| Location: | Georgia |
|---|---|
| Posted: | Apr 9, 2025 |
| Due: | May 14, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66243-NONST-2025-000000066 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66243-NONST-2025-000000066 | BID 2025-32 BEAR BRANCH PUMP STATION UPGRADES PHASE II | Perry, City Of |
Apr 09, 2025 @ 04:15 PM
|
May 14, 2025 @ 10:15 AM
|
Start Date: Apr 09, 2025 @ 04:15 PM ET
End Date:
May 14, 2025 @ 10:15 AM ET
PART 1: GENERAL
1.1
Competitive Cost Sealed Bids
Separate sealed Bids for construction of Bear Branch Pump Station Upgrades Phase II for the City of Perry (Bid Number 2025-32) will be received until May 14, 2025 at 10:15a.m. in Perry City Hall, 1211 Washington Street, Perry, GA 31069. Bids will then be publicly opened and read aloud at said office. Any bid received after May 14, 2025 at 10:15a.m. will not be considered by the Owner. Following the closing time for the receipt of bids no bid may be withdrawn for a period of sixty (60) days.
1.2
Scope of Work
The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following:
Cleaning and relining of the two (2) existing wet wells. Removal of existing packaged pump station. Installation of new packaged suction lift pump station, suction and discharge piping, and associated electrical and instrumentation and controls improvements. Connect discharge piping to existing force main. Remove and replace emergency bypass connection. Install generator to provide backup power to the pump station. Install new 4-inch water service line. Connect to existing water service line. Install a water meter, backflow prevention device, and yard hydrant. Remove and replace chain link fencing as necessary for construction. The time allotted for final completion of work is 120 consecutive calendar days.
Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307.
All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
| Code | Description |
| 72012 | Booster or Circulating Pumps, In-Line |
| 72040 | Mechanical Pumps, Including Parts and Accessories |
| 72064 | Sewage and Sludge Pumps, Submersible |
| 72067 | Sewage and Sludge Pumps, Surface Mounted |
| 72073 | Sump Pumps: Submersible and Non-Submersible |
| 89069 | Sumps, Parts, and Accessories (See 720-73 for Sump Pumps) |
Joni Ary
joni.ary@perry-ga.gov
478-988-2715

With GovernmentContracts, you can:
...Follow HAIMER POWER CLAMP AND HAIMER TOOL DYNAMIC PRESET Active Contract Opportunity Notice ...
DEPT OF DEFENSE
Bid Due: 6/19/2026
...Bacteria and Fungi Type 67012 Grout, Pipe and Sewer 67061 Sewer Pipe Cleaning ...
State Government of Georgia
Bid Due: 6/23/2026
...furnish all labor, materials, tools, and equipment necessary to professionally modify existing carpeting... ...
DEPT OF DEFENSE
Bid Due: 6/15/2026
...Construction, Power Lines, Including Installation, Maintenance and Repair Services 91345 Construction, Sewer... and ...
State Government of Georgia
Bid Due: 6/29/2026