| Location: | California |
|---|---|
| Posted: | Jan 10, 2025 |
| Due: | Jan 30, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include adding a second lane to the off-ramp of
Bellam Boulevard from US 101 beyond the gore point and continue the lane beyond the
Interstate 580 (I-580) off-ramp to the Bellam Boulevard intersection. The I-580 eastbound (EB)
on-ramp would be widened in order to receive the shifted through lane. Additional improvements
generally include concrete barrier, traffic signal modification, storm drain improvements,
pavement markings/striping and a new retaining wall.
 See RFP - Northbound US 101/Bellam Blvd Off-Ramp Improvement Project for full details.

With GovernmentContracts, you can:
...project will include the installation of a new 24-inch HDPE storm drain pipe ...
Napa County
Bid Due: 7/07/2026
...Avenues, West of Grantland Avenue, Fresno, CA consists of Storm Drain Facilities and ...
Fresno Metropolitan Flood Control District
Bid Due: 6/17/2026
...from Devlin Road to State Route-29. Work also includes storm drain system installation ...
City of American Canyon
Bid Due: 7/09/2026
...utilities in area of work and design relocation as necessary (i.e.: storm drain ...
City of Rohnert Park
Bid Due: 6/26/2026