| Location: | California |
|---|---|
| Posted: | Jan 10, 2025 |
| Due: | Jan 30, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include adding a second lane to the off-ramp of
Bellam Boulevard from US 101 beyond the gore point and continue the lane beyond the
Interstate 580 (I-580) off-ramp to the Bellam Boulevard intersection. The I-580 eastbound (EB)
on-ramp would be widened in order to receive the shifted through lane. Additional improvements
generally include concrete barrier, traffic signal modification, storm drain improvements,
pavement markings/striping and a new retaining wall.
 See RFP - Northbound US 101/Bellam Blvd Off-Ramp Improvement Project for full details.

With GovernmentContracts, you can:
...including shoring, construction of concrete storm drain collars, junction structures, and manhole...),Storm Drain ...
City of Yorba Linda
Bid Due: 9/24/2026
...PDT Close Date: Sep 24th 2026, 2:00 PM PDT Project Description: Construction of ...
Ventura County
Bid Due: 9/24/2026
...Project ID: Title: Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at ...
City of Thousand Oaks
Bid Due: 10/21/2026
...trenching including shoring, construction of concrete storm drain collars, junction structures, and manhole...: ...
City of Yorba Linda
Bid Due: 9/24/2026