Project Description:
Scope of Work:
Notice to bidders, this project is considered urgent and work schedule/progress will be tracked closely by State. The scope of work for this project includes demolition/removal of existing Interstate Route H-3 Replacement Of Windward Viaduct Expansion Joint 2 O.B. Sta. 274+49.91± per demolition plan and installation of new expansion joint per manufactuer\'s instructions. Location/additional notes found on plan attached.
Special Notes:
1. Contractor must supply shop drawings within 2 weeks of the Notice to Proceed (NTP). The Contractor shall procure all materials within 1 month, after shop drawings are approved by the State. Once the Contractor has all materials, permits, and training, Contractor to work with the State to determine the earliest start date.
2. The Contractor shall install expansion joints in sections, one lane at a time, requiring splicing as needed and shall follow manufacturer\'s instructions. Note, State will not allow full closures of H-3, and will only allow single lane closures for this work.
3. The Contractor shall familiarize themselves with repair materials/equipment needed and obtain installation training from manufacturer prior to work as required by State.
4. The Contractor shall be available for this work immediately and must be licensed and highly skilled in this type of repair with proof of and in good standing. If lowest bidder Contractor is not available immediately nor licensed, State will reject bid and award next lowest bidder. The State additionally reserves the right to award to the best-value bidder.
5. A pre-construction meeting with representatives from affected Agencies, State, and the Contractor shall be held prior to commencement of construction as required.
6. Work days/hours for this project will be specific and needs to be coordinated with State. Work may be performed only between the hours of 8:00 p.m. and 4:00 a.m., Monday through Friday, except State Holidays, unless otherwise approved in writing by the District Engineer.
7. License Requirements: All bidders must possess a valid \"Type A\" General Contractor\'s License at the time of bid submission and throughout the contract duration. If any sub-contractors are used, they must be provided with the contractor\'s bid.
8. Liquidated Damages of $1,000.00/day may be assessed to the contractor when deadlines are not met.
9. Contractor must be responsive to all DOT inquiries and requests, within one working day.