REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
| Location: |
Indiana |
| Posted: |
Aug 5, 2025 |
| Due: |
Sep 10, 2025 |
| Agency: |
Brownsburg town |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Publication URL: |
To access bid details, please log in. |
|
Bid Title:
|
REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
|
|
Category:
|
Capital Projects
|
|
Status:
|
Open
|
|
Description:
|
|
The Town of Brownsburg (TOB) is seeking turn-key professional Engineering services necessary for improvements along the North Green Street Corridor.
Earlier this year, First Group Engineering performed a traffic impact analysis of the corridor. The results of this study are attached for reference purposes only. The finalized recommended improvements approach is as follows:
“Alternative 2: Traffic Warrants + Additional Lane Improvements. This improvement was found to have the lowest overall delay and the second lowest cost. It should be noted that the intersections of Green St and the I-74 ramps fall under INDOT jurisdiction and thus any improvements to these intersections will require coordination with the INDOT Crawfordsville District.
The existing traffic signals along Green Street operate as part of a coordinated system. Any proposed signal installations in this study are intended to integrate with that system to support efficient corridor-wide traffic flow and minimize delay during peak periods. This coordinated system will help closely spaced signalized intersections operate in a way to avoid traffic queues from one signalized intersection backing up into another signalized intersection.”
The agreed upon final intersection improvements are below:
-
Green St & Loraine Dr
-
Green St & Kroger Entrance
-
Right In – Right Out Intersection, Restricted Left Turn
-
Green St & Northfield Dr
-
Green St & WB Ramps to I-74
-
Change the Eastbound Thru Lane to an Eastbound Left Thru Lane
-
Green St & Maplehurst Dr
-
Green St & Whittington Dr
-
Right In – Right Out Intersection, Northbound Right Turn Lane
|
|
Publication Date/Time:
|
|
8/5/2025 8:00 AM
|
|
Closing Date/Time:
|
|
9/10/2025 2:00 PM
|
|
Submittal Information:
|
|
Proposal shall be electronically submitted by 2:00 PM on 9/10/25
|
|
Contact Person:
|
RFP questions shall be submitted via email only. Response to questions shall
be distributed by addendum via email only. Emails shall be submitted to as
follows:
Sarah Craft sarah@kramercorporation.com
Shawn Pabst spabst@brownsburg.org
Aaron Kaytar akaytar@brownsburg.org
|
|
Related Documents:
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Event Name: Sunflower seed, herbicide Brookville Lake 157953 Agency: Natural Resources Event ID:
State Government of Indiana
Bid Due: 8/18/2026
Post Date 07/16/2026 Quest Number 10285360 Category Code Asphalt Overlay, Rehab. and/or Maint.,Asphalt
City of Fort Wayne
Bid Due: 8/06/2026
Post Date 07/16/2026 Quest Number 10276309 Category Code Professional Services Bid/Request Name City
City of Fort Wayne
Bid Due: 8/13/2026
0860C - Westwood Valley Concrete Street Repairs Quest Number: 10268525 Closing Date: Thu,
City of Fort Wayne
Bid Due: 7/30/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.