195 Scott Swamp Road
Farmington, CT 06032
www.qamarch.com
(860) 677–4594 office
(860) 677–8534 fax
FAX
DATE: 05/13/2026 JOB # 2386
RE: New Units at River Bend
For Litchfield Housing Authority
Addendum #1
PLEASE COMPLETE SECTION BELOW AND FAX OR EMAIL BACK TO
860-677-8534 OR EBENKEN@QAMARCH.COM
Received (Addendum #1)
CONTRACTOR :
SIGNED :
Date:
NUMBER OF PAGES INCLUDING COVER PAGE:
41
FROM: Erin Benken
If the attached is incomplete, kindly notify us at once.
New Units at River Bend
Addendum #1
05/14/2026
General/Clarifications
May 12, 2026 Pre Bid
(See Attached)
Walkthrough Attendance List
Plan Holders List
(See Attached)
RFI’s
RFI’s must be received no later than 5:00pm on Tuesday, May 19, 2026 to
receive consideration.
Direct all RFI’s via email to Erin Benken at ebenken@qamarch.com
Final Addendum
A final addendum, if necessary, will be issued by 5:00 pm on May 21, 2026.
BIDS DUE
2:00 pm on Thursday, May 28, 2026
Office of the First Selectman
Litchfield Town Hall
74 West Street, Litchfield, CT 06759
RFI Questions
-------------------------------------------------------------------------------------------------------------------------------------
Question #1
What are the expected working hours?
Answer #1
Working hours will be set with the selected contractor, in order to be
respectful of the adjacent affordable housing development.
-------------------------------------------------------------------------------------------------------------------------------------
Question #2
Is there a budget in mind?
Answer #2
Not yet. Budget will be based on bid pricing.
-------------------------------------------------------------------------------------------------------------------------------------
Question #3
What is the expected project timeline? And anticipated start time?
Answer #3
We expect work to conclude approximately one year from when the
Connecticut Dept. of Housing awards the construction funding. The
anticipated start date will depend on how quickly CT DOH reviews and
approves the funding request but it may be as early as Fall 2026.
-------------------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------------
Question #4
What permits are needed?
Answer #4
Only the Building Permit is needed. We’ve already received all other town
required approvals (Historic District Commission, Inland Wetlands
Commission, Planning & Zoning Commission).
-------------------------------------------------------------------------------------------------------------------------------------
Question #5
Do CHRO requirements apply?
Answer #5
Yes. See specifications.
-------------------------------------------------------------------------------------------------------------------------------------
Question #6
Is some of the project in the Wetland area?
Answer #6
Yes, a corner of the parcel is in the regulated area.
-------------------------------------------------------------------------------------------------------------------------------------
Question #7
Will the Town Inland Wetlands Commission require any special conditions?
What are the conditions of all approved town permits?
Answer #7
The Zoning permit requires a pre-construction meeting with Town Staff to be
held prior to the start of construction. Additionally a Land Use Administrator
will inspect erosion controls prior to the start of construction.
-------------------------------------------------------------------------------------------------------------------------------------
Question #8
Is there any CHFA funding?
Answer #8
No.
-------------------------------------------------------------------------------------------------------------------------------------
Question #9
Are the buildings slab on grade?
Answer #9
Yes.
-------------------------------------------------------------------------------------------------------------------------------------
Question #10
I was looking through the specs for this project and saw on the notice of bid
that a P&P bond will be required, but that a bid bond is NOT required? Please
confirm this for accuracy.
Answer #10
This is correct. Payment and performance bonds are required. A bid bond is
not required.
-------------------------------------------------------------------------------------------------------------------------------------
Question #11
There is no geotechnical report. The specs imply there is rock. Please provide
the geotechnical report that identifies how much rock will be encountered.
Answer #11
See geotechnical report. [attached]
-------------------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------------------
Question #12
Washing machines and dryers are not listed in the specs. Are they provided by
others?
Answer #12
Washing machines will be tenant provided and are shown on the drawings for
reference only. Contractor to provide all hookups to each laundry closet.
-------------------------------------------------------------------------------------------------------------------------------------
Question #13
Please confirm smart cabinets are required and products from CNC or Express
are not acceptable.
Answer #13
See specification section 123530 Residential Casework for acceptable
manufacturers. Please follow requirements outlined in section 016000 for any
substitution requests.
-------------------------------------------------------------------------------------------------------------------------------------
Question #14
The siding spec calls for vinyl siding, the wall sections call for hardie plank.
Please advise.
Answer #14
Provide fiber cement siding as shown in the wall sections. See new
specification section 074646 Fiber Cement Siding. [attached]
-------------------------------------------------------------------------------------------------------------------------------------
Changes to Specifications
012200:
Remove duplicate Unit Prices specification section. The correct unit price
section includes only one unit price for rock excavation.
012300:
Remove Alternates 1 (Asphalt shingles) and 3 (Well Depth) from the project.
Change Alternate #2 (Rock Excavation) to Alternate #1. [attached]
074646:
Add Fiber Cement Siding specification section in its entirety. [attached]
Changes to Drawings
S0.1
Add Sheet in its entirety. [attached]
S0.2
Add Sheet in its entirety. [attached]
S1.1
Add Sheet in its entirety. [attached]
S1.2
Add Sheet in its entirety. [attached]
S1.3
Add Sheet in its entirety. [attached]
S2.0
Add Sheet in its entirety. [attached]
S2.1
Add Sheet in its entirety. [attached]
S3.0
Add Sheet in its entirety. [attached]
S4.0
Add Sheet in its entirety. [attached]
S4.1
Add Sheet in its entirety. [attached]
S5.0
Add Sheet in its entirety. [attached]
End of Addendum #1