| Location: | Florida |
|---|---|
| Posted: | Feb 28, 2026 |
| Due: | Mar 27, 2026 |
| Agency: | City of Lakeland |
| Type of Government: | State & Local |
| Category: | |
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: MGT1 CO2 Fire System replacement excluding existing piping and detectors
Addenda: 0
Release Date: 2/27/2026
Due Date: 3/27/2026
Replacement of the MGT1 CO2 Fire Protection System bottles, solenoids, hoses, fittings and connections. Replacement of the Fire Alarm Control Panel (FACP) that is currently obsolete. Verify all devices are operable and replace any devices, horns, strobes, alarms, pull stations and detectors that are faulty. Verify wiring is adequate, if not replace any wiring and conduit as necessary.
The current CO2 Fire system is obsolete and requires replacement with like kind. Most bottles and hoses are at end of life. The FACP is obsolete.

With GovernmentContracts, you can:
Project ID: Title: Median Holiday Lights Phase 3C Addenda: 0 Release Date: 9/11/2026
City of Dania Beach
Bid Due: 10/02/2026
Project ID: 26-8677 Title: Adaptive Traffic Control System-Grant Funded Addenda: 0 Release Date:
Collier County
Bid Due: 10/12/2026
Solicitation Details You can review the detailed information about the solicitation here. If
Manatee County
Bid Due: 10/07/2026
NOTICE OF INVITATION TO BID STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION BID
State Government of Florida
Bid Due: 10/13/2026