Communitywide Electrification Cost and Capacity Feasibility Studies for the City of Pinole

Location: California
Posted: Aug 30, 2026
Due: Sep 21, 2026
Agency: City of Pinole
Type of Government: State & Local
Category:
  • A - Research and development
  • B - Special Studies and Analyses - Not R&D
Publication URL: To access bid details, please log in.


Project ID:

Title: Communitywide Electrification Cost and Capacity Feasibility Studies for the City of Pinole

Addenda: 0

Release Date: 8/28/2026

Due Date: 9/21/2026

Follow
Communitywide Electrification Cost and Capacity Feasibility Studies for the City of Pinole
Community Development Department
90628 , 91800 , 91841 , 91843 , 91846 ... show all
Release Date: Friday, August 28, 2026
· Due Date: Monday, September 21, 2026 5:00pm
Posted Friday, August 28, 2026 9:35am
All dates & times in Pacific Time - Los Angeles
Draft Response No Bid21 days, 22 hours, 50 minutes


Post Information

Posted At:Fri, Aug 28, 2026 9:35 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The purpose of this Request for Proposal (RFP) is to invite proposals from qualified firms to assist the City of Pinole with communitywide electrification cost and capacity feasibility studies with a solutions-based approach to learn about potential barriers and methods to overcome them in order to achieve the community electrification goals in our Pinole Climate Action and Adaptation Plan (CAAP), a roadmap to achieve carbon neutrality by 2045.



Background

The City of Pinole is advancing community-wide building decarbonization through multiple, coordinated strategies. In 2024, the City launched the Pinole Energy Enhancement Rebate program (PEER) to help offset project cost of various energy-efficiency measures for single-family and multi-family property owners. The City is also recently launched an all-electric building virtual concierge—a one-stop platform designed to streamline adoption of electrification measures.

In tandem, the City is also pursuing reach codes to establish stronger standards that support long-term decarbonization goals. The City also modernized its permitting systems by launching eTRAKiT for online permitting as well as Symbium for instant approval of solar and, just recently, a suite of energy-efficiency permits, significantly improving efficiency and accessibility. Additionally, the City has allocated funds to issue no-cost permit fees for heat pump water heaters and heat pump HVACs. In tandem, the City is developing a water heater loaner program and revolving fund to simplify and accelerate adoption of electrification measures.

The City of Pinole adopted its inaugural CAAP [1] in August 2024 to achieve carbon neutrality by 2045, aligning with State goals and reducing the City’s contribution to global emissions. Building energy consumption from fossil fuels makes up approximately 32% of the Pinole community greenhouse gas emissions with building electrification identified as a key strategy.

Central measures in the CAAP’s Building Energy section include

  • BE-1 Electrify 100% of new construction in the City in 2024
  • BE-2 Electrify existing residential buildings to reduce natural gas consumption by 26% by 2030 and 100% by 2045
  • BE-3 Electrify existing commercial and mixed-use (i.e., combined commercial and residential) buildings to reduce natural gas consumption 18% by 2030 and 100% by 2045

Actions under these measures to make progress towards these goals include

  • BE-1d Conduct an electrification infrastructure and capacity feasibility study to identify expected increases in electricity demand due to building and vehicle electrification and identify infrastructure improvements (including local renewable energy and storage projects) to increase capacity to meet demand.

  • BE-2c Complete a residential existing building electrification feasibility analysis by 2024 to determine the upfront and on-bill costs associated with building electrification strategies and draw on existing ordinances from similar jurisdictions to identify barriers to replacement and permit compliance (including equity barriers). This information will be used to inform and support future updates to the existing building electrification ordinances as well as the building electrification resource center (Action BE-2e)

  • BE-2h Conduct a cost-effectiveness study and design electricity and natural gas billing rates that make electrification the most cost-effective option to reduce energy bill burdens

  • BE-3a Complete an existing commercial building electrification feasibility analysis in 2024 to determine the upfront and on-bill costs associated with building electrification strategies and draw on existing ordinances from similar jurisdictions to identify barriers to replacement and permit compliance (including equity barriers).

The City was awarded Federal grant funds through the California Energy Commission Local Government Building Decarbonization Challenge to support preparation of these programs. The resulting fixed-fee contract will be entirely funded with grant funds and scope of services will be subject to all grant terms and conditions.



Timeline

Release Project Date:
August 28, 2026
Question Submission Deadline:
September 9, 2026, 11:59pm
Question Response Deadline:
September 16, 2026, 5:00pm
Response Submission Deadline:
September 21, 2026, 5:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...gallons and delivered to consumers via a distribution pipe system. The City's main ...

City of Lemoore

Bid Due: 10/29/2026

..., and repair services for twenty-four (24) potable water storage reservoirs ranging between ...

Mission Springs Water District

Bid Due: 10/06/2026

...Project ID: 2026-RFP-0399 Title: Low-Interest Solar and Energy Storage Loan Program Addenda: 3... ...

City of Pasadena

Bid Due: 9/22/2026

...to demolition of an existing bathroom, storage room, and kitchen space to create ...

Napa County

Bid Due: 10/06/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.