| Location: | California |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CASS AND EL DORADO STREET CURB RAMP AND ROAD REHABILITATION (CIP2604C)
Addenda: 1
Release Date: 6/3/2026
Due Date: 7/14/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction for concrete curbs, gutters, sidewalks, driveways, ADA-compliant curb ramps, pavement, and storm drainage improvements. Pavement rehabilitation work includes milling, the placement of hot mix asphalt (HMA), rubberized hot mix asphalt (RHMA-G), stress absorbing membrane interlayer (SAMI), the application of pavement seal coats, and Class 2 Aggregate Base, per plan. Additional improvements include the installation of street lighting, electrical, permanent signage, striping, and curb painting, as well as the adjustment of utility structures to grade and the implementation of all required stormwater protection and traffic control measures.

With GovernmentContracts, you can:
...Project ID: 4699 Title: Quarterly LFG Well Installation Services, 2026 Addenda: 0 Release ...
Sacramento County
Bid Due: 7/23/2026
...Monitoring Wells Non-Mandatory Pre-Bid Meeting: Tuesday, July 28, 2026, at 1:00 PM Pittsburg ...
City of Pittsburg
Bid Due: 8/11/2026
...Monitoring Wells Non-Mandatory Pre-Bid Meeting: Tuesday, July 28, 2026, at 1:00 PM Pittsburg ...
City of Pittsburg
Bid Due: 8/11/2026
...Special Districts Blanket # Blanket # Buyer Jessica Barajas Description On-Call Well and ...
County of San Bernardino
Bid Due: 8/31/2026