temporary protection, dust control, and infection control measures shall be implemented where necessary. Although there is no formal phasing for this project, work shall be focused on the same general areas to minimize disruptions to the facility. The contractor may submit their own phasing plan to the VA for review and approval.
All electrical systems shall be de-energized before demolition and re-energized only after VA acceptance testing and verification of full system functionality.
The Contractor is responsible for verification of all site conditions prior to installation.
The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc...) necessary to perform services identified in this SOW.
All Contractor personnel working onsite at the Medical Center will be required to provide proof of OSHA 10-hour training. All site supervisors and Competent Personnel will be required to provide proof of OSHA 30-hour training.
The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work.
The contractor shall provide submittals and shop drawings for review prior to starting work.
In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
Although the VA makes every effort to keep SOW current to existing conditions, changes and updates are sometimes not recorded. It is therefore the Contractor s responsibility to perform field investigation and verify of the accuracy of the drawings with the actual conditions. The contractor shall check existing conditions at the project site prior to bidding.
Any wall or ceiling mounted signage, alarms, decoration, or other ancillary feature that require temporary removal or relocation to complete the work shall be the contractor s responsibility to remove and reinstall. If any signage, alarms, or other feature is damaged during construction, the contractor shall replace with an equivalent device as approved by the COR at no additional cost to the VA.
All work shall be documented by the contractor with before-and-after photos.
Electrical testing, including insulation resistance, ground continuity, and load testing, shall be conducted and results submitted for VA review.
VA safety protocols and infection control risk assessments (ICRA) must be adhered to at all times.
The Contractor shall be responsible for coordinating all shutdowns and service interruptions with VA Engineering Services at least 10 business days in advance. Regular business hours shall be defined as 6:00AM-6:00PM Monday through Friday.
Although the VA Western New York Health System campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the general public. Accessing these areas may require advance notice, pre-approval, and scheduling to gain entry.
All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the COR.
It is VHA policy to respect the privacy of all persons (e.g., Veterans, patients, residents, members of the VHA workforce, and visitors) consistent with the needs of operating a national health care system. Privacy protections on VHA premises vary according to the needs and purposes of different types of areas, the persons included, and the purpose of the production and use of photographs, digital images, and video or audio recordings (excerpt from VHA Directive 1078). Photography of as built and site conditions are permissible actions under this SOW when photography activities are coordinated with the COR. The Contractor shall ensure that any photographs taken do NOT include any VHA patients, members of the VHA workforce, or visitors to the VAMC facility.
All members of the on-site workforce will be required to obtain VA badges. Contractor to coordinate with the project COR to schedule workers to receive badges. A list of workers requiring badges shall be provided to the project COR prior to scheduling.
The Contractor shall provide weekly status reports throughout the duration of the contract. The reports shall include at a minimum the information listed below. The status report will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC) or Portable Document Format (*.PDF) that can be emailed to COR, however, note that the VA email cannot accept file sizes larger than 5mb. Files over that size may be provided through an internet-based file sharing software such as SharePoint. The reporting period shall begin once the Notice to Proceed has been issued to the contractor. Information required in weekly status reports:
Weekly Status Report shall include the following at a minimum:
Itemized list of progress completed
Itemized list of tasks behind schedule
Updated project schedule
Any Requests for future work, i.e. access, Shutdowns, Utility coordination, VA Engineering team assistance, etc.
Project and safety issues, or other concerns

The Contractor shall conduct a kick-off meeting at the VAMC. During the kick-off meeting the Contractor shall address their plan to meet the design intent, review the schedule, and review their plan to address any risks associated with the effort. In preparation for this meeting Contractor shall submit:
An updated work plan that adds additional details based upon approved submittal information.
Any additional clarifying details about the work to be performed that have been updated bases upon the approved submittals.

Any action items resulting from this meeting shall be addressed prior to ordering any materials or beginning the actual construction work.
In conjunction with the Kick-off Meeting, the Contractor shall survey the existing area to assess current site conditions and gather information necessary to carry out required tasks.
Contractor shall provide submittals for the work covered in the scope below to the VA for review and approval prior to the start of work on site. At such time the Contractor shall attend a Preconstruction Conference. Topics to be covered at this meeting shall include:
Introductions
Names of representatives attending [list the names of all participants along with the departments they are leading].
Discussion of the construction contract.
Schedule for the completion of the contract.
Review of the construction plans.
Working area limits.
Storage and staging areas.
Construction safety and ICRA.
Final comments and notes.

The Contractor shall be responsible for reviewing works they complete as well as work done by any subcontractors that the Contractor has hired to assist with the completion of this SOW.
Periodic formal and informal construction inspections shall be performed by VA staff throughout the construction process to assess the quality and compliance of the project in comparison to the Contract Documents. Typical inspection examples include review of safety, dust and infection control systems and configurations, review of completed work and work underway, and final inspections of finished products.
Timing of inspection points shall be discussed with the VA COR during the development of project construction schedule submittal.
Any findings identified during an inspection shall be photographed, documented in writing, and delivered to the contractor.
The Contractor shall respond in writing and provide evidential proof of compliance/rectification/resolution to each finding identified.
Some findings may require resolution prior to moving to the next construction process.
Final inspection shall be conducted jointly before final acceptance of the constructed product. The groups that shall participate in the verification process include:
Prime Contractor
Subcontractor (as applicable)
VA Engineering

These inspections will be based upon manufacturer data and accepted industry standards, and will be checked against VA regulatory requirements as applicable.
Any work that does not pass inspection, the Contractor shall troubleshoot the issue and determine if the FboNotice cause of the problem. If the FboNotice cause is the result of the construction work, the Contractor shall repair and/or replace the faulty construction work and any subsequent damage at no additional cost to the Government. If the FboNotice cause is the result of faulty equipment or materials (manufacturer defect), the Contractor shall coordinate with the manufacturer / supplier to repair and / or replace the faulty equipment or materials and any subsequent damage at no additional cost to the Government.

SCOPE
The scope of construction work is fully described in the scope narrative below and the associated specifications and attachments.
Section (1) - Site Landscaping and Concrete Cleaning
1. General Work Overview

The contractor shall provide all labor, materials, supervision, and equipment to complete a one-time landscaping and hardscape service at the Buffalo VA Medical Center in accordance with the scope of work listed in this section, and in accordance with local environmental regulations. The work includes tree and shrub maintenance, restoration of landscaped areas, and concrete cleaning and sealing in Veterans Park, as detailed below.

2. SITE LANDSCAPING

2.1 General Requirements
All landscaping work shall be coordinated with the VA COR (Contracting Officer s Representative) to avoid disruption to patient care or facility operations.

2.2 Detailed Tasks

1. Tree and Shrub Maintenance refer to attachment 26 for areas requiring the following work:
Prune and trim all trees and shrubs to maintain healthy growth and ensure no contact with buildings or utilities.
Trimming shall meet ANSI A300 pruning standards and ensure clear sightlines and pedestrian safety.
All pruning debris shall be collected and removed from the site daily.

2. Weeding and Bed Preparation (refer to attachment 26 for locations)
Weed all planting beds, including parking lot islands, perimeter beds, and planter areas.
Ensure that weeding does not disturb existing plant FboNotice systems or underground utilities.

3. Decorative Stone Installation (refer to attachment 26 for locations)
Install decorative stone to all planting beds and around trees that currently lack coverage.
Stone must match the existing on-site material in type, size, and color, and be installed with appropriate weed barriers where required.
4. Planting Enhancement (refer to attachment 26 for locations)
Replace all dead shrubs and perennials in existing beds and planters with same plant species.
Add new perennial plantings in all planting beds to enhance site aesthetics. Contractor shall assume this effort requires 100 small pot plants. Plant species shall be appropriate for planting area and climate.
All plants must be hardy USDA Zone 6 perennials, low-maintenance, and non-invasive.

5. Contractor Equipment and Safety
The contractor shall supply all necessary equipment, including pole trimmers, ladders, hand tools, and power hedge trimmers.
The contractor is responsible for securing work areas and protecting VA property and pedestrians during operations.
All green waste shall be removed from VA premises and disposed of in accordance with local regulations.

3. CONCRETE CLEANING & SEALING Veterans Park

3.1 General Requirements
The contractor shall clean and seal concrete surfaces in Veterans Park, including walkways, stairs, and vertical concrete features, not including the building. All materials and methods shall conform to environmentally compliant cleaning practices.

3.2 Detailed Tasks

1. Concrete Cleaning
Clean all exposed concrete with hot water pressure washing using biodegradable, non-toxic cleaning agents to remove mold, mildew, staining, and accumulated grime.
Avoid damage to surface finishes or expansion joints.
Use containment methods to prevent runoff into storm drains.

2. Concrete Sealing
Apply a high-quality, silane/siloxane or equivalent breathable concrete sealer approved for pedestrian use. Contractor to submit sealant product to the VA for review and approval.
Include all required surface prep, curing time, and post-application inspection.
Address any areas where the sealer fails to adhere, or bubbles appear.

3. Phasing and Access
Access to work areas will be provided to the contractor during normal business hours. The VA will coordinate closing areas off to patients, visitors and staff as needed. Contractor to coordinate work areas needed with the VA a minimum of 10 business days prior to work occurring. Coordinate all work schedules with the VA COR, including signage and barriers during sealing activities.

4. Tools and Materials
Contractor must provide all tools, pressure washers, sprayers, and cleaning agents. Contractor to submit equipment specifications and proposed cleaning agents to the VA for review and approval.

5. Environmental Protection
All chemicals must be environmentally safe. If hazardous substances are used, the contractor must employ containment systems to prevent discharge.
Adherence to EPA Stormwater Best Management Practices (BMPs) is mandatory.
4. DELIVERABLES
Pre-Construction Plan (Work schedule, staging areas)
Materials Submittals (Stone, mulch, sealant specs, equipment)
Photographic Documentation (Before, during, and after)
Section (2) Electrical Improvements
A. INSIDE VETERANS PARK
A1 Stair Lights (QTY:8)
Remove existing stair lighting fixtures and associated electrical components. Modify existing branch circuitry, extend conduit and wiring as necessary to accommodate new fixtures. Install stair lights per VA-approved submittals and lighting schedule specifications below. Ensure complete commissioning and operational verification. Lighting shall be controlled by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #16 and #23 for additional details.
A2 Canopy Entrance Lights (QTY:5)
Demolish and dispose of existing canopy entrance fixtures and components. Reconfigure and extend existing conduit and conductors as required. Install new canopy-rated LED luminaires per VA-approved submittals and lighting schedule specifications below. Surface preparation and ceiling refinishing (patching and repainting) shall extend to adjacent architectural boundaries, with exact limits established during the pre-bid walk-through. See attachment for rendering and basis of design. See attachment #20 and #23 for additional details.
A3 Wall Pack Lights (QTY:6)
Decommission and remove existing wall-mounted luminaires. Upgrade conduit and circuitry as needed and install new LED wall packs per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #21 for additional details.
A4 REM Lights (QTY:3)
Remove and replace all Remote Emergency Module (REM) lights. Modify existing electrical feeds, ensuring reliable emergency circuit continuity per VA-approved submittals and lighting schedule specifications below. See attachment #15 for additional details.
A5 Garden Spotlights (QTY:8)
Remove current garden lighting fixtures. Modify landscape-grade conduit and wiring infrastructure to support new spotlights per VA-approved submittals and lighting schedule specifications below. Install per manufacturer cut sheets and photometric requirements. Lighting shall be control by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #10 and #23 and section 1 (Landscaping Improvements) for additional details.
A6 Antenna (QTY:1)
Remove wall-mounted antenna and all fasteners. Patch, seal, and finish all penetrations in accordance with VA building envelope standards. Refer to Section 3, Item #2 for required patch material.
B. OUTSIDE VETERANS PARK
B1 Direction Signage (QTY:2)
Disassemble the current illuminated signage. Replace all internal LED lighting modules. Remove and reinstall or replace lettering to match font and finish. Pressure wash and chemically treat signage masonry and metal frame for clean reinstallation. Restore sign system to fully operational condition. Install new conduit and wiring to the nearest power source in that area (there is an existing junction box is located within 15 of the sign). Signage shall be controlled by a photocell, install new photocell to ensure complete commissioning and operational verification.
B2 Bollard Light (QTY:2)
Demolish existing concrete footings and retain buried conduit. Modify and extend conduit and conductors. Form and pour new structural concrete bases and install new LED bollards to meet VA site lighting standards and per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by photocell. Install new photocell to ensure complete commissioning and operational verification. See attachment #19 and #23 for additional details.
C. FLAGPOLE AREA
C1 Flood Light (QTY:1)
Remove existing flood light base. Install new lighting base and extend underground conduit and wiring to base of new lights. Install new flagpole lighting on VA-specified bases with complete structural and electrical installation per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a photocell. Install new photocell to ensure complete commissioning and operational verification. See attachment #11 and 13 and #18 and section 3 (Civil Improvements) for additional details.
C2 Bollard Lights (QTY:8)
Install new conduits and wiring for new LED bollards (direct imbedment refer to product installation guidelines). Terminate to nearest utility source per VA construction standards and NEC for outdoor installations and per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a photocell. Install new photocell to ensure complete commissioning and operational verification. See attachment #12 and #19 and #23 and section 3 (Civil Improvements) and section 4 (Flagpole Improvements) for additional details.
C3 Flagpole Lights (QTY:3)
Remove existing flagpole lights and lighting bases and extend underground conduit and wiring. Install new flagpole lighting on new light bases with complete structural and electrical installation per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a photocell. Install new photocell to ensure complete commissioning and operational verification. See attachment #11 and #12 and #13 and #18 and section 3 (Civil Improvements) and section 4 (Flagpole Improvements for additional details.

D. MAIN VA SIGNAGE
D1 Facility Signage (QTY:1) Double sided
Fully dismantle and dispose of existing LED 2-sided electrical sign. Contractor to coordinate directly with signage vendor for pricing and submission of proposed designs to the VA for review and approval. Ensure full integration with electrical infrastructure, including conduit rerouting and reconnection as required. See attachment #23 and #24 and section 3 (Civil Improvements) for additional details.
E. MAIN ENTRANCE AREA
E1 Canopy Lights (QTY:6)
Same as A2. Emphasis on maintaining canopy watertight integrity during installation and per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #14 for additional details.
E2 Overhead Entrance Light (QTY:3)
Remove overhead fixtures, rework conduit and feeds, and install weather-rated fixtures with illumination levels compliant with IESNA RP-8 standards and per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #22 for additional details.
E4 Wall Pack Light (QTY:4)
Same scope as A3. Emphasis on uniform light distribution and vandal-resistant housing and per VA-approved submittals and lighting schedule specifications below. Lighting shall be control by a time clock and photocell, install new time clock and photocell to ensure complete commissioning and operational verification. See attachment #21 for additional details.
E5 Satellite Dish Removal (QTY:1)
Remove satellite dish and patch roof as needed to make it weather tight. Contractor to submit roof patching methods and materials to the VA for review and approval.
E6 Canopy Entrance Fixtures (QTY:8)
Same scope as E1. See attachment #17 for additional details.
F. LIGHT POLE INSTALLATION
F1 Parking Area Light Pole (QTY:1)
Demolish concrete base and install new structural pole foundation per manufacturer s installation manual and VA site lighting criteria. Modify underground conduit and wiring as required. Install VA-approved LED light poles per the lighting schedule specifications below with complete circuit testing and commissioning. Refer to section 3 for additional details and requirements. See attachment #23 and section 3 (Civil Improvements) for additional details.
Proposed Lighting Schedule:
A1
Recessed High Output Step Light 93047CFT32EB
A2
VCVL LED V8 P7 50K 80CRI T5M MVOLT AC6 DBLXD
A3
WST LED P1 50K VF MVOLT DBLXD
A4
KAXW LED P3 40K R3 MVOLT DBLXD
A5
C-Series LED 16215 40K 80CRI 1424 LUMEN
B2
StressCrete Group Bollard Type Belmont (Refer to SOW attachment for additional info. Contractor shall be responsible to submitted for the VA for review and approval).
C1
light- DSXF2 LED P1 50K 80CRI MSP MVOLT THK DBLXD
Accessories- DSXF2UBV DBLXD U
Mounting bracket- SBT-5S-DBLXD
C2
StressCrete Group Bollard Type Belmont (Refer to SOW attachment for additional info. Contractor shall be responsible to submitted for the VA for review and approval).
C3
light- DSXF2 LED P1 50K 80CRI MSP MVOLT THK DBLXD
Accessories- DSXF2UBV DBLXD U
Mounting bracket- SBT-5S-DBLXD
D1
Per the attach spec and drawing (Contractor shall be responsible to submitted for the VA for review and approval).
E1
KACM LED 60C 700 50K R5 MVOLT SRM DBLXD
E2
DSXF1 LED P1 50K MSP MVOLT THK DBLXD
E4
WST LED P1 50K VF MVOLT DBLXD
E6
OLAW23 53K MVOLT PE B
F1
Per the attach spec (Contractor shall be responsible to submitted for the VA for review and approval).



Section (3) Civil Improvements
The project scope of work will generally include the following items:
Repair Building 20 concrete steps. Contractor shall remove all loose and hollow sounding concrete and any reinforcing steel that has deteriorated greater than 20% of its original cross section. Concrete shall be removed to allow for new reinforcing steel to be properly spliced in and allow 2-inches of concrete to be poured behind new or existing exposed reinforcement. Form as needed and pour patches to match existing using NYSDOT type HP 5000 psi concrete. Existing handrail shall be sandblasted and / or wire wheeled down to bare steel, then primed and painted with two finish coats. Finished concrete shall be patched and ground to create seamless transitions between patches and existing. All sides of the stairs shall receive a minimum of two coats of Sherwin Williams Loxon XP masonry coating, color as approved by the VA. Refer to Attachments #1 and #9.
E wing limestone façade panel repair - Patching of the damaged limestone shall be accomplished using Conproco Matrix (a color tintable cementitious limestone patch material), or approved equal product color matched to existing adjacent limestone. Contractor to properly prepare surfaces in accordance with patch material manufacturer requirements, including saw cutting, cleaning and priming. It is important that surface preparation, product application and curing strictly adhere to manufacturer requirements. This work must be performed outside of these hours: Monday through Friday 6:00 am to 6:00 pm. Refer to attachment #2 for additional information.

Prepare area and pour a new concrete pad for a bike shelter. Effort involves removing a portion of existing handrail and making remaining portion of handrail safe, removing select bushes, removing material to create a pad depth of 6-inches (coordinate all removals with the VA - pad to be flush with adjacent concrete sidewalk and sloped to drain at 1.5%), including 12 deep haunches as detailed in attachment #3, place 1 crushed limestone as a leveling course, form and place 6 x 6 welded wire fabric in the vertical center of the new slab, and epoxy coated rebar in haunches as detailed. Pour high early strength NYSDOT type HP 5000 psi concrete and saw cut control joints 24 hours after the pour. After the concrete pad has cured, assemble and anchor government furnished bike shelter to the new concrete pad. Refer to attachment #3 for location and attachment #9 for concrete notes and requirements. Contractor to propose and provide anchor methods and materials, which must be submitted to the VA for review and approval.

A-wing island improvements. Remove all concrete inside of the island curbing down to subbase, taking care not to damage the existing light pole, pole base or manhole. Remove precast block sign structure in its entirety. Sawcut pavement to allow for all damaged / broken sections of curbing to be removed and replaced (approximately 25 LF). Form, place rebar and pour new curbing. Place expansion material along the inside perimeter of existing and new curb leaving it low to allow sealant to be placed over top, place 6 x 6 welded wire fabric in the vertical center of the new slab and pour concrete to the top of curb using NYSDOT type HP 5000 psi concrete. Properly cure concrete. Seal over expansion material with Dowsil 888 silicone joint sealant. Replace binder and top sections of asphalt removed to accommodate curb replacement. Depths of lifts shall match existing. Asphalt mixes shall be: Binder Course NYSDOT 19MM F2; Top Course NYSDOT 9.5MM F2. Both Polymer Modified HMA, 80 Series Compaction in accordance with NYSDOT Specification Section 402-3.07.D. Seal all new pavement seams with approved hot applied crack sealing material. All island curb to be painted safety yellow using Sherwin Williams SETFAST Acrylic Waterborne Traffic Marking Paint or approved equal. Contractor responsible for providing traffic control, signage, barricades and fencing as needed to cordon off the work area and redirect vehicle and pedestrian traffic. Refer to attachments #4 and #9 for additional information.

Main Entrance sign base / enclosure improvements this work shall occur after sign enclosure remodeling has been completed:

Contractor must submit all proposed materials to the VA for review and approval prior to starting work. Submittals include mortar, cleaning methods and detergents, brick stain type and color and application method, brick stain, concrete sealants and coatings.

V-shape rout all cracks in concrete to a depth and width of ½ . Clean and fill routed cracks with Dowsil 888 sealant or VA approved equal product. Total length of cracks is 10 linear feet or less.

Clean the brick surface using a pressure washer or a stiff brush with soapy water. Remove dirt, mildew, and efflorescence to create a clean, absorbent surface for staining brick. Allow the brick to dry completely before moving on. If using a pressure washer, pressure shall be 1,000 PSI to 1,500 maximum.

Cover all areas not receiving stain with drop cloths, plastic sheets, tape, etc to protect them from tuck pointing, stain splashes etc.

Inspect the brick-and-mortar joints. Make mortar repairs where necessary. Prepare mortar mix by following the manufacturer s directions. Replace any deteriorated mortar with the fresh mix. Be sure to work the mortar as far into the joint as possible and shape the repair to blend in with the rest of the joint. Give the mortar at least a few days to dry before staining.

Properly apply a brick stain H&C COLORTOP Solvent-Based Solid Color Sealer 250 in HC 109 Charred Walnut color (or VA approved equal product and color) to achieve even coverage and a professional finish using brushes, rollers, or quality sprayers in accordance with manufacturers recommendations. Choose the option that best suits the type of stain being used and the size of the brick surface.

Mix masonry stain and test the stain on a small, inconspicuous area of the brick to check for color accuracy and adhesion. VA must review and approve the test area before staining the rest of the surfaces.

Apply the stain evenly, working in small sections to maintain a wet edge and avoid lap marks. Follow the manufacturer s guidelines for application techniques and drying times. Multiple coats may be necessary to achieve the desired color and coverage.

Coat all remaining concrete with LOXON XP Waterproofing Masonry Coating in SW 6255 Morning Fog color (or approved VA product and color), applied in accordance with manufacturer recommendations. Protect all areas outside of concrete from splashes, spills, etc.

Refer to attachment #5 for photos of existing sign.
Pour a new colored stamped concrete path around the VA flag pole. Effort requires excavation, subgrade preparation, subbase stone, forming, pouring, curing and saw cutting control joints. Path to be flush with surrounding grade. Effort includes final restoration of adjacent areas, as needed, including topsoil, seed and straw, or hydroseed. Concrete shall be NYSDOT type HP 5000 psi concrete, with 6 welded wire fabric in the vertical center, properly cured and sealed. Depth of concrete path shall be 6-inches and slope away from the flagpole at 1.5%. Refer to attachment #6 for proposed concrete stamp pattern and color, and proposed limits of concrete path. Path includes a 2-foot wide strip of decorative stone on the outside perimeter of the concrete, placed over landscape fabric and contained within landscape edging (Eco Border Black Rubber landscape edging part number ECO6PK-BLK-WM) or VA approved equal product. Refer to attachment #9 for concrete notes and requirements. Work must be completed after all work described in section 4 is complete. Contractor to coordinate.

Curb replacement (light pole base replacement) remove and replace approximately 45 linear feet of concrete curb. Sawcut pavement to allow for all damaged / broken sections of curbing to be removed and replaced. Form, place rebar and pour new curbing using NYSDOT type HP 5000 psi concrete. Properly cure concrete. Replace binder and top sections of asphalt removed to accommodate curb replacement. Depths of lifts shall match existing. Asphalt mixes shall be: Binder Course NYSDOT 19MM F2; Top Course NYSDOT 9.5MM F2. Both Polymer Modified HMA, 80 Series Compaction in accordance with NYSDOT Specification Section 402-3.07.D. Seal all new pavement seams with approved hot applied crack sealing material. All island curb to be painted safety yellow using Sherwin Williams SETFAST Acrylic Waterborne Traffic Marking Paint or approved equal. Contractor responsible for providing traffic control, signage, barricades and fencing as needed to cordon off the work area. Restore lawn area with topsoil, seed and straw. Refer to attachments #7 and #9 for additional information and requirements. Refer to section 2, line item F1 for lighting, and electrical requirements associated with this task.

Landscaping shield improvements. Refer to attachment 8 for additional information. This effort involves removing landscaping glass rock and cleaning it to a like new condition by pressure washing, bucket washing or other VA approved method. Powerwash concrete base located near the center of the shield and coat concrete with LOXON XP Waterproofing Masonry Coating in SW 6255 Morning Fog color (or approved VA product and color). Perimeter landscaping edging shall be removed and replaced with Eco Border Black Rubber landscape edging part number ECO6PK-BLK-WM, or VA approved equal. Interior partitions shall be removed and replaced with new thin black rubber partitions (contractor to submit all proposed products and materials to the VA for review and approval). Existing stars shall be removed, cleaned and placed back to match existing locations. Remove and replace landscape fabric located under the glass rock. Completely restore shield to like new condition with configuration to match existing conditions. Efforts shall include temporarily storing glass rock while edging, fabric and other improvements are underway.

Remove two guard shacks from Veterans Park and move to storage on the VA Medical campus (coordinate exact storage location with the VA). This task involves disconnection of overhead power cabling, conduit and disconnect switches. Power source from the building shall be maintained. The north overhead cable feeding site lighting shall remain in place, only being disconnected from the north guard shack. The south overhead cable shall be removed entirely from the junction box on Building #1 to two poles located on the north and south sides of the Bailey Avenue entrance. These poles and associated foundations shall be completely demolished, and areas restored (topsoil, seed and straw, or topsoil and hydroseed to re-establish laws impacted by construction). Refer to attachment #25 for additional information and details. Removal of temporary power poles will need to be performed outside of normal working hours (Monday Friday 6:00am to 6:00pm). Contractor shall plan on performing that task over a weekend.


Section (4) - Flagpole replacement
1: Renovation of Buffalo VAMC Flagpoles:
The scope of construction work for the renovation of the Buffalo VAMC flagpoles is separated into the following subsections. Each subsection shall be treated separately for bidding purposes and shall have independent pricing separated by each subsection.
Estimated quantities, physical characteristics, and existing conditions described are for reference only purposes. It is the contractor s responsibility to completely understand the scope of work, owner phasing requirements (including non-business hour, weekend, and holiday work hours), field conditions, quantities, and means/ methods necessary to provide a complete and operable construction product.
Contractor shall be responsible for verification of underground utilities, temporary shoring, protection of existing to remain items including but not limited to underground utilities, etc. to accommodate project scope. Work described below shall be completed prior to work described in section 2, item #6 is started. Contractor to coordinate this work with all other work described in this SOW. Contractor shall review section 2 electrical improvements, and section 3 civil improvements to ensure the scope of work in the general vicinity of the flagpole is understood and well coordinated.
1A: Replace Main Flagpole:
The scope of construction work for the replacement of the main flagpole is as follows:
Remove and dispose of existing main flagpole including base & foundation.
Remove and dispose of abandoned concrete flagpole bases surrounding main flagpole. Estimated quantity six (6) and estimated dimensions 4 x 4 x 12 deep (each).
Remove and dispose of concrete patio pavers access to main flagpole. Estimated paver quantity twenty (20) and estimated dimension 2 x 2 x 2 thick (each).
Furnish and install a new main flagpole in the same location as existing. Flagpole replacement scope shall include complete delegated design package to meet AASHTO requirements for the region, minimum 110 MPH wind or more stringent as defined by Code, AASHTO, and applicable design standards. Complete delegated design package shall consist of design calculations and drawings including installation details of flagpole & foundation stamped and sealed by a professional engineer. Calculations shall include loading using the largest combination of flags defined below and the eagle ball truck combo. Additionally, the design package shall include at least three (3) separate submissions of a to-scale rendering with the largest flag combination and the selected eagle ball truck combo from the perspective of the main Bailey Avenue Entrance. Renderings required to be submitted prior to completed review of materials submittals. Additional parameters below:
Main Flagpole Characteristics:
60 tall measured above adjacent finished grade/elevation.
Flagpole shall be heavy-duty stainless-steel or aluminum with a dark anodized bronze finish (intended to closely match main building window trim). Proposed materials/ finishes required to hold up to normal flagpole wear and tear.
Internal winch mechanism, stainless steel with removable hand crank.
Furnish two hand cranks and two hand cranks custom fabricated to adapt to a standard ½ drill-chuck.
Mechanism shall have flush mounted, lockable access cover (core to fit Best Access systems) with piano hinge.
Internal revolving truck
Stainless steel aircraft cable halyard
Spun flash collar to match pole
Coated counterweight.
Coated snap hooks with covers
Beaded sling assembly.
Main flagpole is intended to continuously fly two flags at the same time. Flagpole, foundation, etc. to be structurally designed to meet AASHTO requirements for the region. There are two combinations of flags flown and are as follows:
Combination 1:
Top flag (American): 12 x18 .
Bottom flag (POW): 8 x12 .
Combination 2:
Top flag (American): 8 x12 .
Bottom flag (POW): 6 x10 .
Extra-Large Flying Eagle Ball-Truck combination; characteristics as follows:
Flying Eagle:
Overall minimum wingspan 44
Wingtip to Wingtip minimum measurement of 33
Gold tone, powder coat finish; exterior weather rated.
12 Diameter Gold Ball
Furnish a quantity of two (2) each, for both above flag combinations. Install VA selected combination; VA to select at time of installation.
Submittals, demolition, and new scope shall be phased such that the impacts to the facility are minimized and the facility is not without the main flagpole for a duration greater than 10 business days. Contractor shall be responsible for developing and submitting phasing plan.
Flagpole shall have lightning protection and general grounding required by NEC, Building Code, and other applicable publications.
Traffic control and impacts to the main entrance:
One Bailey Avenue entrance and exit lane must remain open at all times. Contractor is responsible for providing traffic control devices and personnel in accordance with the latest edition of the MUTCD.
Portions of work will be required to occur outside of normal operating hours (Monday through Friday 6:00am to 6:00pm).
Area restoration (topsoil, seed and straw, or topsoil and hydroseed to re-establish lawn where impacted by construction). This effort is only required if section 2, item #6 is removed from the scope of work as a bid deduct.
1B: Replacement of lighting in the general area of work:
Refer to section 2 of this SOW. Contractor shall coordinate flagpole work with electrical and lighting work within or adjacent to the work area.

1C: Protect Military Branch Flagpole(s):
Contractor is responsible for protecting six (6) military branch flagpoles within the vicinity of the work area, including bases & foundations. Contractor must furnish and install excavation shoring as needed to ensure the existing six (6) military branch flagpoles are not impacted by main flagpole foundation removal and construction. Repairing or replacing these flagpoles and flagpole bases, if required, will be the responsibility of the contractor. This section (1C) will be removed from the scope of work if the VA decides to include section 1D in the scope of work (see below - replace military branch flagpoles).
1D: Replace Military Branch Flagpole(s):
Remove and dispose of six (6) military branch flagpoles including bases & foundations.
Furnish and install six (6) military branch flagpoles including bases & foundations in the same location as existing. Flagpole replacement scope shall include complete delegated design package to meet AASHTO requirements for the region, minimum 110 MPH wind or more stringent as defined by Code, AASHTO, and applicable design standards. Complete delegated design package shall consist of design calculations and drawings including installation details of flagpole & foundation stamped and sealed by a professional engineer. Calculations shall include loading using the largest combination of flags defined below. Additional parameters below:
Flagpole Characteristics (each):
20 tall measured above adjacent finished grade/elevation.
Flagpole shall be heavy-duty stainless-steel or aluminum with a dark anodized bronze finish (intended to closely match main building window trim). Proposed materials/ finishes required to hold up to normal flagpole wear and tear.
Internal winch mechanism, stainless steel with removable hand crank.
Furnish two hand cranks and two hand cranks custom fabricated to adapt to a standard ½ drill-chuck.
Mechanism shall have flush mounted, lockable access cover (core to fit Best Access systems) with piano hinge.
Internal revolving truck
Stainless steel aircraft cable halyard
Spun flash collar to match pole
Coated counterweight.
Coated snap hooks with covers
Beaded sling assembly.
Each flagpole is intended to continuously fly a single flag at any time. Flagpole, foundation, etc. to be structurally designed to meet AASHTO requirements for the region and a 3 x 5 flag.
Furnish a quantity of two (2) each, for all six (6) military branches. Install one of two furnished flags for each military branch.
Flagpole shall have lightning protection and general grounding required by NEC, Building Code, and other applicable publications.
Traffic control and impacts to the main entrance:
One Bailey Avenue entrance and exit lane must remain open at all times. Contractor is responsible for providing traffic control devices and personnel in accordance with the latest edition of the MUTCD.
Portions of work will be required to occur outside of normal operating hours (Monday through Friday 6:00am to 6:00pm).
Area restoration (topsoil, seed and straw, or topsoil and hydroseed to re-establish lawn where impacted by construction). This effort is only required if section 2, item #6 is removed from the scope of work as a bid deduct.
If this section (1D) remains in the scope of work, section 1C (protect military branch flagpoles) will be removed from the scope of work.




Bids Deducts:
Provide bid deduct pricing for the following items:
Section 2:
Item B2
Item C1
Item C2

Section 3:
Item #3
Item #4
Item #6
Item #8
Item #9

Section 4:
1A-Item #9
1D (all items)

The bids deduct should include all labor and material associated with the line items above. The VA reserves the right to remove any item(s) from the scope of the project identified as a bid deduct during negotiations / prior to project award.
Attachments/Links
Contact Information
Contracting Office Address
  • 113 HOLLAND AVE
  • ALBANY , NY 12208
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Jul 7, 2025[Presolicitation (Original)] Z1DA--NRM CONST 528-25-115 EXTERIOR IMPROVEMENTS
Jul 29, 2025[Solicitation (Original)] Z1DA--NRM CONST 528-25-115 EXTERIOR IMPROVEMENTS
Aug 21, 2025[Solicitation (Updated)] Z1DA--NRM CONST 528-25-115 EXTERIOR IMPROVEMENTS
Sep 30, 2025[Award Notice (Original)] Y1DA--528-25-115 EXTERIOR IMPROVEMENTS
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.