Construction Manager/General Contractor Services for City Hall Deferred maintenance & Quad Redesign

Location: Oregon
Posted: Oct 5, 2026
Due: Oct 29, 2026
Agency: City of Springfield
Type of Government: State & Local
Category:
  • Q - Medical Services
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFP 4056
Publication URL: To access bid details, please log in.
City Hall Deferred Maintenance and Quad Redesign
Project Description

This Solicitation has been reissued as of October 5, 2026.

The City of Springfield is issuing this Request for Proposal under the provisions of ORS 279C.337 for a Construction Manager/General Contractor (CM/GC) to provide preconstruction and construction services for the City Hall Deferred Maintenance and Quad Redesign Project for Springfield City Hall, located at 225 5th Street, Springfield, Oregon (Project).

The Project includes the renovation of three of the four existing sections of the City Hall office space (“Quads”) totaling approximately 33,750 square feet of occupied office space. It includes accessibility improvements, building system upgrades, interior reconfiguration, and deferred maintenance. The selected CM/GC will provide preconstruction services and, contingent upon successful negotiation of a Guaranteed Maximum Price (GMP), construction services.

Project Schedule

All dates, times and locations are subject to change

RFP Opens October 5, 2026
MANDATORY Pre-Proposal Conference

October 15, 2026 at 11:00 am

Location: City Hall, JMR Conference Room

Request for Clarifications Due October 20, 2026 by 5:00 pm
Proposals Due

October 29, 2026 by 2:00 pm local time
Public Opening will be held via Teams

Click Here to Join

Notice of Compentitive Range Determination November 10, 2026 (Approx.)
Intent to Award Notice (Approximate) December 8, 2026 (Approx.)
Contract Award (Approximate) December 15, 2026 (Approx.)

All questions regarding this project should be addressed to the Contract Analyst identified below.

Amanda Clinton
Phone: 541-726-3628
Email: aclinton@springfield-or.gov

Questions will be reviewed and responses will be posted to this website. If, in the opinion of the City, it is necessary to amend or supplement the Request for Proposals, an Addendum will be prepared, posted below, and notifications sent to all proposers that provided a valid e-mail address. A developer may also request to be added to the list for notifications by emailing
Amanda Clinton at aclinton@springfield-or.gov.

The City will make every reasonable effort to notify all proposers of Addenda, however, it is recommended that teams routinely check the website for updated information. The City is not responsible for any explanation, clarification, interpretation or approval made or given in any manner except by written Addendum issued by the City.

Addenda will not be issued within 72 hours of the RFP response deadline without extending the RFP deadline.

Clarification Log None Posted

Any Questions and answers that do not amend or supplement the RFP will be posted here.

Addenda Issued
Addendum Number Addendum Date Date/Time Posted

Attachment Preview

CITY OF SPRINGFIELD
COVER PAGE
DEVELOPMENT & PUBLIC WORKS
COMMUNITY DEVELOPMENT DIVISION
Is issuing this Request for Proposals (RFP) under
Solicitation No. S4056 for
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)
SERVICES
FOR THE CITY HALL DEFERRED MAINTENANCE & QUAD REDESIGN
Date of Issue: October 5th, 2026
Public Opening Date and Time: Thursday, October 29th, 2026, by 2:00 pm.
Single Point of Contact (SPC): Amanda Clinton, Sr. Contract Analyst
Address: 225 5th Street, Springfield City Hall, Development & Public Works
City, State, Zip: Springfield, OR 97477
Phone (voice): 541-726-3628 (Oregon Relay TTY 711)
E-mail: aclinton@springfield-or.gov
The City of Springfield promotes equal opportunity for all individuals without regard to age, color,
disability, marital status, national origin, race, religion or creed, sex or gender, sexual orientation, or
veteran status.
The City of Springfield encourages proposers or sub-contractors who are minority, woman-owned
and emerging small businesses to participate in City projects.
If any respondent requires special assistance or auxiliary aids during the proposal, evaluation or award
process, please contact the SPC at least two (2) business days prior to the required assistance. TTY
users dial Oregon Relay Services at 711.
City of Springfield -RFP for CM/GC Services Page 1 of 2

TABLE OF CONTENTS
GENERAL INFORMATION ................................................................................................................... 4
1.1 INTRODUCTION ................................................................................................................................. 4
1.2 FUNDING SOURCE(S) ......................................................................................................................... 5
1.3 SINGLE POINT OF CONTACT (SPC) ................................................................................................... 5
SECTION 2: AUTHORITY, OVERVIEW, AND SCOPE ........................................................................ 5
2.1 AUTHORITY AND METHOD ............................................................................................................... 5
2.2 DEFINITION OF TERMS ...................................................................................................................... 5
2.3 OVERVIEW AND PURPOSE ................................................................................................................ 6
2.4 SCOPE OF WORK/SPECIFICATIONS ...................................................................................................7
2.5 PROJECT PHASES ............................................................................................................................... 8
2.6 PERIOD OF PERFORMANCE .............................................................................................................. 9
SECTION 3: PROCUREMENT REQUIREMENTS ............................................................................... 9
3.1 MINIMUM QUALIFICATIONS ............................................................................................................. 9
3.2 PREVAILING WAGE ............................................................................................................................ 9
3.3 MINIMUM SUBMISSION REQUIREMENTS ......................................................................................10
3.4 PROPOSAL REQUIREMENTS ........................................................................................................... 11
SECTION 4: SOLICITATION PROCESS ............................................................................................ 15
4.1 PUBLIC NOTICE ................................................................................................................................. 15
4.2 PRE-PROPOSAL CONFERENCE .......................................................................................................1 5
4.3 QUESTIONS / REQUESTS FOR CLARIFICATIONS .......................................................................... 16
4.4 SOLICITATION PROTESTS ............................................................................................................... 16
4.5 PROPOSAL DELIVERY OPTIONS ..................................................................................................... 17
4.6 PROPOSAL MODIFICATION OR WITHDRAWAL ............................................................................. 17
4.7 PROPOSAL DUE ................................................................................................................................18
4.8 PUBLIC OPENING ..............................................................................................................................18
4.9 PROPOSAL REJECTION ....................................................................................................................18
4.10 EVALUATION PROCESS ....................................................................................................................18
4.11 PREFERENCES ...................................................................................................................................2 1
4.12 POINT AND SCORE CALCULATIONS .............................................................................................. 22
4.13 RANKING OF PROPOSERS .............................................................................................................. 22
4.14 NEXT STEP DETERMINATION ..........................................................................................................23
4.15 INTERVIEW ROUND ......................................................................................................................... 24
SECTION 5: AWARD AND NEGOTIATION ....................................................................................... 24
5.1 AWARD NOTIFICATION PROCESS .................................................................................................. 24
5.2 INTENT TO AWARD PROTEST ......................................................................................................... 24
5.3 APPARENT SUCCESSFUL PROPOSER SUBMISSION REQUIREMENTS ....................................... 25
5.4 CONTRACT NEGOTIATION.............................................................................................................. 25
SECTION 6: ADDITIONAL INFORMATION ...................................................................................... 26
6.1 INCLUSIVE CONTRACTING PRACTICES ......................................................................................... 26
6.2 GOVERNING LAWS AND REGULATIONS ....................................................................................... 26
6.3 OWNERSHIP/PERMISSION TO USE MATERIALS ............................................................................2 7
6.4 CANCELLATION OF RFP; REJECTION OF PROPOSAL; NO DAMAGES. ........................................2 7
6.5 COST OF SUBMITTING A PROPOSAL ..............................................................................................2 7
City of Springfield -RFP for CM/GC Services Page 2 of 3

LIST OF ATTACHMENTS
ATTACHMENT A - SCOPE OF WORK
EXHIBIT A - ARCHITECTURAL DESIGN PLANS (75%)
EXHIBIT B - MEP PLANS (75%)
EXHIBIT C - SEISMIC STUDY
EXHIBIT D- CM/GC Cost Responsibility Matrix
ATTACHMENT B - SAMPLE CM/GC CONTRACT
ATTACHMENT C - PROPOSER INFORMATION & CERTIFICATION
ATTACHMENT D - COBID FORM
ATTACHMENT E - RESPONSIBILITY INQUIRY
ATTACHMENT F - REFERENCE FORM
City of Springfield -RFP for CM/GC Services Page 3 of 4

Event Date Time
RFP Issued/Advertised Monday, October 5th, 2026
(Optional) On-Site Tour: Interested parties wishing to tour the project site must contact the SPC to schedule a tour before the mandatory pre-proposal meeting. Tours are estimated to last 90 minutes. Tour appointments will be scheduled between October 12th & 13th. Email SPC for time/date. Pre-scheduled appointment only
(Mandatory In-Person) Pre-Proposal Conference Location: City Hall, Jesse Maine Room October 15, 2026 11:00 am
RFP Protest Period Ends October 22, 2026 7 calendar days prior to RFP opening By 5:00 p.m.
Questions / Requests for Clarification Due October 20, 2026, by 5:00 pm By 5:00 pm
Answers to Questions / Requests for Clarification Issued (approx.) October 23, 2026 By 5:00 pm
Proposals Due - Opening. Public Opening will be Thursday, October 29, 2026 2:00 pm
held at 2:00 pm via Teams
Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/264573475957629?
p=nN0JOqCPdIIJp2xo1u
Meeting ID: 264 573 475 957 629
Passcode: aA36Z8w6
Proposal Review October 30-November 5, 2026
Evaluation Initial Scoring (approx.) November 6th-10th, 2026
Notice of Competitive Range issued (approx.) November 10th, 2026
Competitive Range Protest Period Ends November 17, 2026
Interviews (If selected, you will be notified of available dates/time) November 18-20, 2026 To be determined
Separate initial reviews from interviews November 30-December 3
Final Scoring and Selection (approx.) December 4
(Mandatory In-Person)
Pre-Proposal Conference
Location: City Hall, Jesse Maine Room

GENERAL INFORMATION
1.1 INTRODUCTION
The City of Springfield is issuing this Request for Proposal under the provisions of ORS 279C.337 for a
Construction Manager/General Contractor (CM/GC) to provide preconstruction and construction
services for the City Hall Deferred Maintenance and Quad Redesign Project for Springfield City
Hall, located at 225 5th Street, Springfield, Oregon (Project).
The Project includes the renovation of three of the four existing sections of the City Hall office space
("Quads"), totaling approximately 33,750 square feet of occupied office space. It includes accessibility
improvements, building system upgrades, interior reconfiguration, and deferred maintenance. The
selected CM/GC will provide preconstruction services and, contingent upon successful negotiation of
a Guaranteed Maximum Price (GMP), construction services.
Event Date Time
RFP Issued/Advertised Monday, October 5th, 2026
(Optional) On-Site Tour:
Interested parties wishing to tour the project site Tour appointments will be Pre-scheduled
must contact the SPC to schedule a tour before the scheduled between October 12th appointment
mandatory pre-proposal meeting. Tours are & 13th. Email SPC for time/date. only
estimated to last 90 minutes.
(Mandatory In-Person)
Pre-Proposal Conference October 15, 2026 11:00 am
Location: City Hall, Jesse Maine Room
October 22, 2026
RFP Protest Period Ends 7 calendar days prior to RFP By 5:00 p.m.
opening
Questions / Requests for Clarification Due October 20, 2026, by 5:00 pm By 5:00 pm
Answers to Questions / Requests for Clarification
October 23, 2026 By 5:00 pm
Issued (approx.)
Proposals Due - Opening. Public Opening will be
held at 2:00 pm via Teams
Microsoft Teams meeting Join:
Thursday, October 29, 2026 2:00 pm
https://teams.microsoft.com/meet/264573475957629?
p=nN0JOqCPdIIJp2xo1u
Meeting ID: 264 573 475 957 629
Passcode: aA36Z8w6
Proposal Review October 30-November 5, 2026
Evaluation Initial Scoring (approx.) November 6th-10th, 2026
Notice of Competitive Range issued (approx.) November 10th, 2026
Competitive Range Protest Period Ends November 17, 2026
Interviews To be
November 18-20, 2026
(If selected, you will be notified of available dates/time) determined
Separate initial reviews from interviews November 30-December 3
Final Scoring and Selection (approx.) December 4
City of Springfield -RFP for CM/GC Services Page 4 of 5

Issuance of Notice of Intent to Award (approx.) Tuesday, December 8, 2026
Award Protest Period Ends December 15, 2026 7 calendar days after Notice of Intent to Award
City Council Pre-Approval (Approx.) December 7th, 2026
Contract Execution, Notice to Proceed (Approx.) December 15th, 2026

Issuance of Notice of Intent to Award (approx.) Tuesday, December 8, 2026
December 15, 2026
Award Protest Period Ends 7 calendar days after Notice of
Intent to Award
City Council Pre-Approval (Approx.) December 7th, 2026
Contract Execution, Notice to Proceed (Approx.) December 15th, 2026
1.2 FUNDING SOURCE(S)
The City expects that most of the project will be funded with City general funds and private
financing. However, the City is interested in exploring opportunities for state and federal grants and
loan programs to supplement local funds, and desires to contract with a CM/GC with experience
helping public agencies qualify for special funding programs.
1.3 SINGLE POINT OF CONTACT (SPC)
The SPC for this RFP is identified on the Cover Page, along with the SPC's contact information.
Proposer shall direct all communications related to any provision of the RFP only to the SPC, whether
about the technical requirements of the RFP, contractual requirements, the RFP process, or any other
provision.
SECTION 2:
AUTHORITY, OVERVIEW, AND SCOPE
2.1 AUTHORITY AND METHOD
City is issuing this RFP pursuant to its authority under Springfield Municipal Code (SMC) 2.700-2.711.
City is using the Competitive Sealed Proposal method to select a Construction Manager/General
Contractor (CM/GC), pursuant to ORS 279C.337 and applicable provisions of OAR Chapter 137,
Division 049.
2.2 DEFINITION OF TERMS
For the purposes of this RFP, capitalized words are defined in SMC 2.702, SMC 1.105, ORS 279A.010(1)
and the OAR chapter 137 division 49, or as defined below.
CM/GC (Construction Manager/General Contractor): The firm selected to provide preconstruction
services and, upon successful negotiation of a GMP or other pricing, construction services for the
Project.
CM/GC Fee: The negotiated fee for overhead and profit associated with Construction Services.
Construction Amendment: The contract amendment authorizing the CM/GC to perform Construction
Services, other than Early Work, typically following GMP negotiation.
Construction Services: Services performed after execution of the Construction Amendment, including
construction, subcontractor procurement, project management, and closeout.
City of Springfield -RFP for CM/GC Services Page 5 of 6

Cost of the Work: Direct and allowable costs incurred in performing Construction Services, as defined
in the Contract, excluding the CM/GC Fee.
Early Work Amendment: An amendment authorizing limited construction activities prior to execution
of the full Construction Amendment.
Guaranteed Maximum Price (GMP): The maximum compensation to be paid to the CM/GC for
Construction Services, including Cost of the Work and CM/GC Fee.
Open-Book Cost Estimating: A transparent process where the CM/GC provides detailed cost
information for review and reconciliation with the City and design team.
Preconstruction Services: Services performed prior to execution of the Construction Amendment,
including cost estimating, constructability review, scheduling, phasing, value engineering, and
coordination with the City and design team.
Project: The City Hall Deferred Maintenance and Quad Redesign Project located at 225 5th Street,
Springfield, Oregon.
Work: All labor, materials, equipment, and services required to complete the Project.
2.3 OVERVIEW AND PURPOSE
2.3.1 City Overview and Background
Located between the heart of Downtown Springfield to the south and the historic Washburne
District to the north, Springfield City Hall serves as the central civic anchor for the community.
The facility houses a range of public-facing services and administrative functions for the City,
including the Springfield Public Library, City Council chambers, public meeting rooms,
Development and Public Works' Planning and Building Permit counter, offices for City
administrative staff and executive leadership, and an employee health center.
Originally constructed as a commercial shopping center in 1972, the building was repurposed to
serve as the seat of City government circa 1980. While the structure has served the City for
decades, its original design and subsequent adaptations present ongoing challenges in
functionality, efficiency, and long-term performance as a modern civic facility.
2.3.2 Project Overview & Purpose
The purpose of this Request for Proposals (RFP) is to solicit qualified firms to provide
preconstruction and construction services for the Springfield City Hall remodel and deferred
maintenance project using the Construction Manager/General Contractor (CM/GC) alternative
contracting method.
Springfield City Hall is facing critical deferred maintenance, safety, and operational challenges. A
2025 OSHA audit identified code deficiencies, and the HVAC system-largely original to 1980-
has reached near-total failure, requiring extensive staff time and costly repairs to keep it
operational. Aging building systems, coupled with the limitations of a structure not originally
designed for governmental use, have contributed to inefficiencies in space utilization and service
delivery.
City of Springfield -RFP for CM/GC Services Page 6 of 7

What began as a limited remodel has evolved into a comprehensive modernization effort. The
City intends this project to address these deficiencies, improve life safety and code compliance,
and enhance operational efficiency. The Project is expected to result in a facility that can serve as
an effective civic center for the next 25-30 years, while maintaining continuity of essential
operations and public services throughout the construction process.
2.3.3 Project Background
The City has elected to utilize the CM/GC method to support a collaborative and flexible project
delivery approach that is well-suited to the complexity and constraints of this project. The City
has previously engaged a professional design firm to develop plans for the project, which has
proceeded to 75% design drawings for architectural modifications and major building systems.
The project involves significant deferred maintenance across multiple, interdependent building
systems, including HVAC, electrical, fire-life-safety, roofing, windows, plumbing, and security
systems. The CM/GC method will provide real-time constructability analysis and coordinated
sequencing to address these systems efficiently while reducing the risk of conflicts or rework.
Given the advanced condition of the existing HVAC system and the potential for system failure,
the City seeks to accelerate project delivery to minimize the risk of unplanned service
interruptions or emergency repairs.
In addition, the City anticipates the need for active value engineering to align the project scope
with available funding. The current project estimate ranges from approximately $12.5 million to
$13.8 million, with a target to reduce overall costs through iterative design and cost modeling.
The CM/GC will play a key role in providing continuous cost estimating, identifying cost-saving
opportunities, and helping the project team make informed decisions throughout design
development.
Springfield City Hall must remain operational throughout construction, requiring careful phasing
to maintain public access and continuity of critical public services. Early contractor involvement
will allow for the development of safe, efficient construction sequencing that minimizes
disruption to City operations.
Finally, the project is subject to market constraints, including long lead times for major building
components such as HVAC equipment and electrical systems, as well as the challenges
associated with renovating an older facility with space and infrastructure limitations. The CM/GC
approach enables early procurement planning, proactive risk management, and close
coordination between the City, design team, and contractor to successfully navigate these
constraints.
Following completion of the preconstruction phase, the City intends to negotiate a Guaranteed
Maximum Price (GMP) or other mutually agreed-upon pricing structure for construction services.
The selected CM/GC will be expected to participate in a transparent, iterative process that aligns
scope, budget, and schedule, and to deliver a high-quality project that meets the City's long-
term operational and community needs.
2.4 SCOPE OF WORK/SPECIFICATIONS
The CM/GC shall provide the services described in the attached Statement of Work, Attachment A and
sample contract document, CM/GC Sample Agreement, Attachment B.
City of Springfield -RFP for CM/GC Services Page 7 of 8

Project: City of Springfield "Quad" Office Renovation
Location: 225 5th Street, Springfield, OR 97477
Approximate Project Area: 33,750 sq ft
Estimated Total Project Cost (including preconstruction and design): $12.5 to $13.8 million
Estimated Construction Budget (Target GMP): $9 million
Estimated Contingency Task Budget: $1 million
2.4.1 PROJECT PHASES
The services of the CM/GC will be in two phases:
* Phase I - Preconstruction Phase.
* Phase II - Construction Phase.
2.4.2 Pre-Construction Services
Preconstruction services will be provided generally under the terms contained in the Sample CM/GC
Contract in Attachment B for services prior to the Construction Amendment, and paid for on a time
and materials basis up to $75,000 maximum. The specific scope of preconstruction services will be
negotiated prior to signing the final CM/GC Contract, based on the Proposer's input as well as the
City's requirements. The CM/GC must obtain written authorization from the City prior to performing
any additional preconstruction services beyond those covered by the allowance.
In general, pre-construction services are anticipated to include the following:
* Provide detailed cost estimates at design milestones.
* Conduct constructability reviews and recommend value engineering options.
* Develop phasing, site logistics, and safety plans to maintain public access during
construction.
* Advise on long-lead materials, procurement strategies, and market conditions.
* Participate in design meetings and coordinate closely with City staff and City's Design
Consultant team.
* Develop preliminary and detailed construction schedules.
* Assist with outreach to COBID-certified subcontractors.
* Collaboration during planning & design.
* Participation in reconciliation of CM/GC cost estimates with the design team and City, as
requested.
2.4.1 Construction Services
The City reserves the right not to proceed with the Construction Amendment and to
proceed with a formal sealed bidding procurement for construction services for the
Project.
If the CM/GC Contract is amended to include Construction Phase Services, those
services will generally be provided under the terms of the Sample CM/GC Contract in
City of Springfield -RFP for CM/GC Services Page 8 of 9

Attachment B based upon negotiation of the GMP. In general, construction services
are anticipated to include the following:
* Manage and perform all construction work required to rebuild the Quad areas.
* Maintain site safety, minimize disruptions to City operations, and coordinate access.
* Manage subcontractors, schedules, cost control, and QA/QC.
* Managing subcontractor procurement and bidding.
* Maintaining safety and quality control.
* Minimizing disruption to ongoing operations.
* Coordinating with building occupants and stakeholders.
* Complete all work according to the construction documents and deliver fully functional
and compliant space.
* Provide closeout documentation and support commissioning of site elements.
2.5 PERIOD OF PERFORMANCE
The schedule for performance of Services needed under the prospective Contract is
approximately:
* Phase I: December 2026 to July 2027 for pre-Construction Services.
* Phase II: July 2027 to July 2028 for Construction Services.
SECTION 3:
PROCUREMENT REQUIREMENTS
3.1 MINIMUM QUALIFICATIONS
3.1.1 To be considered for evaluation, the Proposal must demonstrate how the Proposer
meets all requirements of this section:
3.1.2 Bonding Capacity - Proposers shall be capable of providing a 100% performance bond
and 100% labor and material bond for the Project.
3.1.3 Specialized Experience - Proposers shall have five or more years of continuous
experience as a currently incorporated construction firm that has completed other
projects of comparable size, cost, and complexity during that time. The project(s) must
have included key personnel (project manager and superintendent) assigned to the
projects. Key personnel's experience may be with the present employer or with a
previous employer.
3.1.4 Licensing - Proposers and its subcontractors must be licensed to do business in the
State of Oregon and have current Oregon Construction Contracts Board registration.
3.1.5 Availability - Proposers shall have key personnel available for the time and magnitude
of the project throughout its duration. Key personnel assigned to the project shall
maintain their assigned position throughout the project unless requested to be
removed by the City or unless otherwise approved by the City.
3.2 PREVAILING WAGE
City of Springfield -RFP for CM/GC Services Page 9 of 10

The CM/GC and all subcontractors shall comply with ORS 279C.800 through 279C.870.
The Bureau of Labor and Industries (BOLI) Prevailing Wage Rates that will apply to the
Contract shall be those in effect at the time the first Early Work Amendment is
executed, or if there is no Early Work Amendment, then those prevailing wage rates in
effect at the time the Construction Amendment is executed.
Once established, the prevailing wage rates will then be in effect for the remainder of the CM/GC
Contract. The prevailing wage rates that will apply will be those set forth in the then current
version of the following BOLI booklet, together with any amendments to that booklet:
"PREVAILING WAGE RATES for Public Works Contracts in Oregon."
3.3 MINIMUM SUBMISSION REQUIREMENTS
3.3.1 Proposal Submissions
To be considered for evaluation, Proposal must contain each of the following elements (further
detailed in Proposal Requirements section below). A completeness check will be conducted for
each submission. Incomplete submissions will not be accepted.
Cover Letter
o
Project Proposal
o
Proposer Information & Certification Sheet (Attachment C)
o
COBID Information Form (Attachment D)
o
Responsibility Inquiry (Attachment E)
o
Reference Form (3 references) (Attachment F)
o
3.3.2 Proposal Page Limits
Proposal is limited to 25 pages. Any pages exceeding this limit will not be provided to the
evaluation committee or considered in the evaluation. The following items do not count
toward the page limit:
Resumes for Key Personnel
o
Work Samples
o
Proposer Information and Certification sheet (Attachment C)
o
COBID Information Form (Attachment D)
o
Responsibility Inquiry (Attachment E)
o
Reference Form for three (3) references (Attachment F)
o
3.3.3 Proposal Format and Quantity
Proposal should follow the format and reference the sections listed in the Proposal
Requirements section. Responses to each section and subsection should be labeled to indicate
the item being addressed.
Proposer shall submit one (1) hard copy of its Proposal and all other submittal requirements
using only white paper, minimum 12-point font bearing the Proposer's authorized
City of Springfield -RFP for CM/GC Services Page 10 of 11

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Solicitation # S-580100-00018205 Bid Solicitation # S-580100-00018205 Organization Name Eastern Oregon University

State Government of Oregon

Bid Due: 11/22/2026

Bid Solicitation # S-44300-00018213 Bid Solicitation # S-44300-00018213 Organization Name Oregon Health Authority

State Government of Oregon

Bid Due: 11/06/2026

City of Springfield Mobile Crisis Services Request for Proposals Project Description The City

City of Springfield

Bid Due: 11/23/2026

Bid Solicitation # S-10700-00018220 Bid Solicitation # S-10700-00018220 Organization Name Department of Administrative

State Government of Oregon

Bid Due: 11/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.