| Location: | Georgia |
|---|---|
| Posted: | Jul 22, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA483026Q0059 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
*THIS IS A SOURCES SOUGHT*
The Panther II is a tri-band, man-portable Very Small Aperture Terminal (VSAT) system designed for high-speed data communications, including Internet access, VPN connectivity, and video transmission. This requirement focuses exclusively on the X-Band configuration, which is optimized for military satellite communications. The system is available with 60 cm and 96 cm parabolic reflector antennas and supports both manual and auto-acquisition modes. Its lightweight and rugged design allows for transport in a rucksack or airline-checkable hard case.
This is a requirement aimed at enhancing tactical communication capabilities through the deployment of X-Band VSAT systems.
Critical Performance Requirements and Risk Factors
· High Data Throughput: The system must support data rates up to 3 Mbps transmit and 45 Mbps receive over X-Band frequencies.
· Rapid Deployment: The system should allow for quick setup and acquisition, minimizing the time to establish communications.
· Environmental Resilience: The equipment must operate effectively in temperatures ranging from -32°C to +50°C and withstand wind speeds up to 45 mph with proper anchoring.
· Power Efficiency: The system should support power-saving features and operate on various power sources, including 10-48VDC and 90-264VAC.
Risk Factors:
· Environmental Conditions: Extreme temperatures and high wind speeds may affect system performance.
· Power Supply Variability: Dependence on external power sources may pose challenges in remote locations.
Quantities and Sustainment
The initial procurement is for 1 Panther II X-Band system. Future sustainment will involve maintenance support, potential upgrades, and procurement of additional units based on operational needs.

With GovernmentContracts, you can:
INVITATION TO BID VEHICLE: HEAVY DUTY BID REF. #04-079 #04-079 Part 2 March
City of Albany
Bid Due: 2/03/2031
BL081-24 INV Purchase of a Swift Water Rescue Boat Buyer Contact : casey.beauston@gwinnettcounty.com
Gwinnett County
Bid Due: 12/31/2029
Bid Title: GENERAL CONTRACTORS TO CONSTRUCT AND/OR PERFORM REPAIRS AND REHABILITATION ON RESIDENTIAL
City of Newnan
Bid Due: 9/30/2031
Follow TS Zeta Multiple Trail Bridges Replacement Active Contract Opportunity Notice ID 12445525B0014
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/22/2026