| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66732-NONST-2026-000000002 | Wastewater Treatment Facility Improvements | Comer, City Of |
Oct 16, 2025 @ 11:55 AM
|
Nov 19, 2025 @ 10:00 AM
|
Start Date: Oct 16, 2025 @ 11:55 AM ET
End Date:
Nov 19, 2025 @ 10:00 AM ET
The project consists of, but is not limited to, the following major elements:
Bidder agrees to furnish all materials and equipment and perform all labor necessary to
construct the improvements to the wastewater treatment facility as shown on the
Drawings and as specified. More specifically, the work shall include, but not be limited
to, modifications to the existing aeration system including removal of the floating aerator
in the aeration pond and installation of a diffused aeration system in the aeration pond
and aerated lagoon, and modifications to the existing 8" transfer pipe, piers, and splash
pad in the aerated lagoon. The work also includes demolition, earthwork, site work, yard
piping, erosion and sediment control measures, grassing, construction staking,
mobilization/demobilization, bonds, insurance, delivery of materials, take offs and all
other appurtenances required for completion of the work as shown and as specified.
| Code | Description |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |