C1NB--AE Critical AHU Mechanical Study 583-25-521
| Location: |
Indiana |
| Posted: |
Apr 22, 2025 |
| Due: |
May 30, 2025 |
| Agency: |
VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- C - Architect and Engineering Services - Construction
|
| Solicitation No: |
36C25025R0083 |
| Publication URL: |
To access bid details, please log in. |
C1NB--AE Critical AHU Mechanical Study 583-25-521
Active
Contract Opportunity
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
250-NETWORK CONTRACT OFFICE 10 (36C250)
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Presolicitation (Original)
-
Original Published Date: Apr 22, 2025 04:06 pm EDT
-
Original Response Date: May 30, 2025 02:00 pm EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Jul 29, 2025
-
Initiative:
Classification
Description
This AE Summary of Work (SOW) addresses VA requirements for the evaluation and documentation required to improve the performance of six different air handling units (AHUs) servicing multiple areas. Two AHUs, 37A & B, service the fourth-floor operating room area; AHUs 50 & 61 service the pharmacy compounding areas located on the seventh floor, and AHUs 20 & 29 service the sterile processing (SPS) area . All requirements have been combined into one AE SOW. In some instances, the SOW is separated to allow for different requirements for each set of AHUs and in other instances, the SOW is combined when the same information and performance is required for all. The sections that apply to AHU 37 A & B are designated 37AB ; the sections that apply to AHU 50 & 61 are designated as 5061, and the sections that apply to AHU 20 & 29 are designated 2029 . Where the section applies to all, it is designated with ALL .
The AE shall be aware that there are likely several undocumented changes that have been added to these AHUs over time. The information provided in this SOW is based upon a thorough review of all available documentation. If the modifications were not included in the project files, modifications cannot be verified and are not included. The AE will be required to develop all such missing information.
This SOW is for the evaluation and documentation of the deficiencies found. No design effort beyond investigation, development of recommendations, preparation of time and cost estimates, and report preparation is required. The final report(s) formulation shall include verbal presentation of recommendations, cost, and time estimates to VA Engineering personnel.
Attachments/Links
Contact Information
Contracting Office Address
-
VISN 10 CONSOLIDATED CONTRACTING 4100 WEST 3RD STREET
-
DAYTON , OH 45428
-
USA
Secondary Point of Contact
History
-
Apr 22, 2025 04:06 pm EDTPresolicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Description: Request for Proposal (RFP) for System Development and Implementation Partner - Electronic
State Government of Indiana
Bid Due: 6/09/2026
Project Number: 48003016-2026-034-C1 Notice To Bidder: New Salt Building in Fortville, IN Project
State Government of Indiana
Bid Due: 6/25/2026
Follow Project 26-3103 Repair (Replace) Infrared Heaters BLDG 435 (Nose Dock 4) Active
DEPT OF DEFENSE
Bid Due: 6/12/2026
Follow Project CTGB 26-3102, REPAIR (REPLACE) INFRARED HEATERS, B438 Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 6/12/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.