| Location: | Florida |
|---|---|
| Posted: | Feb 28, 2026 |
| Due: | Mar 27, 2026 |
| Agency: | City of Lakeland |
| Type of Government: | State & Local |
| Category: | |
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: MGT1 CO2 Fire System replacement excluding existing piping and detectors
Addenda: 0
Release Date: 2/27/2026
Due Date: 3/27/2026
Replacement of the MGT1 CO2 Fire Protection System bottles, solenoids, hoses, fittings and connections. Replacement of the Fire Alarm Control Panel (FACP) that is currently obsolete. Verify all devices are operable and replace any devices, horns, strobes, alarms, pull stations and detectors that are faulty. Verify wiring is adequate, if not replace any wiring and conduit as necessary.
The current CO2 Fire system is obsolete and requires replacement with like kind. Most bottles and hoses are at end of life. The FACP is obsolete.

With GovernmentContracts, you can:
...approximately 50 linear feet of new electrical conduit and wiring, integrating the pump ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
...existing equipment, wiring, conduit, devices, all necessary permits, certifications, and approvals...
City of Orlando
Bid Due: 9/21/2026
...work will include installation of conduit, pull boxes, and other infrastructure required to ...
City of Port St. Lucie
Bid Due: 10/09/2026
...work will include installation of conduit, pull boxes, and other infrastructure required to ...
City of Port St. Lucie
Bid Due: 10/01/2026