| Location: | Florida |
|---|---|
| Posted: | Oct 19, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-25-014 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Lake Marion WRF Advanced Wastewater Treatment (AWT) Project is located at 1001 Lake Marion Creek Dr., Poinciana, Florida 34759. The existing WRF has a permitted capacity of 3.0 million gallons per day (MGD) annual average flow (AADF) and utilizes Modified LudzackāEttinger (MLE) process for biological nutrient removal. The project will modify the biological nutrient removal (BNR) process by adding new baffle walls, mixers, new internal recycle (IR) pumps, air pipe modifications, reconfigurations of existing aeration basins, and a new chemical feed and storage to meet AWT standards. In addition, the project will include a new mechanical screen, pretreatment concrete and protective coating repairs at the headworks, a new odor control system, disc filter replacement, reject pond liner repairs, construction of a metal storage building, and installation of a new generator.

With GovernmentContracts, you can:
...Engineering, Inc. completed a "Treated Water Transmission, Storage, and Pumping Facilities Plan.... Petersburg. ...
City of St. Petersburg
Bid Due: 8/06/2026
...1412198278 (IFB) Replacement of Sodium Hypochlorite Tanks at Community Hall Water Treatment Plant... ...
JEA
Bid Due: 8/05/2026
...: Toho Water Authority is soliciting bids from qualified and experienced contractors to ...
Toho Water Authority
Bid Due: 8/06/2026
...) water reclamation facilities, and nine (9) reclaimed storage and pumping facilities, and ...
Clay County Utility Authority
Bid Due: 7/27/2026