| Location: | North Carolina |
|---|---|
| Posted: | Nov 11, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 98-26-005 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 98-26-005 |
| Project Title: | De-Escalation Training Center |
| Description: | Minor renovations of an existing Classroom building to provide new power and data drops from one space to another, and conduit infrastructure feeds from the existing building to a new building pad adjacent the existing building. Site improvements include a new parking lot in a currently wooded area, graded site and building pad, underground conduit infrastructure, dry hydrant stub installation, and ditch repair with new stormwater piping section. Coordination of overhead utility connections with City of Gastonia Electric. The Electrical subcontractor shall also assume terminating electrical feeds of vendor provided and erected modular building. |
| Opening Date: | 12/18/2025 2:00 PM |
| Posted Date: | 11/12/2025 |
| Status: | Open |
| Department: | GASTON COLLEGE |
|
Solicitation Number
*
98-26-005
|
Department
GASTON COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2025-12-18T14:00:00.0000000
|
Posted Date
*
2025-11-11T18:39:34.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2025-11-24T05:00:00.0000000Z
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Mike Whiteman
|
|||
|
Description
Minor renovations of an existing Classroom building to provide new power and data drops from one space to another, and conduit infrastructure feeds from the existing building to a new building pad adjacent the existing building. Site improvements include a new parking lot in a currently wooded area, graded site and building pad, underground conduit infrastructure, dry hydrant stub installation, and ditch repair with new stormwater piping section. Coordination of overhead utility connections with City of Gastonia Electric. The Electrical subcontractor shall also assume terminating electrical feeds of vendor provided and erected modular building.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Solicitation Number: SCO-CM@Risk- NCDOA- Office of the Secretary of State Renovation Project Title...: ...
State Government of North Carolina
Bid Due: 6/19/2026
...Renovation Description: The Project consists generally of the following major items: Renovation... of ...
State Government of North Carolina
Bid Due: 7/14/2026
...-story, 12,629 SF arts center building and the renovation of the remaining building. ...
State Government of North Carolina
Bid Due: 6/12/2026
...(Optional) https://facilities.ofa.ncsu.edu/category/ads/ Project Name B121 Burlington Lab Renovation... Bidding from prequalified firms on ...
North Carolina State University
Bid Due: 6/25/2026