| Location: | Indiana |
|---|---|
| Posted: | Apr 12, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | Gary Sanitary District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: MANHOLE REPLACEMENT AND SANITARY SEWER REPAIR AT 4309 BUCHANAN STREET
Addenda: 0
Release Date: 4/12/2026
Due Date: 4/23/2026
MANHOLE REPLACEMENT
Remove existing Manhole No. 85 and replace with the new 4-foot diameter precast Manhole No. 85.
ALTERNATIVE 1 : Pipe Bursting
Pipe burst existing 12-inch VCP pipe with new 12-inch-high density polyethylene (HDPE) pipe. New HDPE pipe shall be manufactured from a high density, high molecular weight polyethylene resin which conforms to ASTM D1248 and meets the requirements for Type III, Class A, Grade P34, Category 5, and has a Plastic Pipe Institute (PPI) rating of PE 3408 when compounded
ALTERNATIVE 2 : CIPP Lining and Point Repair
SEE ATTACHED BID SPECIFICATION

With GovernmentContracts, you can:
...Gary Sanitary District Addenda: 0 Release Date: 5/8/2026 Due Date: 6/5/2026 Follow REQUEST ...
Gary Sanitary District
Bid Due: 6/05/2026
...: approximately 4,900 LF of 10" sanitary sewer force main with associated appurtenances ...
City of Fort Wayne
Bid Due: 6/18/2026
...PREVENTIVE MAINTENANCE, EMERGENCY CALL-OUT & AFTER-HOURS SERVICE AGREEMENTGARY SANITARY DISTRICT... transfer switches, and ...
Gary Sanitary District
Bid Due: 6/05/2026
...by Gary Sanitary District (GSD). This agreement is intended to: Maintain reliable operation ...
Gary Sanitary District
Bid Due: 6/05/2026