| Location: | Utah |
|---|---|
| Posted: | Oct 19, 2025 |
| Due: | Nov 3, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-48 |
| Publication URL: | To access bid details, please log in. |
Project Description: The purpose of this RFPQ (Request for Pre-Qualification) is to obtain pre-qualification packages from Contractors. This is part 1 of a 2-part process to award a contractor with the 900 East Storm Drain Phase 2 project. Contractors who show adequate qualification for this project in the pre-qualification will be able to bid in part 2.
900 East Storm Drain Phase 2 includes over 3,200 feet of 42-inch and 36-inch RCP storm drain pipe installed in UDOT roadway (900 East) and Muray City roadway. The storm drain trunkline will be installed ten to thirteen feet deep in groundwater conditions (five to seven feet deep). Additionally, this project includes 15-inch, 18-inch, and 30-inch storm drain pipe, manholes, catch basins, asphalt restoration, and concrete replacement.

With GovernmentContracts, you can: