| Location: | California |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 1
Release Date: 6/3/2026
Due Date: 7/14/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...) Maintenance and Repair NIGP 93625 Electrical Equipment (Except Cable and Wires, and ...
San Diego County Water Authority
Bid Due: 12/31/2026
...operations. These facilities rely on electrical distribution systems, lighting, standby generators... Project ID: ...
San Benito County
Bid Due: 11/13/2026
...and lighting controls) and electrical branch wiring / power upgrades * Plumbing and ...
City of Oakland
Bid Due: 11/05/2026
...systems within the tenant area. Electrical work includes lighting, power distribution, and associated..., ...
City of Santa Cruz
Bid Due: 11/19/2026